Nirvana
Deedo IDDP-PUN-76TMCompletion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 67% of its units are booked.
Baner, Pune 411045 · Property rates in Baner · by Nirman Skylines LLP
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 7 Nov 2022, completion promised 31 Dec 2026, revised to 30 Apr 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Oct 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Rental · Aug 2026
- Cancellation · Aug 2026
- Primary sale · Jul 2026
- Mortgage · Jul 2026No amount
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Nirvana Wing A · 2302 | Primary sale | 2,274 sq ft | View Primary sale, Oct 2026 | |
| Sep 2026 | Nirvana Wing A · 501 | Primary sale | 2,813 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Nirvana Wing A · 1202 | Primary sale | 2,274 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Nirvana Wing A · 1201 | Primary sale | 2,813 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | Nirvana Wing A · 2901 | Primary sale | 2,870 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Nirvana Wing B · 102 | Primary sale | 1,316 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Main building · 2 | Rental | — | View Rental, Aug 2026 | |
| Aug 2026 | B | Cancellation | 1,316 sq ft | View Cancellation, Aug 2026 | |
| Jul 2026 | Nirvana Wing C · 301 | Primary sale | 1,316 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Main building · 202 | Mortgage | — | View Mortgage, Jul 2026 |
4 buildings
Open a building to see every flat, floor by floor.
- MHADA7 floors · 21 units0% booked
- Nirvana Wing A31 floors · 61 units62% booked
- Nirvana Wing B14 floors · 28 units100% booked
- Nirvana Wing C14 floors · 28 units93% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100047528
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100047528 | 7 Nov 2022 | 31 Dec 2026 | 30 Apr 2027 | Nirman Skylines LLP | Project page |
Documents175
2 documents held by Deedo, 173 filings listed on MahaRERA's project page
Finance
- PAN CardFIRM PAN.pdf · uploaded 29 Sep 2022Source
Legal
- Legal Title reportLEGAL TITLE REPORT.pdf · uploaded 29 Sep 2022Source
- Declaration Form BFORM B PROMOTER.pdf · uploaded 29 Sep 2022Source
- Other – LegalFlat Agreement Nirman Skylines for RERA 24-9.pdf · uploaded 14 Oct 2022Source
- Declaration Form BAffidavit cum declaration.pdf · uploaded 4 Nov 2024Source
- OthersAGREEMENT FOR SALE - Nirvana Building A - NEW Payment.pdf · uploaded 3 Dec 2025Source
Show all 175 documentsShow fewer documents
Legal
- OthersAGREEMENT FOR SALE - Nirvana Building B and C - New Payment.pdf · uploaded 3 Dec 2025Source
Migrated
- 1 PAN CardFIRM PAN.pdf · uploaded 29 Sep 2022Source
- 1 Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 29 Sep 2022Source
- 1 a Details of encumbrances concerned to FinanceFINANCE ENCUMBRANCE.pdf · uploaded 29 Sep 2022Source
- 1 b Details of encumbrances concerned to LegalLEGAL ENCUMBRANCE.pdf · uploaded 29 Sep 2022Source
- 1 Copy of Layout Approval (in case of layout)01-11.pdf · uploaded 29 Sep 2022Source
- 1 Building Plan Approval / NA Order for plotted development02-11.pdf · uploaded 29 Sep 2022Source
- 2 Building Plan Approval / NA Order for plotted development03-11.pdf · uploaded 29 Sep 2022Source
- 3 Building Plan Approval / NA Order for plotted development04-11.pdf · uploaded 29 Sep 2022Source
- 4 Building Plan Approval / NA Order for plotted development05-11.pdf · uploaded 29 Sep 2022Source
- 5 Building Plan Approval / NA Order for plotted development06-11.pdf · uploaded 29 Sep 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 29 Sep 2022Source
- 1 Declaration about Commencement CertificateCIRCULAR 32.pdf · uploaded 29 Sep 2022Source
- 1 Declaration in FORM BFORM B PROMOTER.pdf · uploaded 29 Sep 2022Source
- 1 Proforma of Agreement for saleALLOTMENT LETTER.pdf · uploaded 29 Sep 2022Source
- 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 29 Sep 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK DECLARATION.pdf · uploaded 29 Sep 2022Source
- 1 Deviation Report with respect to Allotment letterNO DEVIATION AL.pdf · uploaded 29 Sep 2022Source
- 1 Deviation Report with respect to model copy of AgreementNO DEVIATION AFS.pdf · uploaded 29 Sep 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200249205373_For_Asset_Based_Search_10_10_2022_15_56_13_490.pdf · uploaded 10 Oct 2022Source
- 1 Other – LegalFlat Agreement Nirman Skylines for RERA 24-9.pdf · uploaded 14 Oct 2022Source
- 6 Building Plan Approval / NA Order for plotted development07-11.pdf · uploaded 17 Oct 2022Source
- 7 Building Plan Approval / NA Order for plotted development08-11.pdf · uploaded 17 Oct 2022Source
- 8 Building Plan Approval / NA Order for plotted development09-11.pdf · uploaded 17 Oct 2022Source
- 9 Building Plan Approval / NA Order for plotted development10-11.pdf · uploaded 17 Oct 2022Source
- 10 Building Plan Approval / NA Order for plotted development11-11.pdf · uploaded 17 Oct 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Nirman Skylines LLP Form 3- dated.pdf · uploaded 28 Oct 2022Source
- 2 Copy of Layout Approval (in case of layout)1-1.pdf · uploaded 10 Apr 2023Source
- 11 Building Plan Approval / NA Order for plotted development1-11.pdf · uploaded 10 Apr 2023Source
- 12 Building Plan Approval / NA Order for plotted development2-11.pdf · uploaded 10 Apr 2023Source
- 13 Building Plan Approval / NA Order for plotted development3-11.pdf · uploaded 10 Apr 2023Source
- 14 Building Plan Approval / NA Order for plotted development4-11.pdf · uploaded 10 Apr 2023Source
- 15 Building Plan Approval / NA Order for plotted development5-11.pdf · uploaded 10 Apr 2023Source
- 16 Building Plan Approval / NA Order for plotted development6-11.pdf · uploaded 10 Apr 2023Source
- 17 Building Plan Approval / NA Order for plotted development7-11.pdf · uploaded 10 Apr 2023Source
- 18 Building Plan Approval / NA Order for plotted development8-11.pdf · uploaded 10 Apr 2023Source
- 19 Building Plan Approval / NA Order for plotted development9-11.pdf · uploaded 10 Apr 2023Source
- 20 Building Plan Approval / NA Order for plotted development10-11.pdf · uploaded 10 Apr 2023Source
- 21 Building Plan Approval / NA Order for plotted development11-11.pdf · uploaded 10 Apr 2023Source
- 2 Commencement Certificates / NA Order for plotted development230331 - CC (BP).pdf · uploaded 10 Apr 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nirman Greens Nirvana Form 2 (1) (1).pdf · uploaded 29 Jun 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5 -nirman skylines.pdf · uploaded 27 Nov 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirman Skyline form 1 dec 23.pdf · uploaded 21 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 dec 23 nirman skyline.pdf · uploaded 21 Feb 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 dec 23 nirman skylines - converted.pdf · uploaded 21 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)31 03 23 Nirman Skylines LLP Form 2A.pdf · uploaded 27 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvana Form 1 Mar 24 converted.pdf · uploaded 25 Apr 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nirvana Form 2 Mar 24.pdf · uploaded 25 Apr 2024Source
- 1 Disclosure of sold/ booked inventoryNirvana Disclosure of Sold Booked Inventory.pdf · uploaded 25 Apr 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Nirvana Form 3 Mar24 converted.pdf · uploaded 25 Apr 2024Source
- 1 Declaration in FORM BAffidavit cum declaration.pdf · uploaded 4 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvana - Form 1 jun 24.pdf · uploaded 4 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvana Form 1 sep 24.pdf · uploaded 4 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Nirvana- Form 3 jun 24.pdf · uploaded 4 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Nirvana Form 3 sep 24.pdf · uploaded 4 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nirvana Form 2 sep 24.pdf · uploaded 4 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nirvana - Form 2 jun 24.pdf · uploaded 4 Nov 2024Source
- 2 Disclosure of sold/ booked inventoryNirvana - Disclosure of sold Unsold Inventory jun 24.pdf · uploaded 4 Nov 2024Source
- 3 Disclosure of sold/ booked inventoryNirvana Disclosure of Sold.pdf · uploaded 4 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Nirvana Form 2A.pdf · uploaded 8 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5 signed.pdf · uploaded 9 Dec 2024Source
- 1 Proforma of Agreement for saleAGREEMENT FOR SALE - Nirvana Building A.pdf · uploaded 13 Dec 2024Source
- 2 Proforma of Agreement for saleAGREEMENT FOR SALE - Nirvana Building B and C.pdf · uploaded 13 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - NIRVANA.pdf · uploaded 24 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - NIRVANA.pdf · uploaded 24 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 - nirvana.pdf · uploaded 24 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold - Nirvava.pdf · uploaded 24 Jan 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectsigned Nirman Skyline LLP Disclosure for Secured or unsecured finance availed for the project.pdf · uploaded 14 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Nirvana Signed.pdf · uploaded 26 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold-Booked Inventory Mar_25.pdf · uploaded 26 Apr 2025Source
- 1 Copy of Layout Approval (in case of layout)1-12_11zon (1).pdf · uploaded 5 May 2025Source
- 1 Building Plan Approval / NA Order for plotted development2-3.pdf · uploaded 5 May 2025Source
- 2 Building Plan Approval / NA Order for plotted development4-6.pdf · uploaded 5 May 2025Source
- 3 Building Plan Approval / NA Order for plotted development7-9.pdf · uploaded 5 May 2025Source
- 4 Building Plan Approval / NA Order for plotted development10-12.pdf · uploaded 5 May 2025Source
- 1 Declaration about Commencement Certificate250220 - CC.pdf · uploaded 5 May 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 -.pdf · uploaded 20 Jul 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 -Signed_.pdf · uploaded 20 Jul 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2.pdf · uploaded 20 Jul 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure - Nirvana.pdf · uploaded 20 Jul 2025Source
- Form 5 (FY 2024-2025)Form 5 Nirvana.pdf · uploaded 1 Oct 2025Source
- Form 1Nirvana - Form 1 jun 24.pdf · uploaded 17 Oct 2025Source
- Form 1Nirvana Form 1 sep 24.pdf · uploaded 17 Oct 2025Source
- Form 1FORM 1 - NIRVANA.pdf · uploaded 17 Oct 2025Source
- Form 1FORM 1 - NIRVANA.pdf · uploaded 17 Oct 2025Source
- Form 2Nirvana - Form 2 jun 24.pdf · uploaded 17 Oct 2025Source
- Form 2Nirvana Form 2 sep 24.pdf · uploaded 17 Oct 2025Source
- Form 2form 2 - nirvana.pdf · uploaded 17 Oct 2025Source
- Form 2Form 2.pdf · uploaded 17 Oct 2025Source
- Form 3Nirvana- Form 3 jun 24.pdf · uploaded 17 Oct 2025Source
- Form 3Nirvana Form 3 sep 24.pdf · uploaded 17 Oct 2025Source
- Form 3FORM 3 - NIRVANA.pdf · uploaded 17 Oct 2025Source
- Form 3Form 3 - Nirvana Signed.pdf · uploaded 17 Oct 2025Source
- Disclosure of Sold and Booked InventoryNirvana - Disclosure of sold Unsold Inventory jun 24.pdf · uploaded 17 Oct 2025Source
- Disclosure of Sold and Booked InventoryNirvana Disclosure of Sold.pdf · uploaded 17 Oct 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold - Nirvava.pdf · uploaded 17 Oct 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-Booked Inventory Mar_25.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1form 1 .pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1form 1 .pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2fORM 2 .pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2fORM 2 .pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3form 3.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3form 3.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1Nirvana Form 1.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Nirvana Form 2.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3FORM 3 nirman Skylines DEC 25 Sign_compressed.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1Form 1 Nirvana.pdf · uploaded 7 Apr 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 7 Apr 2026Source
- Withdrawal Update Form 3Form 3 nirvana signed_compressed.pdf · uploaded 7 Apr 2026Source
- Form 2A (FY 2023-2024)Nirvana Form 2A.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2024-2025)Nirvana - Form 2A-2024-2025.pdf · uploaded 20 Apr 2026Source
- Form 5 (FY 2022-2023)form 5 -nirman skylines.pdf · uploaded 20 Apr 2026Source
- Form 5 (FY 2023-2024)form 5 signed.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2022-2023)Nirvana Form 2A.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 1Form 1 Nirvana.pdf · uploaded 2 Jul 2026Source
- Withdrawal Update Form 2Form 2 Nirvana signed.pdf · uploaded 2 Jul 2026Source
- Withdrawal Update Form 3Form 3 - Nirvana signed compressed.pdf · uploaded 2 Jul 2026Source
- Form 5 (FY 2025-2026)Form 5 Nirvana.pdf · uploaded 7 Sep 2026Source
- Form 2A (FY 2025-2026)FORM 2A 25-26.pdf · uploaded 8 Sep 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 3 Oct 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 3 Oct 2026Source
- Withdrawal Update Form 3Form 3 Signed.pdf · uploaded 3 Oct 2026Source
Technical
- Document01-11.pdf · uploaded 29 Sep 2022Source
- Document02-11.pdf · uploaded 29 Sep 2022Source
- Document03-11.pdf · uploaded 29 Sep 2022Source
- Document04-11.pdf · uploaded 29 Sep 2022Source
- Document05-11.pdf · uploaded 29 Sep 2022Source
- Document06-11.pdf · uploaded 29 Sep 2022Source
- Document07-11.pdf · uploaded 17 Oct 2022Source
- Document08-11.pdf · uploaded 17 Oct 2022Source
- Document09-11.pdf · uploaded 17 Oct 2022Source
- Document10-11.pdf · uploaded 17 Oct 2022Source
- Document11-11.pdf · uploaded 17 Oct 2022Source
- Document1-1.pdf · uploaded 10 Apr 2023Source
- Document1-11.pdf · uploaded 10 Apr 2023Source
- Document2-11.pdf · uploaded 10 Apr 2023Source
- Document3-11.pdf · uploaded 10 Apr 2023Source
- Document4-11.pdf · uploaded 10 Apr 2023Source
- Document5-11.pdf · uploaded 10 Apr 2023Source
- Document6-11.pdf · uploaded 10 Apr 2023Source
- Document7-11.pdf · uploaded 10 Apr 2023Source
- Document8-11.pdf · uploaded 10 Apr 2023Source
- Document9-11.pdf · uploaded 10 Apr 2023Source
- Document10-11.pdf · uploaded 10 Apr 2023Source
- Document11-11.pdf · uploaded 10 Apr 2023Source
- Document1-12_11zon (1).pdf · uploaded 5 May 2025Source
- Document2-3.pdf · uploaded 5 May 2025Source
- Document4-6.pdf · uploaded 5 May 2025Source
- Document7-9.pdf · uploaded 5 May 2025Source
- Document10-12.pdf · uploaded 5 May 2025Source
- Document1 Layout.pdf · uploaded 17 Jun 2026Source
- Document2-3.pdf · uploaded 17 Jun 2026Source
- Document4-6.pdf · uploaded 17 Jun 2026Source
- Document7-9.pdf · uploaded 17 Jun 2026Source
- Document10-12.pdf · uploaded 17 Jun 2026Source
Technical (Architect)
Technical (Engineer)
- DocumentNirvana - Form 2 jun 24.pdf · uploaded 4 Nov 2024Source
- DocumentNirvana Form 2 sep 24.pdf · uploaded 4 Nov 2024Source
- Documentform 2 - nirvana.pdf · uploaded 24 Jan 2025Source
- DocumentForm 2.pdf · uploaded 26 Apr 2025Source
- DocumentForm-2.pdf · uploaded 20 Jul 2025Source
- DocumentForm 2.pdf · uploaded 3 Oct 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel CITY SURVEY NO 224/1 AT BANER
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —138 units in all
- Address
- City Survey No 224/1 At Baner, Baner, BanerPIN 411045
- Village
- Baner, Haveli taluka
- Land area for this project
- 6,120 sq m (65,875 sq ft)
- Permissible built-up area
- 31,046 sq m (3,34,176 sq ft)
- Sanctioned built-up area
- 31,046 sq m (3,34,176 sq ft)
- Recreational open space
- 619 sq m (6,659 sq ft)
- Designated bank account
- 109
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
CITY SURVEY NO 224/1 AT BANER
Boundaries
- North
- S No 223 Of Village Baner
- South
- By 12 Mtrs Dp Road Out S No 224
- East
- Part Of S 224 2 Of Village Baner
- West
- By 30 Mtr Dp Road Out S No 224
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking138 units
138 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| MHADA | — | — | 21 |
| Nirvana Wing A | — | — | 61 |
| Nirvana Wing B | — | — | 28 |
| Nirvana Wing C | — | — | 28 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Hrishikesh Vishwas Kulkarni | — |
| Architect | V K Architecture | — |
| Chartered accountant | Dolly Gandhi | — |
| Chartered accountant | Navdeep Jindal & Associates | — |
| Chartered accountant | Prachi Agarwal | — |
| Engineer | Planedge Consultants P Ltd | — |
| Engineer | Sunil Shridhar Kalore | — |
Source: MahaRERA project page. Contact details are not shown.
Nirvana in numbers
Registered deals, summarised
Deedo has 53 registered documents at Nirvana, from Nov 2019 to Oct 2026: 26 sales, 8 leave and licence agreements, 17 mortgages. The median registered sale since Nov 2019 works out to about ₹16,600 per sq ft, at a median of ₹2.45 Cr a deal; 0% of sales were resales.
- What is the price per sq ft at Nirvana?
- The median registered sale since Nov 2019 works out to about ₹16,600 per sq ft, at a median of ₹2.45 Cr a deal; 0% of sales were resales.
- How many properties have been sold at Nirvana?
- 26 sales are registered at Nirvana.
- Are properties at Nirvana rented out?
- Yes: 8 leave and licence agreements are registered at Nirvana, at a median rent since Nov 2019 of about ₹44,000 a month with a deposit of about ₹8,45,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Nirvana by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Primary sale · Oct 2026
₹3.5–5 Cr