Skip to content
Residential / Group Housing · 1 building · 8 unitsRERA P52100053237

Malhar Serenity

Deedo IDDP-PUN-NRBW

It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 13% of its units are booked.

Baner, Pune 411045 · Property rates in Baner · by Malhar Developers AOP

DeliveryDue Dec 2026No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales13% booked1 of 8 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Dec 2026, with no extension on record

  • This projectRegistered 23 Oct 2023, completion promised 31 Dec 2026.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Sep 2025Malhar Serenity · 102Mortgage—View Mortgage, Sep 2025
Feb 2025Malhar Serenity · 201Mortgage—View Mortgage, Feb 2025
Jan 2025Malhar Serenity · 201Primary sale1,073 sq ftView Primary sale, Jan 2025

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100053237
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005323723 Oct 202331 Dec 202631 Dec 2026Malhar Developers AOPProject page
Documents145

2 documents held by Deedo, 143 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardAOP PAN CArd.pdf · uploaded 21 Aug 2023Source
  • Other – FinanceBank Withdrawl Declaration.pdf · uploaded 19 Jan 2024Source
  • Other – FinanceWithdrawl Declaration From Bank.pdf · uploaded 15 Apr 2024Source
  • Other – FinanceKaagaz_20240717_191903126621.pdf · uploaded 17 Jul 2024Source
  • Other – FinanceNo Withdrawl From Bank.pdf · uploaded 8 Oct 2024Source
  • Other – FinanceWithdrawn declaration Oct Dec 24.pdf · uploaded 20 Jan 2025Source
Show all 145 documentsShow fewer documents

Legal

  • Legal Title reportRera Search Report (1).pdf · uploaded 18 Sep 2023Source
  • Declaration Form BForm B Promoter.pdf · uploaded 18 Sep 2023Source
  • Declaration Form BForm B Notary (2).pdf · uploaded 19 Apr 2025Source

Migrated

  • 1 PAN CardAOP PAN CArd.pdf · uploaded 21 Aug 2023Source
  • 1 Copy of Layout Approval (in case of layout)Sanction Plan_compressed.pdf · uploaded 21 Aug 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentCC.pdf · uploaded 21 Aug 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect_Letter.pdf · uploaded 21 Aug 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsTejas Chaudhari Declaration.pdf · uploaded 21 Aug 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 26 Aug 2023Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of sold and unsold units.pdf · uploaded 26 Aug 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation.pdf · uploaded 26 Aug 2023Source
  • 1 a Details of encumbrances concerned to FinanceLegal Encumbrance.pdf · uploaded 9 Sep 2023Source
  • 1 b Details of encumbrances concerned to LegalLegal Encumbrance.pdf · uploaded 9 Sep 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentHPSC0093-compressed.pdf · uploaded 9 Sep 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDilip Chaudhari Annex A.pdf · uploaded 9 Sep 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsRahul Chaudhari Annex A.pdf · uploaded 9 Sep 2023Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsVijaya Chaudhari Annex A.pdf · uploaded 9 Sep 2023Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 10 Sep 2023Source
  • 1 Copy of the legal title reportRera Search Report (1).pdf · uploaded 18 Sep 2023Source
  • 1 Declaration in FORM BForm B Promoter.pdf · uploaded 18 Sep 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Rera Engineer Certificate.pdf · uploaded 19 Sep 2023Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 20 Sep 2023Source
  • 2 a Details of encumbrances concerned to FinanceFinancial Encumbrance.pdf · uploaded 23 Sep 2023Source
  • 2 b Details of encumbrances concerned to LegalFinancial Encumbrance.pdf · uploaded 23 Sep 2023Source
  • 1 CERSAI detailsCersai.pdf · uploaded 23 Sep 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Bank Account Declaration.pdf · uploaded 23 Sep 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 3 Oct 2023Source
  • 1 Proforma of Agreement for saleAgreement For Sale.pdf · uploaded 9 Oct 2023Source
  • 1 Deviation Report with respect to model copy of AgreementAFS Deviation.pdf · uploaded 9 Oct 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect letter.pdf · uploaded 19 Jan 2024Source
  • 1 Other – FinanceBank Withdrawl Declaration.pdf · uploaded 19 Jan 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Rera Engineer Certificate.pdf · uploaded 20 Jan 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ca Form 3 UPLOADED.pdf · uploaded 20 Jan 2024Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of sold inventory.pdf · uploaded 21 Jan 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA Architect letter.pdf · uploaded 15 Apr 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA Engineer Certificate.pdf · uploaded 15 Apr 2024Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of sold.pdf · uploaded 15 Apr 2024Source
  • 2 Other – FinanceWithdrawl Declaration From Bank.pdf · uploaded 15 Apr 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA.pdf · uploaded 20 Apr 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kaagaz_20240717_194247338535.pdf · uploaded 17 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Kaagaz_20240717_192059527388.pdf · uploaded 17 Jul 2024Source
  • 4 Disclosure of sold/ booked inventoryKaagaz_20240717_192003397952.pdf · uploaded 17 Jul 2024Source
  • 3 Other – FinanceKaagaz_20240717_191903126621.pdf · uploaded 17 Jul 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Kaagaz_20240717_19225369224.pdf · uploaded 19 Jul 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Kaagaz_20240720_213631633629.pdf · uploaded 20 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate July- Sep.pdf · uploaded 8 Oct 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC Revised.pdf · uploaded 8 Oct 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentRevised Sanction Plan.pdf · uploaded 8 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of sold Inventory .pdf · uploaded 8 Oct 2024Source
  • 1 Declaration about Commencement CertificateDeclaration about CC.pdf · uploaded 8 Oct 2024Source
  • 2 Other – FinanceNo Withdrawl From Bank.pdf · uploaded 8 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 FY 2023-24.pdf · uploaded 8 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA.pdf · uploaded 25 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 25 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)New Form 3.pdf · uploaded 28 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect OctDec24.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory .pdf · uploaded 20 Jan 2025Source
  • 1 Other – FinanceWithdrawn declaration Oct Dec 24.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Oct-Dec 24.pdf · uploaded 29 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Oct Dec 24.pdf · uploaded 14 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect.pdf · uploaded 18 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA.pdf · uploaded 18 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 18 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 18 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold inventory.pdf · uploaded 18 Apr 2025Source
  • 1 Declaration in FORM BForm B Notary (2).pdf · uploaded 19 Apr 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FOrm 2 Mar 2024 (1).pdf · uploaded 19 Apr 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 19 Apr 2025Source
  • 1 Declaration about Commencement CertificateDeclaration Commencement.pdf · uploaded 19 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Quality Assurance.pdf · uploaded 2 May 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory Q1 2025-26.pdf · uploaded 21 Jul 2025Source
  • Form 1Form 1 Q1 2025-26.pdf · uploaded 21 Jul 2025Source
  • Form 2Form 2 Q1 2025-26.pdf · uploaded 21 Jul 2025Source
  • Form 3DocScanner 17-Jul-2025 08-07 PM.pdf · uploaded 21 Jul 2025Source
  • Form 1Form 1 Architect.pdf · uploaded 21 Jul 2025Source
  • Form 2Form 2 Engineer Certificate.pdf · uploaded 21 Jul 2025Source
  • Form 3Form 3 CA.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold inventory.pdf · uploaded 21 Jul 2025Source
  • Form 1Architect Letter.pdf · uploaded 21 Jul 2025Source
  • Form 26 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked Inventory6 Disclosure of sold_ booked inventory.pdf · uploaded 21 Jul 2025Source
  • Form 3Form 3 Q3 of FY 2024-25 25-01-2024.pdf · uploaded 21 Jul 2025Source
  • Form 15 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 21 Jul 2025Source
  • Form 2Form 2 Engineer Certificate.pdf · uploaded 21 Jul 2025Source
  • Form 3Form 3 CA.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold Inventory .pdf · uploaded 21 Jul 2025Source
  • Form 1Architect Letter.pdf · uploaded 28 Jul 2025Source
  • Form 2Engineer Certificate.pdf · uploaded 28 Jul 2025Source
  • Form 3Form 3.pdf · uploaded 28 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold inventory.pdf · uploaded 28 Jul 2025Source
  • Form 1Architect Certificate.pdf · uploaded 28 Jul 2025Source
  • Form 2Engineer Certificate.pdf · uploaded 28 Jul 2025Source
  • Form 3Form 3.pdf · uploaded 28 Jul 2025Source
  • Disclosure of Sold and Booked Inventory3 Disclosure of sold_ booked inventory.pdf · uploaded 28 Jul 2025Source
  • Form 1Architect letter.pdf · uploaded 28 Jul 2025Source
  • Form 2Rera Engineer Certificate.pdf · uploaded 28 Jul 2025Source
  • Form 3Form 3.pdf · uploaded 28 Jul 2025Source
  • Disclosure of Sold and Booked Inventory2 Disclosure of sold_ booked inventory.pdf · uploaded 28 Jul 2025Source
  • Form 2A (FY 2023-2024)malharserenity form2 24.pdf · uploaded 16 Sep 2025Source
  • Form 2A (FY 2024-2025)malhar serenity form2A.pdf · uploaded 16 Sep 2025Source
  • Form 5 (FY 2023-2024)Form 5 FY 2023-24.pdf · uploaded 30 Sep 2025Source
  • Form 5 (FY 2024-2025)Form 5 2024-25.pdf · uploaded 30 Sep 2025Source
  • Form 1Form 1 Q2 25-26.pdf · uploaded 18 Oct 2025Source
  • Form 2Form 2 Q2 25-26.pdf · uploaded 18 Oct 2025Source
  • Form 3Form 3 Q2 25-26.pdf · uploaded 18 Oct 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold inventory Q2 25-26.pdf · uploaded 18 Oct 2025Source
  • Form 1Q3 25-26 Form 1.pdf · uploaded 18 Jan 2026Source
  • Form 2Q3 25-26 Form 2.pdf · uploaded 18 Jan 2026Source
  • Form 3Q3 25-26 Form 3.pdf · uploaded 18 Jan 2026Source
  • Disclosure of Sold and Booked InventoryQ3 25 Sold Unsold Inventory.pdf · uploaded 18 Jan 2026Source
  • Withdrawal Update Form 1Form 1 Q4 2025-26.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 2Form 2 Q4 2025-26.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 3Form 3 Q4 2025-26.pdf · uploaded 18 Apr 2026Source
  • Form 2A (FY 2025-2026)Form 2 A 2025-26.pdf · uploaded 18 Apr 2026Source
  • Form 5 (FY 2025-2026)Form 5 FY 25-26.pdf · uploaded 18 May 2026Source
  • Withdrawal Update Form 1Form 1 New (1).pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 2Form 2 New (1).pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 3Form 3 March 2026- Malhar serenity.pdf · uploaded 9 Jun 2026Source
  • Withdrawal Update Form 1Withdrawl Form 1.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2Withdrawl Form 2.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3Withdrawal Form 3.pdf · uploaded 18 Jul 2026Source

Technical

  • DocumentSanction Plan_compressed.pdf · uploaded 21 Aug 2023Source
  • DocumentCC.pdf · uploaded 21 Aug 2023Source
  • DocumentHPSC0093-compressed.pdf · uploaded 9 Sep 2023Source
  • DocumentRevised Sanction Plan.pdf · uploaded 8 Oct 2024Source
  • DocumentMain Layout (2).pdf · uploaded 9 Jun 2026Source

Technical (Architect)

  • DocumentArchitect Certificate July- Sep.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 1 Architect OctDec24.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 1 Architect.pdf · uploaded 18 Apr 2025Source
  • DocumentWithdrawl Form 1.pdf · uploaded 18 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 Engineer Certificate.pdf · uploaded 25 Oct 2024Source
  • DocumentEngineer Certificate Oct Dec 24.pdf · uploaded 14 Feb 2025Source
  • DocumentForm 2 Engineer Certificate.pdf · uploaded 18 Apr 2025Source
  • DocumentForm 2 Engineer Certificate.pdf · uploaded 18 Apr 2025Source
  • DocumentFOrm 2 Mar 2024 (1).pdf · uploaded 19 Apr 2025Source
  • Document8 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 19 Apr 2025Source
  • DocumentWithdrawl Form 2.pdf · uploaded 18 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel S.No 32/1A/2 Baner Pune

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
3BHK8 units in all
Address
S.No 32/1A/2 Baner Pune, S.No 32/1A/2, Baner PunePIN 411045
Village
Baner, Haveli taluka
Land area for this project
522 sq m (5,616 sq ft)
Permissible built-up area
1,720 sq m (18,513 sq ft)
Sanctioned built-up area
1,720 sq m (18,513 sq ft)
Recreational open space
0 sq m (0 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

S.No 32/1A/2 Baner Pune

Land as published on MahaRERA's project page

S.No 32/1A/2 Baner Pune

Boundaries

North
By Plot No 5 of S No 32-1A-2
South
By Plot No 7 of S No 32-1A-2
East
By 9 Meter wide Colony Road
West
By remaining Part of S No 32

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking8 units

1 of 8 units booked (13%), as the promoter reported to MahaRERA

3BHK · 8 units
TypeCarpet areaUnitsBooked
3BHK89.89 sq m · 968 sq ft40
3BHK99.69 sq m · 1,073 sq ft41

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRajendra Gaikwad—
Chartered accountantNikhita Gore—
Chartered accountantPravin Gavane—
Chartered accountantShriram Somwanshi—
EngineerDipali Ravindra Bharam—
EngineerRanjit Abhiman More—

Source: MahaRERA project page. Contact details are not shown.

Malhar Serenity in numbers

Registered deals, summarised

Deedo has 3 registered documents at Malhar Serenity, from Jan 2025 to Sep 2025: 1 sale, 2 mortgages.

How many properties have been sold at Malhar Serenity?
1 sale is registered at Malhar Serenity.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Malhar Serenity by Deedo, last updated with deals registered in Sep 2025.

Latest deal · Mortgage · Sep 2025

Exact price & Index II

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology