Deedo IDDP-PUN-SN3CMahaRERA shows it completed; no MahaRERA orders on record; 0% of its units are booked.
Baner, Pune 411045 · Property rates in Baner · by Shivpriya Realtors Llp
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 9 Aug 2017, completion promised 30 Dec 2021.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Rental · 60 mo · May 2022
- Rental · Nov 2020
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| May 2022 | V18 · 306 | Rental | — | View Rental, May 2022 | |
| Nov 2020 | V18 · 205 | Rental | — | View Rental, Nov 2020 |
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100004640
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100004640 | 9 Aug 2017 | 30 Dec 2021 | 30 Dec 2021 | Shivpriya Realtors LLP | Project page |
Documents172
1 document held by Deedo, 171 filings listed on MahaRERA's project page
Finance
- PAN CardShivpriya PAN.pdf · uploaded 26 Jul 2017Source
Legal
- Legal Title report2016 (2).pdf · uploaded 26 Jul 2017Source
- Declaration Form BFORM B PDF.pdf · uploaded 26 Jul 2017Source
- OtherPlinth.pdf · uploaded 24 Feb 2018Source
- OtherSPECIFICATIONS AND AMENITIES.pdf · uploaded 20 Mar 2018Source
- OtherPlinth.pdf · uploaded 31 Mar 2018Source
- OtherN A Order.pdf · uploaded 31 Mar 2018Source
Show all 172 documentsShow fewer documents
Migrated
- 1 PAN CardShivpriya PAN.pdf · uploaded 26 Jul 2017Source
- 1 Copy of the legal title report2016 (2).pdf · uploaded 26 Jul 2017Source
- 1 Details of encumbrances2016 (1).pdf · uploaded 26 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 26 Jul 2017Source
- 1 Building Plan Approval (IOD)1A.pdf · uploaded 26 Jul 2017Source
- 2 Building Plan Approval (IOD)1B.pdf · uploaded 26 Jul 2017Source
- 3 Building Plan Approval (IOD)1C.pdf · uploaded 26 Jul 2017Source
- 4 Building Plan Approval (IOD)1D.pdf · uploaded 26 Jul 2017Source
- 5 Building Plan Approval (IOD)1E.pdf · uploaded 26 Jul 2017Source
- 6 Building Plan Approval (IOD)1F.pdf · uploaded 26 Jul 2017Source
- 7 Building Plan Approval (IOD)2A.pdf · uploaded 26 Jul 2017Source
- 8 Building Plan Approval (IOD)2B.pdf · uploaded 26 Jul 2017Source
- 9 Building Plan Approval (IOD)2C.pdf · uploaded 26 Jul 2017Source
- 10 Building Plan Approval (IOD)2D.pdf · uploaded 26 Jul 2017Source
- 11 Building Plan Approval (IOD)3A.pdf · uploaded 26 Jul 2017Source
- 12 Building Plan Approval (IOD)3B.pdf · uploaded 26 Jul 2017Source
- 13 Building Plan Approval (IOD)3B.pdf · uploaded 26 Jul 2017Source
- 14 Building Plan Approval (IOD)3D.pdf · uploaded 26 Jul 2017Source
- 15 Building Plan Approval (IOD)4A.pdf · uploaded 26 Jul 2017Source
- 16 Building Plan Approval (IOD)4B.pdf · uploaded 26 Jul 2017Source
- 17 Building Plan Approval (IOD)4C.pdf · uploaded 26 Jul 2017Source
- 18 Building Plan Approval (IOD)4D.pdf · uploaded 26 Jul 2017Source
- 19 Building Plan Approval (IOD)5A.pdf · uploaded 26 Jul 2017Source
- 20 Building Plan Approval (IOD)5B.pdf · uploaded 26 Jul 2017Source
- 21 Building Plan Approval (IOD)5C.pdf · uploaded 26 Jul 2017Source
- 22 Building Plan Approval (IOD)5D.pdf · uploaded 26 Jul 2017Source
- 1 Declaration in FORM BFORM B PDF.pdf · uploaded 26 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEERS CERTIFCATE V18.pdf · uploaded 26 Jul 2017Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)certifficate.pdf · uploaded 26 Jul 2017Source
- 1 Certificates of CA (Form 3)CA CERTIFCATE.pdf · uploaded 26 Jul 2017Source
- 1 Proforma of Allotment letterBOOKING DRAFT.pdf · uploaded 26 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE.pdf · uploaded 27 Jul 2017Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)B E CIVIL CERTIFICATE.pdf · uploaded 27 Jul 2017Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE 1.pdf · uploaded 17 Feb 2018Source
- 23 Building Plan Approval (IOD)1A.pdf · uploaded 24 Feb 2018Source
- 24 Building Plan Approval (IOD)1B.pdf · uploaded 24 Feb 2018Source
- 25 Building Plan Approval (IOD)1C.pdf · uploaded 24 Feb 2018Source
- 26 Building Plan Approval (IOD)1D.pdf · uploaded 24 Feb 2018Source
- 27 Building Plan Approval (IOD)1E.pdf · uploaded 24 Feb 2018Source
- 28 Building Plan Approval (IOD)1F.pdf · uploaded 24 Feb 2018Source
- 29 Building Plan Approval (IOD)2A.pdf · uploaded 24 Feb 2018Source
- 30 Building Plan Approval (IOD)2B.pdf · uploaded 24 Feb 2018Source
- 31 Building Plan Approval (IOD)2C.pdf · uploaded 24 Feb 2018Source
- 32 Building Plan Approval (IOD)2D.pdf · uploaded 24 Feb 2018Source
- 33 Building Plan Approval (IOD)2E.pdf · uploaded 24 Feb 2018Source
- 34 Building Plan Approval (IOD)2F.pdf · uploaded 24 Feb 2018Source
- 35 Building Plan Approval (IOD)2G.pdf · uploaded 24 Feb 2018Source
- 36 Building Plan Approval (IOD)2H.pdf · uploaded 24 Feb 2018Source
- 37 Building Plan Approval (IOD)3A.pdf · uploaded 24 Feb 2018Source
- 38 Building Plan Approval (IOD)3B.pdf · uploaded 24 Feb 2018Source
- 39 Building Plan Approval (IOD)3C.pdf · uploaded 24 Feb 2018Source
- 40 Building Plan Approval (IOD)3D.pdf · uploaded 24 Feb 2018Source
- 41 Building Plan Approval (IOD)3E.pdf · uploaded 24 Feb 2018Source
- 42 Building Plan Approval (IOD)3F.pdf · uploaded 24 Feb 2018Source
- 43 Building Plan Approval (IOD)3G.pdf · uploaded 24 Feb 2018Source
- 44 Building Plan Approval (IOD)3H.pdf · uploaded 24 Feb 2018Source
- 45 Building Plan Approval (IOD)4A.pdf · uploaded 24 Feb 2018Source
- 46 Building Plan Approval (IOD)4B.pdf · uploaded 24 Feb 2018Source
- 47 Building Plan Approval (IOD)4C.pdf · uploaded 24 Feb 2018Source
- 48 Building Plan Approval (IOD)4D.pdf · uploaded 24 Feb 2018Source
- 49 Building Plan Approval (IOD)4E.pdf · uploaded 24 Feb 2018Source
- 50 Building Plan Approval (IOD)4F.pdf · uploaded 24 Feb 2018Source
- 51 Building Plan Approval (IOD)5A.pdf · uploaded 24 Feb 2018Source
- 52 Building Plan Approval (IOD)5B.pdf · uploaded 24 Feb 2018Source
- 53 Building Plan Approval (IOD)5C.pdf · uploaded 24 Feb 2018Source
- 54 Building Plan Approval (IOD)5D.pdf · uploaded 24 Feb 2018Source
- 55 Building Plan Approval (IOD)5E.pdf · uploaded 24 Feb 2018Source
- 56 Building Plan Approval (IOD)5F.pdf · uploaded 24 Feb 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentCC NEW.pdf · uploaded 24 Feb 2018Source
- 1 OtherPlinth.pdf · uploaded 24 Feb 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT 1.pdf · uploaded 20 Mar 2018Source
- 2 OtherSPECIFICATIONS AND AMENITIES.pdf · uploaded 20 Mar 2018Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE 1.pdf · uploaded 30 Mar 2018Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 30 Mar 2018Source
- 2 Certificates of CA (Form 3)CERTIFICATE.pdf · uploaded 30 Mar 2018Source
- 3 OtherPlinth.pdf · uploaded 31 Mar 2018Source
- 4 OtherN A Order.pdf · uploaded 31 Mar 2018Source
- 57 Building Plan Approval (IOD)PLAN.pdf · uploaded 20 Apr 2018Source
- 3 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT-.pdf · uploaded 20 Apr 2018Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE3.pdf · uploaded 28 May 2018Source
- 3 Certificates of CA (Form 3)CA.pdf · uploaded 28 May 2018Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE 2.pdf · uploaded 7 Jun 2018Source
- 1 Certificates of CA (Form 5)FORM 5.pdf · uploaded 28 Dec 2018Source
- 1 Form 2AFORM 2A.pdf · uploaded 29 Dec 2018Source
- 58 Building Plan Approval (IOD)1 (2).pdf · uploaded 26 Feb 2020Source
- 59 Building Plan Approval (IOD)2.pdf · uploaded 26 Feb 2020Source
- 60 Building Plan Approval (IOD)3.pdf · uploaded 26 Feb 2020Source
- 4 Commencement Certificates / NA Order for plotted developmentcc.pdf · uploaded 26 Feb 2020Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion.pdf · uploaded 26 Feb 2020Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentIMG-20201105-WA0024-converted.pdf · uploaded 6 Nov 2020Source
- 2 Proforma of Allotment letterAGREEMENT DRAFT REVISED.pdf · uploaded 11 Dec 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)20182019.pdf · uploaded 16 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)20192020.pdf · uploaded 16 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)20202021.pdf · uploaded 16 Aug 2021Source
- 2 Certificates of CA (Form 5)SRLLP 18-19.pdf · uploaded 11 Jan 2022Source
- 3 Certificates of CA (Form 5)SRLLP019-20.pdf · uploaded 11 Jan 2022Source
- 1 Architect’s Certificate on Completion of Project (Form 4)SRLLP.pdf · uploaded 19 Jan 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)File.PDF · uploaded 26 Apr 2023Source
- 1 Status of ConveyanceFile.PDF · uploaded 26 Apr 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion 3.pdf · uploaded 6 Nov 2024Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion 3.pdf · uploaded 6 Nov 2024Source
Technical
- Document1A.pdf · uploaded 26 Jul 2017Source
- Document1B.pdf · uploaded 26 Jul 2017Source
- Document1C.pdf · uploaded 26 Jul 2017Source
- Document1D.pdf · uploaded 26 Jul 2017Source
- Document1E.pdf · uploaded 26 Jul 2017Source
- Document1F.pdf · uploaded 26 Jul 2017Source
- Document2A.pdf · uploaded 26 Jul 2017Source
- Document2B.pdf · uploaded 26 Jul 2017Source
- Document2C.pdf · uploaded 26 Jul 2017Source
- Document2D.pdf · uploaded 26 Jul 2017Source
- Document3A.pdf · uploaded 26 Jul 2017Source
- Document3B.pdf · uploaded 26 Jul 2017Source
- Document3B.pdf · uploaded 26 Jul 2017Source
- Document3D.pdf · uploaded 26 Jul 2017Source
- Document4A.pdf · uploaded 26 Jul 2017Source
- Document4B.pdf · uploaded 26 Jul 2017Source
- Document4C.pdf · uploaded 26 Jul 2017Source
- Document5D.pdf · uploaded 26 Jul 2017Source
- Document5C.pdf · uploaded 26 Jul 2017Source
- Document5B.pdf · uploaded 26 Jul 2017Source
- Document4D.pdf · uploaded 26 Jul 2017Source
- Document5A.pdf · uploaded 26 Jul 2017Source
- DocumentLAYOUT.pdf · uploaded 26 Jul 2017Source
- Document1A.pdf · uploaded 24 Feb 2018Source
- Document1B.pdf · uploaded 24 Feb 2018Source
- Document1C.pdf · uploaded 24 Feb 2018Source
- Document1D.pdf · uploaded 24 Feb 2018Source
- Document1E.pdf · uploaded 24 Feb 2018Source
- Document1F.pdf · uploaded 24 Feb 2018Source
- Document2A.pdf · uploaded 24 Feb 2018Source
- Document2B.pdf · uploaded 24 Feb 2018Source
- Document2C.pdf · uploaded 24 Feb 2018Source
- Document2D.pdf · uploaded 24 Feb 2018Source
- Document2E.pdf · uploaded 24 Feb 2018Source
- Document2F.pdf · uploaded 24 Feb 2018Source
- Document2G.pdf · uploaded 24 Feb 2018Source
- Document2H.pdf · uploaded 24 Feb 2018Source
- Document3A.pdf · uploaded 24 Feb 2018Source
- Document3B.pdf · uploaded 24 Feb 2018Source
- Document3C.pdf · uploaded 24 Feb 2018Source
- Document3D.pdf · uploaded 24 Feb 2018Source
- Document3E.pdf · uploaded 24 Feb 2018Source
- Document3F.pdf · uploaded 24 Feb 2018Source
- Document3G.pdf · uploaded 24 Feb 2018Source
- Document3H.pdf · uploaded 24 Feb 2018Source
- Document4A.pdf · uploaded 24 Feb 2018Source
- Document4B.pdf · uploaded 24 Feb 2018Source
- Document4C.pdf · uploaded 24 Feb 2018Source
- Document4D.pdf · uploaded 24 Feb 2018Source
- Document4E.pdf · uploaded 24 Feb 2018Source
- Document4F.pdf · uploaded 24 Feb 2018Source
- Document5A.pdf · uploaded 24 Feb 2018Source
- Document5B.pdf · uploaded 24 Feb 2018Source
- Document5C.pdf · uploaded 24 Feb 2018Source
- Document5D.pdf · uploaded 24 Feb 2018Source
- Document5E.pdf · uploaded 24 Feb 2018Source
- Document5F.pdf · uploaded 24 Feb 2018Source
- DocumentPLAN.pdf · uploaded 20 Apr 2018Source
- Document1 (2).pdf · uploaded 26 Feb 2020Source
- Document2.pdf · uploaded 26 Feb 2020Source
- Document3.pdf · uploaded 26 Feb 2020Source
Technical (Architect)
- DocumentARCHITECT CERTIFICATE 2.pdf · uploaded 7 Jun 2018Source
Technical (Engineer)
- DocumentENGINEER CERTIFICATE3.pdf · uploaded 28 May 2018Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S.NO.18/2A BALEWADI PUNE
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Unit types
- 310, 405, 501, 502, 503, 504, 507, 508, 509, 510, 601, 602, 603, 604, 607, 608, 609, 610, 701 and 710, 702 and 709, 703, 704, 705, 706, 707, 708, 801 and 810, 802 and 809, 803, 804, 805, 806, 807, 808, 901 and 910, 902 and 909, 903, 904, 905, 906, 907, 908, Restaurant 1a 1b, Restaurant 2a 2b, Restaurant 3a 3b, Restaurant 4, Restaurant 553 units in all
- Address
- S.NO.18/2A BALEWADI PUNE, balewadi, balewadiPIN 411045
- Village
- Baner, Haveli taluka
- Location
- 18.55978, 73.78985
- Land area for this project
- 3,173 sq m (34,156 sq ft)
- Permissible built-up area
- 7,591 sq m (81,708 sq ft)
- Sanctioned built-up area
- 7,591 sq m (81,708 sq ft)
- Recreational open space
- 317 sq m (3,416 sq ft)
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S.NO.18/2A BALEWADI PUNE
Boundaries
- North
- Land Out Of S No 18
- South
- S No 17 Balewadi
- East
- Land Of Balwadkar
- West
- D P Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking53 units
0 of 53 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 310 | 117.34 sq m · 1,263 sq ft | 1 | 0 |
| 405 | 75.18 sq m · 809 sq ft | 1 | 0 |
| 501 | 117.34 sq m · 1,263 sq ft | 1 | 0 |
| 502 | 85.62 sq m · 922 sq ft | 1 | 0 |
| 503 | 88.67 sq m · 954 sq ft | 1 | 0 |
| 504 | 58.96 sq m · 635 sq ft | 1 | 0 |
| 507 | 60.03 sq m · 646 sq ft | 1 | 0 |
| 508 | 85.31 sq m · 918 sq ft | 1 | 0 |
Show all 47 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 509 | 85.62 sq m · 922 sq ft | 1 | 0 |
| 510 | 117.34 sq m · 1,263 sq ft | 1 | 0 |
| 601 | 117.34 sq m · 1,263 sq ft | 1 | 0 |
| 602 | 85.62 sq m · 922 sq ft | 1 | 0 |
| 603 | 88.67 sq m · 954 sq ft | 1 | 0 |
| 604 | 58.96 sq m · 635 sq ft | 1 | 0 |
| 607 | 60.03 sq m · 646 sq ft | 1 | 0 |
| 608 | 85.31 sq m · 918 sq ft | 1 | 0 |
| 609 | 85.62 sq m · 922 sq ft | 1 | 0 |
| 610 | 117.34 sq m · 1,263 sq ft | 1 | 0 |
| 701 and 710 | 117.34 sq m · 1,263 sq ft | 2 | 0 |
| 702 and 709 | 85.62 sq m · 922 sq ft | 2 | 0 |
| 703 | 88.67 sq m · 954 sq ft | 1 | 0 |
| 704 | 112.83 sq m · 1,214 sq ft | 1 | 0 |
| 705 | 75.18 sq m · 809 sq ft | 1 | 0 |
| 706 | 85.59 sq m · 921 sq ft | 1 | 0 |
| 707 | 60.03 sq m · 646 sq ft | 1 | 0 |
| 708 | 85.31 sq m · 918 sq ft | 1 | 0 |
| 801 and 810 | 117.34 sq m · 1,263 sq ft | 2 | 0 |
| 802 and 809 | 85.62 sq m · 922 sq ft | 2 | 0 |
| 803 | 88.67 sq m · 954 sq ft | 1 | 0 |
| 804 | 112.83 sq m · 1,214 sq ft | 1 | 0 |
| 805 | 75.18 sq m · 809 sq ft | 1 | 0 |
| 806 | 85.59 sq m · 921 sq ft | 1 | 0 |
| 807 | 60.03 sq m · 646 sq ft | 1 | 0 |
| 808 | 85.31 sq m · 918 sq ft | 1 | 0 |
| 901 and 910 | 117.34 sq m · 1,263 sq ft | 2 | 0 |
| 902 and 909 | 85.62 sq m · 922 sq ft | 2 | 0 |
| 903 | 88.67 sq m · 954 sq ft | 1 | 0 |
| 904 | 112.83 sq m · 1,214 sq ft | 1 | 0 |
| 905 | 75.18 sq m · 809 sq ft | 1 | 0 |
| 906 | 85.59 sq m · 921 sq ft | 1 | 0 |
| 907 | 60.03 sq m · 646 sq ft | 1 | 0 |
| 908 | 85.31 sq m · 918 sq ft | 1 | 0 |
| Restaurant 1a 1b | 318 sq m · 3,423 sq ft | 1 | 0 |
| Restaurant 2a 2b | 242 sq m · 2,605 sq ft | 1 | 0 |
| Restaurant 3a 3b | 440 sq m · 4,736 sq ft | 1 | 0 |
| Restaurant 4 | 202.63 sq m · 2,181 sq ft | 1 | 0 |
| Restaurant 5 | 351.02 sq m · 3,778 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals14
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Sunil Hingmire | — |
| Chartered accountant | V P Kale | — |
| Engineer | Mr. G. A. Bhilare. | — |
| Other | Gupta Electricals | — |
| Other | Jaisons Quality Systems | — |
| Other | Millenium Engineers Contractors Pvt Ltd | — |
| Registered real estate agent | Excellence Propvalue LLP | — |
| Registered real estate agent | Gaurav Suresh Nahta | — |
Show all 14 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | ICICI Home Finance Company Limited | — |
| Registered real estate agent | Mahendra Ashok Amrutkar | — |
| Registered real estate agent | Pearl Realtors | — |
| Registered real estate agent | Pramod Pandurang Potpelwar | — |
| Registered real estate agent | Tapas Satyanarayan Chatterjee | — |
| Registered real estate agent | Umesh Ramesh Pawar | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Baner
- Sai Residency Cooperative Housing Society LimitedRERA PR1260002602726
- Merlin VertexRERA PC1261012602688
- Bliss NestRERA PR1260002602296
- GaurinandanRERA PR1260002602194
- One Space₹9,840 a sq ft
- Anantashree₹8,070 a sq ft
- Fernnvale₹10,120 a sq ft
- Avika ResidencesRERA PR1260002601571
All 3,195 projects in Baner · Compare V18 with another project
V18 in numbers
Registered deals, summarised
Deedo has 2 registered documents at V18, from Nov 2020 to May 2022: 2 leave and licence agreements.
- Are properties at V18 rented out?
- Yes: 2 leave and licence agreements are registered at V18.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at V18 by Deedo, last updated with deals registered in May 2022.
Latest deal · Rental · May 2022
₹50k–1 L / month