S Square
Deedo IDDP-PUN-GK5DMahaRERA shows it completed, after its date was pushed back 7 months; no MahaRERA orders on record; 21% of its units are booked.
Bavadhan Bk, Pune 411021 · Property rates in Bavadhan Bk · by Sandip Madhav Bhadale
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed, after its date was pushed back 7 months
- This projectRegistered 8 Nov 2023, completion promised 31 Mar 2025, revised to 15 Oct 2025.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100053501
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100053501 | 8 Nov 2023 | 31 Mar 2025 | 15 Oct 2025 | Sandip Madhav Bhadale | Project page |
Documents139
2 documents held by Deedo, 137 filings listed on MahaRERA's project page
Finance
- PAN CardPAN-Sandip Bhadale.pdf · uploaded 27 Jul 2023Source
Legal
- Declaration Form Baffidavit cum declaration_Sandip Bhadale.pdf · uploaded 16 Sep 2023Source
- Legal Title reportRevised Title Search Report 20231016190232_11zon.pdf · uploaded 17 Oct 2023Source
- Legal Title reportTitle Certificate.pdf · uploaded 26 Mar 2025Source
- Legal Title reportTSR Updated.pdf · uploaded 26 Mar 2025Source
- Declaration Form BAffidavit Cum Declaration - S Square Realty.pdf · uploaded 26 Apr 2025Source
Show all 139 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardPAN-Sandip Bhadale.pdf · uploaded 27 Jul 2023Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN_11zon.pdf · uploaded 27 Jul 2023Source
- 2 Copy of Layout Approval (in case of layout)LAYOUT PLAN 2_11zon.pdf · uploaded 27 Jul 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentSanction Plan_11zon (1).pdf · uploaded 27 Jul 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentComecment Certificate_11zon.pdf · uploaded 27 Jul 2023Source
- 1 Declaration about Commencement CertificateDeclaration for Commencement Certificate.pdf · uploaded 27 Jul 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ANNEXURE A SCAN COPY.pdf · uploaded 27 Jul 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 27 Jul 2023Source
- 1 Deviation Report with respect to model copy of AgreementAFS Deviation Letter.pdf · uploaded 27 Jul 2023Source
- 1 Disclosure of sold/ booked inventoryS Sq Reality.pdf · uploaded 2 Aug 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form3_11zon.pdf · uploaded 2 Aug 2023Source
- 1 a Details of encumbrances concerned to FinanceEncumbrances declaration.pdf · uploaded 7 Aug 2023Source
- 1 b Details of encumbrances concerned to LegalEncumbrances declaration.pdf · uploaded 7 Aug 2023Source
- 1 CERSAI detailsCersai declaration.pdf · uploaded 7 Aug 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest in other organisations.pdf · uploaded 7 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate bank declaration.pdf · uploaded 7 Aug 2023Source
- 1 Proforma of Agreement for saleRERA Agreement for Sale_Corrected_v1.pdf · uploaded 30 Aug 2023Source
- 1 Proforma of Allotment letterRERA Allotment Letter_Corrected_v1 - (1).pdf · uploaded 30 Aug 2023Source
- 1 Deviation Report with respect to Allotment letterAllotment Of The Unit Letter.pdf · uploaded 30 Aug 2023Source
- 1 Declaration in FORM Baffidavit cum declaration_Sandip Bhadale.pdf · uploaded 16 Sep 2023Source
- 1 Copy of the legal title reportRevised Title Search Report 20231016190232_11zon.pdf · uploaded 17 Oct 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect's Certificate.pdf · uploaded 6 Oct 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A - Declaration about RERA Bank Account.pdf · uploaded 6 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B - Opening of RERA Bank Account.pdf · uploaded 6 Oct 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameilovepdf_merged.pdf · uploaded 6 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)DocScanner Oct 2, 2024 6-10 PM (1).pdf · uploaded 6 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 2024-25 Q1.pdf · uploaded 6 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate.pdf · uploaded 6 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect's Certificate.pdf · uploaded 6 Oct 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A - Declaration about RERA Bank Account.pdf · uploaded 6 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B - Opening of RERA Bank Account.pdf · uploaded 6 Oct 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameilovepdf_merged.pdf · uploaded 6 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)DocScanner Oct 2, 2024 6-10 PM (1).pdf · uploaded 6 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 2024-25 Q1.pdf · uploaded 6 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate.pdf · uploaded 6 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect's Certificate.pdf · uploaded 6 Oct 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A - Declaration about RERA Bank Account.pdf · uploaded 6 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B - Opening of RERA Bank Account.pdf · uploaded 6 Oct 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameilovepdf_merged.pdf · uploaded 6 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)DocScanner Oct 2, 2024 6-10 PM (1).pdf · uploaded 6 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 2024-25 Q1.pdf · uploaded 6 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate.pdf · uploaded 6 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect's Certificate.pdf · uploaded 6 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)DocScanner Oct 2, 2024 6-10 PM (1).pdf · uploaded 6 Oct 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 2024-25 Q1.pdf · uploaded 6 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate.pdf · uploaded 6 Oct 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A - Declaration about RERA Bank Account.pdf · uploaded 6 Oct 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameilovepdf_merged.pdf · uploaded 6 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B - Opening of RERA Bank Account.pdf · uploaded 6 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 upto Dec 2024.pdf · uploaded 21 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 upto Dec 2024.pdf · uploaded 21 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q2 Signed.pdf · uploaded 25 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3 FY 2024-25 Signed.pdf · uploaded 25 Feb 2025Source
- 1 Copy of the legal title reportTitle Certificate.pdf · uploaded 26 Mar 2025Source
- 2 Copy of the legal title reportTSR Updated.pdf · uploaded 26 Mar 2025Source
- 1 Copy of Layout Approval (in case of layout)scan 18.pdf · uploaded 26 Mar 2025Source
- 2 Copy of Layout Approval (in case of layout)scan 19.pdf · uploaded 26 Mar 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentSKM_36724102316080.pdf · uploaded 26 Mar 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentscan 17_11zon.pdf · uploaded 26 Mar 2025Source
- 1 Declaration in FORM BAffidavit Cum Declaration - S Square Realty.pdf · uploaded 26 Apr 2025Source
- 2 Declaration in FORM BAffidavit Cum Declaration - S Square Realty.pdf · uploaded 26 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate - Mar-25.pdf · uploaded 26 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3.pdf · uploaded 26 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate - Mar-25.pdf · uploaded 26 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold and Booked Inventory - S Square Realty.pdf · uploaded 26 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM -2A - Engineer's Certificate_2024.pdf · uploaded 26 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM -2A - Engineer's Certificate_2024.pdf · uploaded 26 Apr 2025Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Signed.pdf · uploaded 26 Apr 2025Source
- Form 5 (FY 2023-2024)Form 5 Signed.pdf · uploaded 14 Oct 2025Source
- Form 1Form 1 - Architect's Certificate.pdf · uploaded 15 Oct 2025Source
- Form 2Form 2 Engineer's Certificate.pdf · uploaded 15 Oct 2025Source
- Form 3Form 3.pdf · uploaded 15 Oct 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory 2023-24 Q3 Signed.pdf · uploaded 15 Oct 2025Source
- Self-declaration of Quarterly ProgressSelf Decakration of QPR FY 2023-24 Q3 Signed.pdf · uploaded 15 Oct 2025Source
- Form 1Form 1 - Architect's Certificate.pdf · uploaded 15 Oct 2025Source
- Form 2Form 2 Engineer's Certificate.pdf · uploaded 15 Oct 2025Source
- Form 3Form 3.pdf · uploaded 15 Oct 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory FY 2023-24 Q4 Signed.pdf · uploaded 15 Oct 2025Source
- Self-declaration of Quarterly ProgressSelf Declaration of QPR FY 2023-24 Q4 Signed.pdf · uploaded 15 Oct 2025Source
- Form 1Form 1 - Architect's Certificate.pdf · uploaded 15 Oct 2025Source
- Form 2Form 2 Engineer's Certificate.pdf · uploaded 15 Oct 2025Source
- Form 3Form 3.pdf · uploaded 15 Oct 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory FY 2024-25 Q1 Signed.pdf · uploaded 15 Oct 2025Source
- Self-declaration of Quarterly ProgressSelf Declaration QPR Signed.pdf · uploaded 15 Oct 2025Source
- Form 1Form 1.pdf · uploaded 15 Oct 2025Source
- Form 2Form 2.pdf · uploaded 15 Oct 2025Source
- Form 3Form 3 Q2 Signed.pdf · uploaded 15 Oct 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory FY 2024-25 Q2 Signed.pdf · uploaded 15 Oct 2025Source
- Self-declaration of Quarterly ProgressSelf Declaration FY 2024-25 Q2 Signed.pdf · uploaded 15 Oct 2025Source
- Form 1Form 1.pdf · uploaded 15 Oct 2025Source
- Form 2Form 2.pdf · uploaded 15 Oct 2025Source
- Form 3Form 3 Q2 Signed.pdf · uploaded 15 Oct 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory FY 2024-25 Q2 Signed.pdf · uploaded 15 Oct 2025Source
- Self-declaration of Quarterly ProgressSelf Declaration FY 2024-25 Q2 Signed.pdf · uploaded 15 Oct 2025Source
- Form 1Form 1 Architect's Certificate - Mar-25.pdf · uploaded 15 Oct 2025Source
- Form 2Form 2 Engineer's Certificate - Mar-25.pdf · uploaded 15 Oct 2025Source
- Form 3Signed Form 3.pdf · uploaded 15 Oct 2025Source
- Disclosure of Sold and Booked InventorySold Unsold inventory FY 2024-25 Q4.pdf · uploaded 15 Oct 2025Source
- Self-declaration of Quarterly ProgressSelf declaration of QPR FY 2024-25 Q4 Signed.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 3Form 3 Qtr 1 FY 2025-26 (2) SIGNED.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 3Form 3 Qtr 2 FY 2025-26 (2) SIGNED.pdf · uploaded 15 Oct 2025Source
- Form 2A (FY 2023-2024)Form 2A.pdf · uploaded 15 Oct 2025Source
- Occupational CertificateOccupancy Certifiacte.pdf · uploaded 15 Oct 2025Source
- Form 5 (FY 2024-2025)FORM 5 FY 2024-25.pdf · uploaded 16 Oct 2025Source
- Form 2A (FY 2024-2025)Engineers Certificate.pdf · uploaded 18 Oct 2025Source
Technical
- DocumentLAYOUT PLAN_11zon.pdf · uploaded 27 Jul 2023Source
- DocumentLAYOUT PLAN 2_11zon.pdf · uploaded 27 Jul 2023Source
- DocumentSanction Plan_11zon (1).pdf · uploaded 27 Jul 2023Source
- Documentscan 18.pdf · uploaded 26 Mar 2025Source
- Documentscan 19.pdf · uploaded 26 Mar 2025Source
- Documentscan 17_11zon.pdf · uploaded 26 Mar 2025Source
Technical (Architect)
- DocumentForm 1 - Architect's Certificate.pdf · uploaded 6 Oct 2024Source
- DocumentForm 1 - Architect's Certificate.pdf · uploaded 6 Oct 2024Source
- DocumentForm 1 - Architect's Certificate.pdf · uploaded 6 Oct 2024Source
- DocumentForm 1 - Architect's Certificate.pdf · uploaded 6 Oct 2024Source
- DocumentForm 1 upto Dec 2024.pdf · uploaded 21 Feb 2025Source
- DocumentArchitect's Certificate - Mar-25.pdf · uploaded 26 Apr 2025Source
- DocumentForm 1.pdf · uploaded 15 Oct 2025Source
Technical (Engineer)
- DocumentEngineer's Certificate.pdf · uploaded 6 Oct 2024Source
- DocumentEngineer's Certificate.pdf · uploaded 6 Oct 2024Source
- DocumentEngineer's Certificate.pdf · uploaded 6 Oct 2024Source
- DocumentEngineer's Certificate.pdf · uploaded 6 Oct 2024Source
- DocumentForm 2 upto Dec 2024.pdf · uploaded 21 Feb 2025Source
- DocumentEngineer's Certificate - Mar-25.pdf · uploaded 26 Apr 2025Source
- DocumentForm 2.pdf · uploaded 15 Oct 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel PLOT NO. A7B, PLOT NO A8
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, 4BHK, 5BHK & more, Office space, Shop19 units in all
- Address
- S. No. 63/1 A, Plot No. A-7b And Plot No A-8, Bavdhan Road, Bavdhan KhurdPIN 411021
- Village
- Bavadhan BK, Mulshi taluka
- Location
- 18.50411, 73.76379
- Land area for this project
- 689 sq m (7,418 sq ft)
- Permissible built-up area
- 4,122 sq m (44,364 sq ft)
- Sanctioned built-up area
- 1,894 sq m (20,392 sq ft)
- Designated bank account
- 85
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S. NO. 63/1 A, PLOT NO. A-7B AND PLOT NO A-8
Boundaries
- North
- Adj 9m Road
- South
- Adj 9m Road
- East
- S No 63 1 A Adj Plot No 9 And Adj Plot No A7-A
- West
- Adj 9m Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking19 units
4 of 19 units booked (21%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 336.99 sq m · 3,627 sq ft | 6 | 1 |
| 3BHK | 125.55 sq m · 1,351 sq ft | 1 | 0 |
| 4BHK | 509.66 sq m · 5,486 sq ft | 2 | 2 |
| 5BHK & more | 258.93 sq m · 2,787 sq ft | 1 | 0 |
| Office space | 276.81 sq m · 2,980 sq ft | 4 | 1 |
| Shop | 214.6 sq m · 2,310 sq ft | 5 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Bhushan Kulkarni Kulkarni | — |
| Chartered accountant | Ca Shriram Somwanshi | — |
| Chartered accountant | Sunil Kanifnath Shejal | — |
| Engineer | Balkrishna Sunil Bidkar | — |
| Engineer | Neeraj Mahendra Upadhayay | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Bavadhan Bk
- Puraniks Abitante Fiore Phase 2D- 1RERA PR1265052602625
- Giridhar ResidencyRERA PM1260002601900
- Konbil TrinityRERA PC1260002601272
- Aakar Heights B WingRERA PR1260002600692
- Vtp Cielo MHADARERA PR1260002600369
- Puraniks Abitante Fiore Phase 2DRERA PR1264042600284
- K-ConnectRERA PC1260002502670
- Shubham KarotiRERA PM1260002502195
All 92 projects in Bavadhan Bk · Compare S Square with another project