Merlin Ventana
Deedo IDDP-PUN-X331It is due for completion in Dec 2028, with no extension on record; no MahaRERA orders on record.
Baner, Pune 411045 · Property rates in Baner · by Merlin Bhingarwala Developers Llp
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2028, with no extension on record
- This projectRegistered 22 Nov 2023, completion promised 31 Dec 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Primary sale · Jul 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · May 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Sep 2026 | A · 1502 | Primary sale | 1,089 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | A · 2002 | Primary sale | 1,089 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Tower C · 2104 | Primary sale | 1,378 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | A · 1102 | Primary sale | 1,089 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | A · 304 | Primary sale | 868 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | A · 401 | Primary sale | 1,088 sq ft | View Primary sale, Aug 2026 | |
| Jul 2026 | A · 2203 | Primary sale | 1,073 sq ft | View Primary sale, Jul 2026 | |
| Jun 2026 | Tower B · 2302 | Primary sale | 993 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | A · 402 | Primary sale | 1,089 sq ft | View Primary sale, Jun 2026 | |
| May 2026 | Tower B · 2303 | Primary sale | 987 sq ft | View Primary sale, May 2026 |
3 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100053687
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100053687 | 22 Nov 2023 | 31 Dec 2028 | 31 Dec 2028 | Merlin Bhingarwala Developers LLP | Project page |
Documents280
1 document held by Deedo, 279 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card MBD.pdf · uploaded 10 Oct 2023Source
Legal
Migrated
- 1 PAN CardPan Card MBD.pdf · uploaded 10 Oct 2023Source
- 1 Copy of the legal title reportFormat A Title report.pdf · uploaded 10 Oct 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about separte bank account .pdf · uploaded 26 Oct 2023Source
- 1 CERSAI detailsCersai Report .pdf · uploaded 27 Oct 2023Source
Show all 280 documentsShow fewer documents
Migrated
- 1 a Details of encumbrances concerned to FinanceDetails of encumbrances conerned to legal.pdf · uploaded 28 Oct 2023Source
- 2 a Details of encumbrances concerned to FinanceDetails of encumbrances conerned to legal.pdf · uploaded 28 Oct 2023Source
- 1 b Details of encumbrances concerned to LegalDetails of encumbrances conerned to legal.pdf · uploaded 28 Oct 2023Source
- 2 b Details of encumbrances concerned to LegalDetails of encumbrances conerned to legal.pdf · uploaded 28 Oct 2023Source
- 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 28 Oct 2023Source
- 2 Building Plan Approval / NA Order for plotted development2 .pdf · uploaded 28 Oct 2023Source
- 3 Building Plan Approval / NA Order for plotted development3 .pdf · uploaded 28 Oct 2023Source
- 4 Building Plan Approval / NA Order for plotted development4 .pdf · uploaded 28 Oct 2023Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 28 Oct 2023Source
- 6 Building Plan Approval / NA Order for plotted development6 .pdf · uploaded 28 Oct 2023Source
- 7 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 28 Oct 2023Source
- 8 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 28 Oct 2023Source
- 9 Building Plan Approval / NA Order for plotted development9 .pdf · uploaded 28 Oct 2023Source
- 10 Building Plan Approval / NA Order for plotted development10 .pdf · uploaded 28 Oct 2023Source
- 11 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 28 Oct 2023Source
- 12 Building Plan Approval / NA Order for plotted development12 .pdf · uploaded 28 Oct 2023Source
- 13 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 28 Oct 2023Source
- 14 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 28 Oct 2023Source
- 15 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 28 Oct 2023Source
- 16 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 28 Oct 2023Source
- 17 Building Plan Approval / NA Order for plotted development17.pdf · uploaded 28 Oct 2023Source
- 18 Building Plan Approval / NA Order for plotted development18.pdf · uploaded 28 Oct 2023Source
- 19 Building Plan Approval / NA Order for plotted development19.pdf · uploaded 28 Oct 2023Source
- 20 Building Plan Approval / NA Order for plotted development20.pdf · uploaded 28 Oct 2023Source
- 21 Building Plan Approval / NA Order for plotted development21.pdf · uploaded 28 Oct 2023Source
- 22 Building Plan Approval / NA Order for plotted development22.pdf · uploaded 28 Oct 2023Source
- 23 Building Plan Approval / NA Order for plotted development23 .pdf · uploaded 28 Oct 2023Source
- 24 Building Plan Approval / NA Order for plotted development24.pdf · uploaded 28 Oct 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentcommencement certificate .pdf · uploaded 28 Oct 2023Source
- 1 Copy of Layout Approval (in case of layout)Plan 1 .pdf · uploaded 30 Oct 2023Source
- 1 Declaration about Commencement CertificateDeclarationabout commencment certificate.pdf · uploaded 30 Oct 2023Source
- 1 Declaration in FORM BForm B.pdf · uploaded 30 Oct 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch certificate .pdf · uploaded 30 Oct 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer cert .pdf · uploaded 30 Oct 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of MPL.pdf · uploaded 30 Oct 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Saket Mohta.pdf · uploaded 30 Oct 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Kamlesh Jhawar.pdf · uploaded 30 Oct 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Bhairav sanghvi.pdf · uploaded 30 Oct 2023Source
- 1 Proforma of Allotment letterAllotment letter.pdf · uploaded 30 Oct 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation of Allotment letter.pdf · uploaded 30 Oct 2023Source
- 1 Other – TechnicalSelf Declaration.pdf · uploaded 30 Oct 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation of AFS.pdf · uploaded 2 Nov 2023Source
- 3 a Details of encumbrances concerned to FinanceDetails of encumbrances concerned to finance.pdf · uploaded 9 Nov 2023Source
- 3 b Details of encumbrances concerned to LegalDetails of encumbrances concerned to finance.pdf · uploaded 9 Nov 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 .pdf · uploaded 9 Nov 2023Source
- 1 Proforma of Agreement for saleAFS RERA Draft_Baner_280923.pdf · uploaded 9 Nov 2023Source
- 2 Copy of Layout Approval (in case of layout)1 20_compressed.pdf · uploaded 29 Jan 2024Source
- 25 Building Plan Approval / NA Order for plotted development2 20.pdf · uploaded 29 Jan 2024Source
- 26 Building Plan Approval / NA Order for plotted development3 19_compressed.pdf · uploaded 29 Jan 2024Source
- 27 Building Plan Approval / NA Order for plotted development4 14_compressed.pdf · uploaded 29 Jan 2024Source
- 28 Building Plan Approval / NA Order for plotted development5 14_compressed.pdf · uploaded 29 Jan 2024Source
- 29 Building Plan Approval / NA Order for plotted development6 14_compressed.pdf · uploaded 29 Jan 2024Source
- 30 Building Plan Approval / NA Order for plotted development7 12_compressed.pdf · uploaded 29 Jan 2024Source
- 31 Building Plan Approval / NA Order for plotted development8 10_compressed.pdf · uploaded 29 Jan 2024Source
- 32 Building Plan Approval / NA Order for plotted development9 10_compressed.pdf · uploaded 29 Jan 2024Source
- 33 Building Plan Approval / NA Order for plotted development10 11_compressed.pdf · uploaded 29 Jan 2024Source
- 34 Building Plan Approval / NA Order for plotted development11 13_compressed.pdf · uploaded 29 Jan 2024Source
- 35 Building Plan Approval / NA Order for plotted development12 10_compressed.pdf · uploaded 29 Jan 2024Source
- 36 Building Plan Approval / NA Order for plotted development13 9_compressed.pdf · uploaded 29 Jan 2024Source
- 37 Building Plan Approval / NA Order for plotted development14 9_compressed.pdf · uploaded 29 Jan 2024Source
- 38 Building Plan Approval / NA Order for plotted development15 3_compressed.pdf · uploaded 29 Jan 2024Source
- 39 Building Plan Approval / NA Order for plotted development16 3_compressed.pdf · uploaded 29 Jan 2024Source
- 40 Building Plan Approval / NA Order for plotted development17 2_compressed.pdf · uploaded 29 Jan 2024Source
- 41 Building Plan Approval / NA Order for plotted development18 2_compressed.pdf · uploaded 29 Jan 2024Source
- 42 Building Plan Approval / NA Order for plotted development19 2_compressed.pdf · uploaded 29 Jan 2024Source
- 43 Building Plan Approval / NA Order for plotted development20 2_compressed.pdf · uploaded 29 Jan 2024Source
- 44 Building Plan Approval / NA Order for plotted development21 2_compressed.pdf · uploaded 29 Jan 2024Source
- 45 Building Plan Approval / NA Order for plotted development22 2_compressed.pdf · uploaded 29 Jan 2024Source
- 46 Building Plan Approval / NA Order for plotted development23 2_compressed.pdf · uploaded 29 Jan 2024Source
- 47 Building Plan Approval / NA Order for plotted development24 1_compressed.pdf · uploaded 29 Jan 2024Source
- 48 Building Plan Approval / NA Order for plotted development25 1_compressed.pdf · uploaded 29 Jan 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCC_11012024.pdf · uploaded 29 Jan 2024Source
- 2 Declaration about Commencement Certificatedeclaration about commencement.pdf · uploaded 29 Jan 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert.pdf · uploaded 29 Jan 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer cert.pdf · uploaded 29 Jan 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 .pdf · uploaded 29 Jan 2024Source
- 1 Disclosure of sold/ booked inventorySol-unsold inventory.pdf · uploaded 14 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert.pdf · uploaded 16 Apr 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Cert.pdf · uploaded 16 Apr 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Merlin Ventana FORM 3.pdf · uploaded 16 Apr 2024Source
- 2 Proforma of Agreement for saleRevised Rera Agreement draft.pdf · uploaded 20 May 2024Source
- 4 a Details of encumbrances concerned to FinanceMortgage Deed Index II .pdf · uploaded 16 Jul 2024Source
- 4 b Details of encumbrances concerned to LegalMortgage Deed Index II .pdf · uploaded 16 Jul 2024Source
- 5 a Details of encumbrances concerned to Finance0227_20240719164759_001.pdf · uploaded 24 Jul 2024Source
- 5 b Details of encumbrances concerned to Legal0227_20240719164759_001.pdf · uploaded 24 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 .pdf · uploaded 14 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 .pdf · uploaded 14 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg cert Ventana.pdf · uploaded 14 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5 .pdf · uploaded 14 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert.pdf · uploaded 5 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 5 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted development3 6 .pdf · uploaded 8 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted development2 6.pdf · uploaded 8 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted development1 .pdf · uploaded 8 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Cert.pdf · uploaded 11 Nov 2024Source
- 7 Building Plan Approval / NA Order for plotted development7 .pdf · uploaded 11 Nov 2024Source
- 23 Building Plan Approval / NA Order for plotted development23.pdf · uploaded 11 Nov 2024Source
- 22 Building Plan Approval / NA Order for plotted development22 .pdf · uploaded 11 Nov 2024Source
- 21 Building Plan Approval / NA Order for plotted development21 .pdf · uploaded 11 Nov 2024Source
- 20 Building Plan Approval / NA Order for plotted development20 .pdf · uploaded 11 Nov 2024Source
- 19 Building Plan Approval / NA Order for plotted development19 .pdf · uploaded 11 Nov 2024Source
- 18 Building Plan Approval / NA Order for plotted development18.pdf · uploaded 11 Nov 2024Source
- 17 Building Plan Approval / NA Order for plotted development17 .pdf · uploaded 11 Nov 2024Source
- 16 Building Plan Approval / NA Order for plotted development16 .pdf · uploaded 11 Nov 2024Source
- 15 Building Plan Approval / NA Order for plotted development15 .pdf · uploaded 11 Nov 2024Source
- 14 Building Plan Approval / NA Order for plotted development14 .pdf · uploaded 11 Nov 2024Source
- 13 Building Plan Approval / NA Order for plotted development13 3.pdf · uploaded 11 Nov 2024Source
- 12 Building Plan Approval / NA Order for plotted development12 .pdf · uploaded 11 Nov 2024Source
- 11 Building Plan Approval / NA Order for plotted development11 4.pdf · uploaded 11 Nov 2024Source
- 10 Building Plan Approval / NA Order for plotted development10 .pdf · uploaded 11 Nov 2024Source
- 9 Building Plan Approval / NA Order for plotted development9 .pdf · uploaded 11 Nov 2024Source
- 8 Building Plan Approval / NA Order for plotted development8 .pdf · uploaded 11 Nov 2024Source
- 6 Building Plan Approval / NA Order for plotted development6 .pdf · uploaded 11 Nov 2024Source
- 5 Building Plan Approval / NA Order for plotted development5 .pdf · uploaded 11 Nov 2024Source
- 4 Building Plan Approval / NA Order for plotted development4 .pdf · uploaded 11 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)1 5_.pdf · uploaded 10 Dec 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch 01072024.pdf · uploaded 10 Dec 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch cert 01102024.pdf · uploaded 10 Dec 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng cert 30092024.pdf · uploaded 10 Dec 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng cert 19072024.pdf · uploaded 10 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng cert 19072024.pdf · uploaded 10 Dec 2024Source
- 1 Declaration about Commencement CertificateDecl about commencment cert.pdf · uploaded 10 Dec 2024Source
- 1 Disclosure of sold/ booked inventorySold Unsold inventory .pdf · uploaded 11 Dec 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation of Rera Draft.pdf · uploaded 15 Jan 2025Source
- 1 Proforma of Agreement for saleRera Agreement Draft.pdf · uploaded 15 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ventana Form 1.pdf · uploaded 23 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ventana Form III.pdf · uploaded 23 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Cert.pdf · uploaded 13 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryInventory 31032024.pdf · uploaded 26 Feb 2025Source
- 2 Disclosure of sold/ booked inventoryInventory 30062024.pdf · uploaded 26 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ventana Architect Certificate.pdf · uploaded 23 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 23 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)3618_20250423155516_001.pdf · uploaded 23 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)4260_20250611145945_001.pdf · uploaded 12 Jun 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2023-24.pdf · uploaded 23 Jun 2025Source
- Withdrawal Update Form 1ARCH CERT.pdf · uploaded 3 Nov 2025Source
- Withdrawal Update Form 2ENG CERT VENTANA.pdf · uploaded 3 Nov 2025Source
- Withdrawal Update Form 3Form 3 Merlin Ventana .pdf · uploaded 3 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5_Merlin Ventana_FY 2024-2025 sign.pdf · uploaded 17 Nov 2025Source
- Withdrawal Update Form 1Form 1 Q3 .pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2Form 2 Q3.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3Form 3 Q3.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1merlin ventana form 1 300326.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 1merlin ventana form 1 300326.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 2Baner Eng Cerificate 10042026.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 2Baner Eng Cerificate 10042026.pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 3Merlin Ventana Form 3 Mar 26 .pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 3Merlin Ventana Form 3 Mar 26 .pdf · uploaded 14 May 2026Source
- Withdrawal Update Form 1Ventana - Form 1 - Arch Certificate.pdf · uploaded 28 Jul 2026Source
- Withdrawal Update Form 2Ventana - Form 2 - Engg certificate.pdf · uploaded 28 Jul 2026Source
- Withdrawal Update Form 3Merlin Ventana Form 3 Mar 26 .pdf · uploaded 28 Jul 2026Source
- Form 5 (FY 2025-2026)RERA Form 5 - Ventena- FY 25-26 (1).pdf · uploaded 30 Sep 2026Source
Technical
- Document8.pdf · uploaded 28 Oct 2023Source
- Document9 .pdf · uploaded 28 Oct 2023Source
- Document10 .pdf · uploaded 28 Oct 2023Source
- Document11.pdf · uploaded 28 Oct 2023Source
- Document12 .pdf · uploaded 28 Oct 2023Source
- Document13.pdf · uploaded 28 Oct 2023Source
- Document14.pdf · uploaded 28 Oct 2023Source
- Document15.pdf · uploaded 28 Oct 2023Source
- Document16.pdf · uploaded 28 Oct 2023Source
- Document17.pdf · uploaded 28 Oct 2023Source
- Document18.pdf · uploaded 28 Oct 2023Source
- Document19.pdf · uploaded 28 Oct 2023Source
- Document20.pdf · uploaded 28 Oct 2023Source
- Document21.pdf · uploaded 28 Oct 2023Source
- Document22.pdf · uploaded 28 Oct 2023Source
- Document23 .pdf · uploaded 28 Oct 2023Source
- Document24.pdf · uploaded 28 Oct 2023Source
- Document1.pdf · uploaded 28 Oct 2023Source
- Document2 .pdf · uploaded 28 Oct 2023Source
- Document3 .pdf · uploaded 28 Oct 2023Source
- Document4 .pdf · uploaded 28 Oct 2023Source
- Document5.pdf · uploaded 28 Oct 2023Source
- Document6 .pdf · uploaded 28 Oct 2023Source
- Document7.pdf · uploaded 28 Oct 2023Source
- DocumentPlan 1 .pdf · uploaded 30 Oct 2023Source
- Other – TechnicalSelf Declaration.pdf · uploaded 30 Oct 2023Source
- Document1 20_compressed.pdf · uploaded 29 Jan 2024Source
- Document2 20.pdf · uploaded 29 Jan 2024Source
- Document3 19_compressed.pdf · uploaded 29 Jan 2024Source
- Document4 14_compressed.pdf · uploaded 29 Jan 2024Source
- Document5 14_compressed.pdf · uploaded 29 Jan 2024Source
- Document6 14_compressed.pdf · uploaded 29 Jan 2024Source
- Document7 12_compressed.pdf · uploaded 29 Jan 2024Source
- Document8 10_compressed.pdf · uploaded 29 Jan 2024Source
- Document9 10_compressed.pdf · uploaded 29 Jan 2024Source
- Document10 11_compressed.pdf · uploaded 29 Jan 2024Source
- Document11 13_compressed.pdf · uploaded 29 Jan 2024Source
- Document12 10_compressed.pdf · uploaded 29 Jan 2024Source
- Document13 9_compressed.pdf · uploaded 29 Jan 2024Source
- Document14 9_compressed.pdf · uploaded 29 Jan 2024Source
- Document15 3_compressed.pdf · uploaded 29 Jan 2024Source
- Document16 3_compressed.pdf · uploaded 29 Jan 2024Source
- Document17 2_compressed.pdf · uploaded 29 Jan 2024Source
- Document18 2_compressed.pdf · uploaded 29 Jan 2024Source
- Document19 2_compressed.pdf · uploaded 29 Jan 2024Source
- Document20 2_compressed.pdf · uploaded 29 Jan 2024Source
- Document21 2_compressed.pdf · uploaded 29 Jan 2024Source
- Document22 2_compressed.pdf · uploaded 29 Jan 2024Source
- Document23 2_compressed.pdf · uploaded 29 Jan 2024Source
- Document24 1_compressed.pdf · uploaded 29 Jan 2024Source
- Document25 1_compressed.pdf · uploaded 29 Jan 2024Source
- Document1 .pdf · uploaded 8 Nov 2024Source
- Document2 6.pdf · uploaded 8 Nov 2024Source
- Document3 6 .pdf · uploaded 8 Nov 2024Source
- Document4 .pdf · uploaded 11 Nov 2024Source
- Document5 .pdf · uploaded 11 Nov 2024Source
- Document6 .pdf · uploaded 11 Nov 2024Source
- Document7 .pdf · uploaded 11 Nov 2024Source
- Document8 .pdf · uploaded 11 Nov 2024Source
- Document9 .pdf · uploaded 11 Nov 2024Source
- Document10 .pdf · uploaded 11 Nov 2024Source
- Document11 4.pdf · uploaded 11 Nov 2024Source
- Document12 .pdf · uploaded 11 Nov 2024Source
- Document13 3.pdf · uploaded 11 Nov 2024Source
- Document14 .pdf · uploaded 11 Nov 2024Source
- Document15 .pdf · uploaded 11 Nov 2024Source
- Document16 .pdf · uploaded 11 Nov 2024Source
- Document17 .pdf · uploaded 11 Nov 2024Source
- Document18.pdf · uploaded 11 Nov 2024Source
- Document19 .pdf · uploaded 11 Nov 2024Source
- Document20 .pdf · uploaded 11 Nov 2024Source
- Document21 .pdf · uploaded 11 Nov 2024Source
- Document22 .pdf · uploaded 11 Nov 2024Source
- Document23.pdf · uploaded 11 Nov 2024Source
- Document1 5_.pdf · uploaded 10 Dec 2024Source
- Document001.pdf · uploaded 28 Aug 2025Source
- Document002-.pdf · uploaded 28 Aug 2025Source
- Document003.pdf · uploaded 28 Aug 2025Source
- Document04.pdf · uploaded 28 Aug 2025Source
- Document05.pdf · uploaded 28 Aug 2025Source
- Document06.pdf · uploaded 28 Aug 2025Source
- Document07.pdf · uploaded 28 Aug 2025Source
- Document08.pdf · uploaded 28 Aug 2025Source
- Document09.pdf · uploaded 28 Aug 2025Source
- Document10 .pdf · uploaded 28 Aug 2025Source
- Document11 .pdf · uploaded 28 Aug 2025Source
- Document12 .pdf · uploaded 28 Aug 2025Source
- Document13 .pdf · uploaded 28 Aug 2025Source
- Document14 .pdf · uploaded 28 Aug 2025Source
- Document15 .pdf · uploaded 28 Aug 2025Source
- Document16 .pdf · uploaded 28 Aug 2025Source
- Document17 .pdf · uploaded 28 Aug 2025Source
- Document18 .pdf · uploaded 28 Aug 2025Source
- Document19 .pdf · uploaded 28 Aug 2025Source
- Document20 .pdf · uploaded 28 Aug 2025Source
- Document21 .pdf · uploaded 28 Aug 2025Source
- Document22 .pdf · uploaded 28 Aug 2025Source
- Document23 .pdf · uploaded 28 Aug 2025Source
- Document24 .pdf · uploaded 28 Aug 2025Source
- Document25 .pdf · uploaded 28 Aug 2025Source
- Document26 .pdf · uploaded 28 Aug 2025Source
- Document28 .pdf · uploaded 28 Aug 2025Source
- Document29 .pdf · uploaded 28 Aug 2025Source
- Document30.pdf · uploaded 28 Aug 2025Source
- Document31.pdf · uploaded 28 Aug 2025Source
- OthersDeclaration commencement Certificate .pdf · uploaded 8 Sep 2025Source
Technical (Architect)
- DocumentForm 1 .pdf · uploaded 14 Oct 2024Source
- DocumentArch Cert.pdf · uploaded 5 Nov 2024Source
- DocumentArch 01072024.pdf · uploaded 10 Dec 2024Source
- DocumentArch cert 01102024.pdf · uploaded 10 Dec 2024Source
- DocumentVentana Form 1.pdf · uploaded 23 Jan 2025Source
- DocumentVentana Architect Certificate.pdf · uploaded 23 Apr 2025Source
- DocumentVentana - Form 1 - Arch Certificate.pdf · uploaded 18 Jul 2026Source
Technical (Engineer)
- DocumentEngg cert Ventana.pdf · uploaded 14 Oct 2024Source
- DocumentEng cert 19072024.pdf · uploaded 10 Dec 2024Source
- DocumentEng cert 19072024.pdf · uploaded 10 Dec 2024Source
- DocumentEng cert 30092024.pdf · uploaded 10 Dec 2024Source
- DocumentEng Cert.pdf · uploaded 13 Feb 2025Source
- Document3618_20250423155516_001.pdf · uploaded 23 Apr 2025Source
- DocumentVentana - Form 2 - Engg certificate.pdf · uploaded 18 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 111/11/1 (Part)
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 3BHK, 2BHK, 4BHK184 units in all
- Address
- 111/11/1 (Part), Mumbai Banglore Highway, BanerPIN 411045
- Village
- Baner, Haveli taluka
- Location
- 18.61154, 73.70668
- Land area for this project
- 4,378 sq m (47,129 sq ft)
- Permissible built-up area
- 36,306 sq m (3,90,792 sq ft)
- Sanctioned built-up area
- 36,306 sq m (3,90,791 sq ft)
- Recreational open space
- 1,181 sq m (12,714 sq ft)
- Designated bank account
- 220
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
111/11/1 (Part)
Boundaries
- North
- 12 meter Internal road
- South
- Remaining portion out of Survey No 111
- East
- Survey No 112
- West
- Remaining portion out of Survey No 111
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking184 units
98 of 184 units booked (53%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Tower A | 3BHK | — | 0 | 0 |
| Tower B | 2BHK | 70.1 sq m · 755 sq ft | 1 | 0 |
| Tower B | 2BHK | 73.62 sq m · 792 sq ft | 4 | 4 |
| Tower B | 3BHK | 91.1 sq m · 981 sq ft | 87 | 43 |
| Tower C | 2BHK | 78.53 sq m · 845 sq ft | 4 | 3 |
| Tower C | 3BHK | 97.15 sq m · 1,046 sq ft | 19 | 16 |
| Tower C | 3BHK | 99.28 sq m · 1,069 sq ft | 23 | 19 |
| Tower C | 3BHK | 101.43 sq m · 1,092 sq ft | 1 | 1 |
| Tower C | 4BHK | 125.99 sq m · 1,356 sq ft | 45 | 12 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals15
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Engineer | Nilesh Chavan | — |
| Engineer | Shivaji Ghatage | — |
| Registered real estate agent | Ajay Mahadev Pawar | — |
| Registered real estate agent | Gajanan Gangadhar Shingare | — |
| Registered real estate agent | Ganesh Jadhav | — |
| Registered real estate agent | Naresh Arun Chahande | — |
| Registered real estate agent | Niranjan Shivaling Dhabe | — |
| Registered real estate agent | Rohan Lahu Deshmukh | — |
Show all 15 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Sagar Arun Ambhorkar | — |
| Registered real estate agent | Sandesh Derek Rolston | — |
| Registered real estate agent | Satish Uttareshwar Tambare | — |
| Registered real estate agent | Shubham Shivhare | — |
| Registered real estate agent | Snehil Sunil Kumar Yadav | — |
| Registered real estate agent | Sonerao Satish Pandhare | — |
| Registered real estate agent | Tejashri Tanaji Patil | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Baner
- Sai Residency Cooperative Housing Society LimitedRERA PR1260002602726
- Merlin VertexRERA PC1261012602688
- Bliss NestRERA PR1260002602296
- GaurinandanRERA PR1260002602194
- One Space₹9,840 a sq ft
- Anantashree₹8,070 a sq ft
- FernnvaleRERA PM1260002601647
- Avika ResidencesRERA PR1260002601571
All 3,195 projects in Baner · Compare Merlin Ventana with another project
Merlin Ventana in numbers
Registered deals, summarised
Deedo has 310 registered documents at Merlin Ventana, from Jan 2024 to Sep 2026: 204 sales, 105 mortgages. The median registered sale since Jan 2024 works out to about ₹13,600 per sq ft, at a median of ₹1.39 Cr a deal; 0% of sales were resales.
- What is the price per sq ft at Merlin Ventana?
- The median registered sale since Jan 2024 works out to about ₹13,600 per sq ft, at a median of ₹1.39 Cr a deal; 0% of sales were resales.
- How many properties have been sold at Merlin Ventana?
- 204 sales are registered at Merlin Ventana.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Merlin Ventana by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Primary sale · Sep 2026
₹1.5–2 Cr