Mixed · 1 building · 18 unitsRERA P52100049608

Yoovie Homes

Deedo IDDP-PUN-0RXN

Completion was pushed back 4 months, to Jul 2027; no MahaRERA orders on record.

Baner, Pune 411045 · Property rates in Baner · by Rohan Subhash Deshmukh

DeliveryExtended 4 moPromised Mar 2027 · now due Jul 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readPrice₹17,910 /sq ft58% above Baner · 4 registered sales

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jul 2027

  • This projectRegistered 22 Feb 2023, completion promised 31 Mar 2027, revised to 31 Jul 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Sep 2025Yoovie Homes · 201Primary sale5,724 sq ftView Primary sale, Sep 2025
Sep 2024Yoovie Homes · 1001Primary sale5,724 sq ftView Primary sale, Sep 2024
Sep 2024Yoovie Homes · 901Primary sale4,592 sq ftView Primary sale, Sep 2024
Sep 2024Yoovie Homes · 901Primary sale1,073 sq ftView Primary sale, Sep 2024

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100049608
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004960822 Feb 202331 Mar 202731 Jul 2027Rohan Subhash DeshmukhProject page
Documents121

1 document held by Deedo, 120 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card.pdf · uploaded 16 Dec 2022Source

Legal

  • Legal Title reportLEAGAL TITLE.pdf · uploaded 9 Feb 2023Source
  • Declaration Form Bfromb.pdf · uploaded 9 Feb 2023Source

Migrated

  • 1 PAN CardPan Card.pdf · uploaded 16 Dec 2022Source
  • 1 a Details of encumbrances concerned to FinanceNo Encumbrance Certificate.pdf · uploaded 16 Dec 2022Source
  • 1 b Details of encumbrances concerned to LegalNo Encumbrance Certificate.pdf · uploaded 16 Dec 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT.pdf · uploaded 16 Dec 2022Source
Show all 121 documentsShow fewer documents

Migrated

  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Work completion certificate from Architect.pdf · uploaded 16 Dec 2022Source
  • 1 CERSAI details1B No Encumbrance.pdf · uploaded 16 Dec 2022Source
  • 1 Proforma of Allotment letterALLOT 1.pdf · uploaded 16 Dec 2022Source
  • 1 Deviation Report with respect to Allotment letterDeviation.pdf · uploaded 16 Dec 2022Source
  • 1 Copy of the legal title reportLEAGAL TITLE.pdf · uploaded 9 Feb 2023Source
  • 1 Copy of Layout Approval (in case of layout)BUILDING PLAN.pdf · uploaded 9 Feb 2023Source
  • 1 Declaration about Commencement CertificateFORMD DECLARATION CC.pdf · uploaded 9 Feb 2023Source
  • 1 Declaration in FORM Bfromb.pdf · uploaded 9 Feb 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE ABOUT OTHER PROJECT.pdf · uploaded 9 Feb 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORM A BANK ACCOUNT.pdf · uploaded 9 Feb 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN2.pdf · uploaded 15 Feb 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FORM3.pdf · uploaded 15 Feb 2023Source
  • 1 Proforma of Agreement for saleAGREEMENT NEW.pdf · uploaded 15 Feb 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT.pdf · uploaded 15 Feb 2023Source
  • 1 Other – TechnicalNAREDCO.pdf · uploaded 20 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC Certificate WPC.pdf · uploaded 28 Jul 2023Source
  • 1 Disclosure of sold/ booked inventoryDocument1.pdf · uploaded 28 Jul 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 29 Jul 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC Certificate WPC (1).pdf · uploaded 13 Nov 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Eng Certificate_2023_10_25.pdf · uploaded 13 Nov 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)q1.pdf · uploaded 13 Nov 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)q2.pdf · uploaded 13 Nov 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)q3.pdf · uploaded 13 Nov 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH Q 4 JAN TO MARCH 2024.pdf · uploaded 28 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH Q1 APRIL TO JUNE 2024.pdf · uploaded 28 Dec 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH Q2 JULY TO SEP 2024.pdf · uploaded 28 Dec 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q 3 OCT TO DEC 2023_compressed.pdf · uploaded 28 Dec 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q 4 JAN TO MARCH 2024 OK_compressed.pdf · uploaded 28 Dec 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 2 Q1 APRIL TO JUNE 2024_compressed.pdf · uploaded 28 Dec 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 2 Q2 JULY TO SEP 2024_compressed.pdf · uploaded 28 Dec 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q 1 APRIL TO JUNE 2024 OK_compressed.pdf · uploaded 28 Dec 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q 2 JULY TO SEP yoohi home _compressed.pdf · uploaded 28 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q 4 JAN TO MARCH.pdf · uploaded 28 Dec 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q2 JULY TO SEP 2024.pdf · uploaded 28 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q1 APRIL TO JUNE 2024.pdf · uploaded 28 Dec 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC 2019 YOOVIE.pdf · uploaded 28 Dec 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC 4-6-2024 YOOVIE.pdf · uploaded 28 Dec 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC 29-8-2024 YOOVIE_compressed (1).pdf · uploaded 28 Dec 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentYOOVIE PLAN 1 NO_compressed.pdf · uploaded 28 Dec 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentYOOVIE PLAN 2NO_compressed.pdf · uploaded 28 Dec 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentYOOVIE PLAN 3 NO_compressed.pdf · uploaded 28 Dec 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentYOOVIE PLAN 4 NO_compressed.pdf · uploaded 28 Dec 2024Source
  • 1 Disclosure of sold/ booked inventorySOLD BOOK Q 2 2024 FINAL.pdf · uploaded 28 Dec 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 2023 2024_compressed.pdf · uploaded 28 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form - 5 - apr 23 - mar 24 (2).pdf · uploaded 28 Dec 2024Source
  • 1 a Details of encumbrances concerned to FinanceNo Encombrances VSBL_0001 yoovie homes_page-0001 (1).pdf · uploaded 16 Jan 2025Source
  • 1 b Details of encumbrances concerned to LegalNo Encombrances VSBL_0001 yoovie homes_page-0001 (1).pdf · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)arch cert.pdf · uploaded 29 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca cert_compressed.pdf · uploaded 29 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)eng cert.pdf · uploaded 29 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)LATEST_page-0001.pdf · uploaded 30 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate_compressed.pdf · uploaded 17 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)YOOVIE _page-0001.pdf · uploaded 17 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate.pdf · uploaded 17 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryQ3 OCT TO DEC.pdf · uploaded 17 Apr 2025Source
  • 2 Disclosure of sold/ booked inventoryQ 4 JAN TO MARCH.pdf · uploaded 17 Apr 2025Source
  • Form 1Architect Certificate_compressed (1).pdf · uploaded 30 Jul 2025Source
  • Form 2Engineer certificate.pdf · uploaded 30 Jul 2025Source
  • Form 3YOOVIE _page-0001.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked InventoryQ 4 JAN TO MARCH.pdf · uploaded 30 Jul 2025Source
  • Form 5 (FY 2024-2025)5 yoovie new.pdf · uploaded 30 Jul 2025Source
  • Withdrawal Update Form 1ARC Certificate WPC (1).pdf · uploaded 29 Aug 2025Source
  • Withdrawal Update Form 2Engineer certificate.pdf · uploaded 29 Aug 2025Source
  • Withdrawal Update Form 3FORM 3 YOOVIE NEW.pdf · uploaded 29 Aug 2025Source
  • Form 2A (FY 2024-2025)ENGG FORM 2A 2025.pdf · uploaded 2 Sep 2025Source
  • Withdrawal Update Form 1ARC Certificate WPC (1).pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 3CA Certificate.pdf · uploaded 10 Oct 2025Source
  • Withdrawal Update Form 1FORM 1 YOOVIE HOMES.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 1FORM 1 YOOVIE HOMES.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 2FORM 2 YOOVIE HOMES.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 2FORM 2 YOOVIE HOMES.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 3FORM 3 YOOVIE HOME.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 3FORM 3 YOOVIE HOME.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 1Arc Certificate form 1.pdf · uploaded 27 May 2026Source
  • Withdrawal Update Form 2Q 4Engineer Certificate Jan- March 2026.pdf · uploaded 27 May 2026Source
  • Withdrawal Update Form 3CA Certificate - form 3.pdf · uploaded 27 May 2026Source
  • Withdrawal Update Form 1Arc Certificate form 1.pdf · uploaded 29 May 2026Source
  • Withdrawal Update Form 2Q 4Engineer Certificate Jan- March 2026.pdf · uploaded 29 May 2026Source
  • Withdrawal Update Form 3CA Certificate - form 3 - jan-feb-mar.pdf · uploaded 29 May 2026Source
  • Withdrawal Update Form 1Architect Certificate.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 2Engg Certificate.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 3Q 1 FORM 3.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 1Architect Certificate july-spet 26.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 2Engineer Certificate.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 3CA Certificate - july - spet - 26.pdf · uploaded 12 Oct 2026Source

Technical

  • DocumentBUILDING PLAN.pdf · uploaded 9 Feb 2023Source
  • DocumentBUILDING PLAN2.pdf · uploaded 15 Feb 2023Source
  • Other – TechnicalNAREDCO.pdf · uploaded 20 Feb 2023Source
  • DocumentYOOVIE PLAN 1 NO_compressed.pdf · uploaded 28 Dec 2024Source
  • DocumentYOOVIE PLAN 2NO_compressed.pdf · uploaded 28 Dec 2024Source
  • DocumentYOOVIE PLAN 3 NO_compressed.pdf · uploaded 28 Dec 2024Source
  • DocumentYOOVIE PLAN 4 NO_compressed.pdf · uploaded 28 Dec 2024Source
  • DocumentSanction Plan - 1-8.pdf · uploaded 5 Apr 2026Source
  • DocumentSanction Plan - 2-8.pdf · uploaded 5 Apr 2026Source
  • DocumentSanction Plan - 3-8.pdf · uploaded 5 Apr 2026Source
  • DocumentSanction Plan - 4-8.pdf · uploaded 5 Apr 2026Source
  • DocumentSanction Plan - 5-8.pdf · uploaded 5 Apr 2026Source
  • DocumentSanction Plan - 6-8.pdf · uploaded 5 Apr 2026Source
  • DocumentSanction Plan - 7-8.pdf · uploaded 5 Apr 2026Source
  • DocumentSanction Plan - 8-8.pdf · uploaded 5 Apr 2026Source

Technical (Architect)

  • DocumentARCH Q 4 JAN TO MARCH 2024.pdf · uploaded 28 Dec 2024Source
  • DocumentARCH Q1 APRIL TO JUNE 2024.pdf · uploaded 28 Dec 2024Source
  • DocumentARCH Q2 JULY TO SEP 2024.pdf · uploaded 28 Dec 2024Source
  • Documentarch cert.pdf · uploaded 29 Jan 2025Source
  • DocumentArchitect Certificate_compressed.pdf · uploaded 17 Apr 2025Source
  • DocumentArchitect Certificate july-spet 26.pdf · uploaded 12 Oct 2026Source

Technical (Engineer)

  • DocumentFORM 2 Q 4 JAN TO MARCH.pdf · uploaded 28 Dec 2024Source
  • DocumentFORM 2 Q1 APRIL TO JUNE 2024.pdf · uploaded 28 Dec 2024Source
  • DocumentFORM 2 Q2 JULY TO SEP 2024.pdf · uploaded 28 Dec 2024Source
  • Documenteng cert.pdf · uploaded 29 Jan 2025Source
  • DocumentEngineer certificate.pdf · uploaded 17 Apr 2025Source
  • DocumentEngineer Certificate.pdf · uploaded 12 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 286/1A/6, 287/1

As registered with MahaRERA and published on its project page

Project type
Mixed
Status on MahaRERA
Certificate Signed
Unit types
5BHK & more, Refuge area18 units in all
Address
S No 286/1a/5, 286/1a/6, 287/1, Pallod Farms, BanerPIN 411045
Village
Pune (M Corp.), Pune City taluka
Land area for this project
3,350 sq m (36,059 sq ft)
Permissible built-up area
11,406 sq m (1,22,775 sq ft)
Sanctioned built-up area
11,404 sq m (1,22,754 sq ft)
Recreational open space
249 sq m (2,676 sq ft)
Designated bank account
85
Developed in phases
No

Survey, CTS, gat or plot numbers

286/1A/6287/1S NO 286/1A/5

Land as published on MahaRERA's project page

S NO 286/1A/5, 286/1A/6, 287/1

Boundaries

North
Canal Nallaand Part Of Survey No 286
South
Remaining Portion Of Survey No 287
East
Part Of Survey No 286
West
Canal And Nalla

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking18 units

3 of 18 units booked (17%), as the promoter reported to MahaRERA

5BHK & more · 16 unitsRefuge area · 2 units
TypeCarpet areaUnitsBooked
5BHK & more94.46 sq m · 1,017 sq ft11
5BHK & more426.97 sq m · 4,596 sq ft11
5BHK & more495.73 sq m · 5,336 sq ft20
5BHK & more526.12 sq m · 5,663 sq ft121
Refuge area25.85 sq m · 278 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSameer Valimbe—
Chartered accountantSheetal Sathe—
Chartered accountantSuhas Suresh Sathe—
EngineerVishal Kate—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Baner

All 3,195 projects in Baner · Compare Yoovie Homes with another project

Yoovie Homes in numbers

Registered deals, summarised

Deedo has 4 registered documents at Yoovie Homes, from Sep 2024 to Sep 2025: 4 sales. The median registered sale since Sep 2024 works out to about ₹17,900 per sq ft, at a median of ₹7.6 Cr a deal; 0% of sales were resales.

What is the price per sq ft at Yoovie Homes?
The median registered sale since Sep 2024 works out to about ₹17,900 per sq ft, at a median of ₹7.6 Cr a deal; 0% of sales were resales.
How many properties have been sold at Yoovie Homes?
4 sales are registered at Yoovie Homes.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Yoovie Homes by Deedo, last updated with deals registered in Sep 2025.

Latest deal · Primary sale · Sep 2025

₹5 Cr +

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology