Commercial · 1 building · 48 unitsRERA P52100051935

Icon Oro

Deedo IDDP-PUN-KDZK

Completion was pushed back 1 year, to Mar 2028; no MahaRERA orders on record; 19% of its units are booked.

Baner, Pune 411045 · Property rates in Baner · by Icon Ventures

DeliveryExtended 1 yrPromised Mar 2027 · now due Mar 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales19% booked9 of 48 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 1 year, to Mar 2028

  • This projectRegistered 13 Jul 2023, completion promised 31 Mar 2027, revised to 30 Mar 2028.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

  • Rental · Jan 2024
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Jan 2024Icon Oro · 301Rental—View Rental, Jan 2024

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100051935
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005193513 Jul 202331 Mar 202730 Mar 2028Icon VenturesProject page
Documents123

2 documents held by Deedo, 121 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardPAN.pdf · uploaded 29 Mar 2023Source

Legal

  • Declaration Form BForm b declaration partners.pdf · uploaded 29 Mar 2023Source
  • Legal Title reportSearch Report Final as per owners C.pdf · uploaded 2 May 2023Source
  • Declaration Form BFORM B EXTENSION.pdf · uploaded 23 May 2024Source

Migrated

  • 1 PAN CardPAN.pdf · uploaded 29 Mar 2023Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrance financial.pdf · uploaded 29 Mar 2023Source
Show all 123 documentsShow fewer documents

Migrated

  • 1 b Details of encumbrances concerned to LegalEncumbrance financial.pdf · uploaded 29 Mar 2023Source
  • 1 Declaration in FORM BForm b declaration partners.pdf · uploaded 29 Mar 2023Source
  • 1 CERSAI detailsDeclaration Cersai.pdf · uploaded 29 Mar 2023Source
  • 1 Proforma of Allotment letterallotment letter NIKTE.pdf · uploaded 29 Mar 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate Bank Declaration format A.pdf · uploaded 29 Mar 2023Source
  • 1 Deviation Report with respect to Allotment letterDeclaration model copy of allotment.pdf · uploaded 29 Mar 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architet Certificate FORM 1 for Registration.pdf · uploaded 12 Apr 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2 for Registration.pdf · uploaded 12 Apr 2023Source
  • 2 a Details of encumbrances concerned to FinanceEncumbrances Legal.pdf · uploaded 20 Apr 2023Source
  • 2 b Details of encumbrances concerned to LegalEncumbrances Legal.pdf · uploaded 20 Apr 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ORO C.pdf · uploaded 20 Apr 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAVT.pdf · uploaded 20 Apr 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsPRT.pdf · uploaded 20 Apr 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsMMS.pdf · uploaded 20 Apr 2023Source
  • 1 Proforma of Agreement for saleAGREEMENT FOR SALE FORMAT.pdf · uploaded 20 Apr 2023Source
  • 1 Copy of the legal title reportSearch Report Final as per owners C.pdf · uploaded 2 May 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT ORO.pdf · uploaded 17 May 2023Source
  • 1 Copy of Layout Approval (in case of layout)BP 1 OF 4.pdf · uploaded 8 Jun 2023Source
  • 2 Copy of Layout Approval (in case of layout)BP 2 OF 4.pdf · uploaded 8 Jun 2023Source
  • 3 Copy of Layout Approval (in case of layout)BP 3 OF 4.pdf · uploaded 8 Jun 2023Source
  • 4 Copy of Layout Approval (in case of layout)BP 4 OF 4.pdf · uploaded 8 Jun 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentamalgamation.pdf · uploaded 8 Jun 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 14 Jun 2023Source
  • 1 Declaration about Commencement CertificateAdobe Scan Jun 27, 2023.pdf · uploaded 27 Jun 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Icon ORO Q1 FY2324.pdf · uploaded 10 Oct 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Icon ORO Q2 FY2324.pdf · uploaded 10 Oct 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Icon ORO Q1 FY2324.pdf · uploaded 10 Oct 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Icon ORO Q2 FY2324.pdf · uploaded 10 Oct 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ICON ORO 30062023C.pdf · uploaded 10 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ICON ORO 30092023C.pdf · uploaded 10 Oct 2023Source
  • 1 Disclosure of sold/ booked inventoryIcon ORO Sold Unsold 30092023.pdf · uploaded 18 Oct 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q3 FY 2324 - ICON ORO.pdf · uploaded 5 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q3 FY 2324 - ICON ORO.pdf · uploaded 5 Jan 2024Source
  • 2 Disclosure of sold/ booked inventoryQ3 ICON ORO SOLD UNSOLD.pdf · uploaded 30 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q3 FY 2324 IV.pdf · uploaded 13 Feb 2024Source
  • 5 Copy of Layout Approval (in case of layout)plan 01.pdf · uploaded 16 Mar 2024Source
  • 6 Copy of Layout Approval (in case of layout)plan 02.pdf · uploaded 16 Mar 2024Source
  • 7 Copy of Layout Approval (in case of layout)plan 03.pdf · uploaded 16 Mar 2024Source
  • 8 Copy of Layout Approval (in case of layout)plan 04.pdf · uploaded 16 Mar 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentcc.pdf · uploaded 16 Mar 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q4 FY2324.pdf · uploaded 8 Apr 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q4 FY 2324 - ICON ORO.pdf · uploaded 8 Apr 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ICON ORO Q4 FY 2324.pdf · uploaded 26 Apr 2024Source
  • 3 Disclosure of sold/ booked inventoryICON ORO Sold and Unsold Inventory.pdf · uploaded 21 May 2024Source
  • 2 Declaration in FORM BFORM B EXTENSION.pdf · uploaded 23 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 FORM 1 ORO Q3 SIGNED.pdf · uploaded 23 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A- ICON VENTURES (MARCH 2024).pdf · uploaded 27 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 ICON ORO.pdf · uploaded 28 May 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)5_FORM 1 Q1 FY2425.pdf · uploaded 23 Oct 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)6_FORM 1 Q1 FY2425.pdf · uploaded 23 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)5_ FORM 3 ICON ORO 30062024.pdf · uploaded 23 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)6_ FORM 3 ICON ORO 30092024.pdf · uploaded 23 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)5_FORM 2 Q1 FY 2425_ICON ORO.pdf · uploaded 23 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)6_FORM 2 Q2 FY 2425_ICON_ORO.pdf · uploaded 23 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryICON ORO SOLD UNSOLD Q1 2425.pdf · uploaded 24 Oct 2024Source
  • 3 Disclosure of sold/ booked inventoryICON ORO SOLD UNSOLD Q2 2425.pdf · uploaded 24 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 2 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold ORO Q3 2425.pdf · uploaded 23 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ICON ORO FORM 3 FOR Q3 FY2425.pdf · uploaded 3 Mar 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate 21032025.pdf · uploaded 26 Mar 2025Source
  • 1 Building Plan Approval / NA Order for plotted development1-5.pdf · uploaded 26 Mar 2025Source
  • 2 Building Plan Approval / NA Order for plotted development2-5.pdf · uploaded 26 Mar 2025Source
  • 3 Building Plan Approval / NA Order for plotted development3-5.pdf · uploaded 26 Mar 2025Source
  • 4 Building Plan Approval / NA Order for plotted development4-5.pdf · uploaded 26 Mar 2025Source
  • 5 Building Plan Approval / NA Order for plotted development5-5.pdf · uploaded 26 Mar 2025Source
  • 1 Declaration about Commencement CertificateDeclaration of Commencement 21032025.pdf · uploaded 26 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ICON ORO 31032025.pdf · uploaded 24 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ICON ORO Q4 2425.pdf · uploaded 24 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)8_FORM 2 Q4 FY 2425_ICON_ORO.pdf · uploaded 24 Apr 2025Source
  • Withdrawal Update Form 1FORM 1 ICON ORO Q1 2526.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 2FORM 2 ICON ORO Q1 2526.pdf · uploaded 22 Jul 2025Source
  • Withdrawal Update Form 3FORM 3 Q1 FY 2526 ICON ORO.pdf · uploaded 22 Jul 2025Source
  • Form 5 (FY 2023-2024)FORM 5 FY 2324 ORO.pdf · uploaded 30 Sep 2025Source
  • Form 5 (FY 2024-2025)FORM 5 ICON VENTURES ORD.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1FORM 1 Q2 FY2526 ICON ORO.pdf · uploaded 25 Oct 2025Source
  • Withdrawal Update Form 2FORM 2 Q2 FY2526 ICON ORO.pdf · uploaded 25 Oct 2025Source
  • Withdrawal Update Form 3ICON ORO Q2 FY 2526.pdf · uploaded 25 Oct 2025Source
  • Withdrawal Update Form 1FORM 1 Q3 ICON ORO FY 2526.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2FORM 2 Q3 ICON ORO FY 2526.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3ICON ORO FORM 3 Q3 FY2526.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1FORM 1 Q4 FY 25-26 ICON ORO.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 2FORM 2 Q4 FY 25-26 ICON ORO.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 Q4 FY 25-26 ICON ORO.pdf · uploaded 27 Apr 2026Source
  • Form 2A (FY 2025-2026)ICON ORO FORM 2A SIGNED 2526.pdf · uploaded 29 Jun 2026Source
  • Withdrawal Update Form 1FORM 1 ICON ORO 30062026.pdf · uploaded 19 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 ICON ORO 30062026.pdf · uploaded 19 Jul 2026Source
  • Withdrawal Update Form 3ICON ORO FORM 3 Q1 FY26227.pdf · uploaded 19 Jul 2026Source
  • Form 5 (FY 2025-2026)ICON VENTURES FORM 5 FY 2526 SIGNED.pdf · uploaded 28 Sep 2026Source

Technical

  • DocumentBP 1 OF 4.pdf · uploaded 8 Jun 2023Source
  • DocumentBP 2 OF 4.pdf · uploaded 8 Jun 2023Source
  • DocumentBP 3 OF 4.pdf · uploaded 8 Jun 2023Source
  • DocumentBP 4 OF 4.pdf · uploaded 8 Jun 2023Source
  • Documentamalgamation.pdf · uploaded 8 Jun 2023Source
  • Documentplan 01.pdf · uploaded 16 Mar 2024Source
  • Documentplan 02.pdf · uploaded 16 Mar 2024Source
  • Documentplan 03.pdf · uploaded 16 Mar 2024Source
  • Documentplan 04.pdf · uploaded 16 Mar 2024Source
  • Document1-5.pdf · uploaded 26 Mar 2025Source
  • Document2-5.pdf · uploaded 26 Mar 2025Source
  • Document3-5.pdf · uploaded 26 Mar 2025Source
  • Document4-5.pdf · uploaded 26 Mar 2025Source
  • Document5-5.pdf · uploaded 26 Mar 2025Source

Technical (Architect)

  • Document5_FORM 1 Q1 FY2425.pdf · uploaded 23 Oct 2024Source
  • Document6_FORM 1 Q1 FY2425.pdf · uploaded 23 Oct 2024Source
  • DocumentFORM 2 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
  • DocumentFORM 1 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
  • DocumentFORM 1 ICON ORO 31032025.pdf · uploaded 24 Apr 2025Source
  • DocumentFORM 1 ICON ORO 30062026.pdf · uploaded 19 Jul 2026Source

Technical (Engineer)

  • Document5_FORM 2 Q1 FY 2425_ICON ORO.pdf · uploaded 23 Oct 2024Source
  • Document6_FORM 2 Q2 FY 2425_ICON_ORO.pdf · uploaded 23 Oct 2024Source
  • DocumentFORM 2 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
  • Document8_FORM 2 Q4 FY 2425_ICON_ORO.pdf · uploaded 24 Apr 2025Source
  • DocumentFORM 2 ICON ORO 30062026.pdf · uploaded 19 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel SR NO 33/1(PART)

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Office space, Showroom48 units in all
Address
Sr No 33/1(Part), Baner, BanerPIN 411045
Village
Baner, Haveli taluka
Land area for this project
2,558 sq m (27,534 sq ft)
Permissible built-up area
13,180 sq m (1,41,866 sq ft)
Sanctioned built-up area
4,353 sq m (46,850 sq ft)
Designated bank account
82
Developed in phases
No

Survey, CTS, gat or plot numbers

SR NO 33/1(PART)

Land as published on MahaRERA's project page

SR NO 33/1(PART)

Boundaries

North
Sr No 33 Part
South
Sr No 33 Part
East
30 Meter Wide Road
West
Sr No 33 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking48 units

9 of 48 units booked (19%), as the promoter reported to MahaRERA

Office space · 44 unitsShowroom · 4 units
TypeCarpet areaUnitsBooked
Office space64.16 sq m · 691 sq ft51
Office space64.7 sq m · 696 sq ft50
Office space73.87 sq m · 795 sq ft51
Office space74.32 sq m · 800 sq ft50
Office space76.22 sq m · 820 sq ft41
Office space76.3 sq m · 821 sq ft10
Office space97.37 sq m · 1,048 sq ft51
Office space124.19 sq m · 1,337 sq ft42
Show all 15 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Office space156.99 sq m · 1,690 sq ft42
Office space209.63 sq m · 2,256 sq ft11
Office space343.67 sq m · 3,699 sq ft50
Showroom185.22 sq m · 1,994 sq ft10
Showroom196.22 sq m · 2,112 sq ft10
Showroom199.66 sq m · 2,149 sq ft10
Showroom249.83 sq m · 2,689 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNiranjan Jog—
Chartered accountantSiddharth S Smart—
EngineerKalpak Constructions—
EngineerMahesh Damodar Joshi—
OtherJ W Consultants LLP—
OtherSiddhivinayak Mep Consultants Narendra Chavan—

Source: MahaRERA project page. Contact details are not shown.

Icon Oro in numbers

Registered deals, summarised

Deedo has 1 registered document at Icon Oro, from Jan 2024 to Jan 2024: 1 leave and licence agreement.

Are properties at Icon Oro rented out?
Yes: 1 leave and licence agreement is registered at Icon Oro.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Icon Oro by Deedo, last updated with deals registered in Jan 2024.

Latest deal · Rental · Jan 2024

Under ₹25 L total

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology