Icon Oro
Deedo IDDP-PUN-KDZKCompletion was pushed back 1 year, to Mar 2028; no MahaRERA orders on record; 19% of its units are booked.
Baner, Pune 411045 · Property rates in Baner · by Icon Ventures
Buying a flat here?
See every deed registered on it.
Completion was pushed back 1 year, to Mar 2028
- This projectRegistered 13 Jul 2023, completion promised 31 Mar 2027, revised to 30 Mar 2028.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Rental · Jan 2024
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Jan 2024 | Icon Oro · 301 | Rental | — | View Rental, Jan 2024 |
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100051935
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100051935 | 13 Jul 2023 | 31 Mar 2027 | 30 Mar 2028 | Icon Ventures | Project page |
Documents123
2 documents held by Deedo, 121 filings listed on MahaRERA's project page
Finance
- PAN CardPAN.pdf · uploaded 29 Mar 2023Source
Legal
Show all 123 documentsShow fewer documents
Migrated
- 1 b Details of encumbrances concerned to LegalEncumbrance financial.pdf · uploaded 29 Mar 2023Source
- 1 Declaration in FORM BForm b declaration partners.pdf · uploaded 29 Mar 2023Source
- 1 CERSAI detailsDeclaration Cersai.pdf · uploaded 29 Mar 2023Source
- 1 Proforma of Allotment letterallotment letter NIKTE.pdf · uploaded 29 Mar 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate Bank Declaration format A.pdf · uploaded 29 Mar 2023Source
- 1 Deviation Report with respect to Allotment letterDeclaration model copy of allotment.pdf · uploaded 29 Mar 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architet Certificate FORM 1 for Registration.pdf · uploaded 12 Apr 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2 for Registration.pdf · uploaded 12 Apr 2023Source
- 2 a Details of encumbrances concerned to FinanceEncumbrances Legal.pdf · uploaded 20 Apr 2023Source
- 2 b Details of encumbrances concerned to LegalEncumbrances Legal.pdf · uploaded 20 Apr 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ORO C.pdf · uploaded 20 Apr 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAVT.pdf · uploaded 20 Apr 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsPRT.pdf · uploaded 20 Apr 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsMMS.pdf · uploaded 20 Apr 2023Source
- 1 Proforma of Agreement for saleAGREEMENT FOR SALE FORMAT.pdf · uploaded 20 Apr 2023Source
- 1 Copy of the legal title reportSearch Report Final as per owners C.pdf · uploaded 2 May 2023Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT ORO.pdf · uploaded 17 May 2023Source
- 1 Copy of Layout Approval (in case of layout)BP 1 OF 4.pdf · uploaded 8 Jun 2023Source
- 2 Copy of Layout Approval (in case of layout)BP 2 OF 4.pdf · uploaded 8 Jun 2023Source
- 3 Copy of Layout Approval (in case of layout)BP 3 OF 4.pdf · uploaded 8 Jun 2023Source
- 4 Copy of Layout Approval (in case of layout)BP 4 OF 4.pdf · uploaded 8 Jun 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentamalgamation.pdf · uploaded 8 Jun 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 14 Jun 2023Source
- 1 Declaration about Commencement CertificateAdobe Scan Jun 27, 2023.pdf · uploaded 27 Jun 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Icon ORO Q1 FY2324.pdf · uploaded 10 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Icon ORO Q2 FY2324.pdf · uploaded 10 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Icon ORO Q1 FY2324.pdf · uploaded 10 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Icon ORO Q2 FY2324.pdf · uploaded 10 Oct 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ICON ORO 30062023C.pdf · uploaded 10 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ICON ORO 30092023C.pdf · uploaded 10 Oct 2023Source
- 1 Disclosure of sold/ booked inventoryIcon ORO Sold Unsold 30092023.pdf · uploaded 18 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q3 FY 2324 - ICON ORO.pdf · uploaded 5 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q3 FY 2324 - ICON ORO.pdf · uploaded 5 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryQ3 ICON ORO SOLD UNSOLD.pdf · uploaded 30 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q3 FY 2324 IV.pdf · uploaded 13 Feb 2024Source
- 5 Copy of Layout Approval (in case of layout)plan 01.pdf · uploaded 16 Mar 2024Source
- 6 Copy of Layout Approval (in case of layout)plan 02.pdf · uploaded 16 Mar 2024Source
- 7 Copy of Layout Approval (in case of layout)plan 03.pdf · uploaded 16 Mar 2024Source
- 8 Copy of Layout Approval (in case of layout)plan 04.pdf · uploaded 16 Mar 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentcc.pdf · uploaded 16 Mar 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q4 FY2324.pdf · uploaded 8 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q4 FY 2324 - ICON ORO.pdf · uploaded 8 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ICON ORO Q4 FY 2324.pdf · uploaded 26 Apr 2024Source
- 3 Disclosure of sold/ booked inventoryICON ORO Sold and Unsold Inventory.pdf · uploaded 21 May 2024Source
- 2 Declaration in FORM BFORM B EXTENSION.pdf · uploaded 23 May 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 FORM 1 ORO Q3 SIGNED.pdf · uploaded 23 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A- ICON VENTURES (MARCH 2024).pdf · uploaded 27 May 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 ICON ORO.pdf · uploaded 28 May 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)5_FORM 1 Q1 FY2425.pdf · uploaded 23 Oct 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)6_FORM 1 Q1 FY2425.pdf · uploaded 23 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)5_ FORM 3 ICON ORO 30062024.pdf · uploaded 23 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)6_ FORM 3 ICON ORO 30092024.pdf · uploaded 23 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)5_FORM 2 Q1 FY 2425_ICON ORO.pdf · uploaded 23 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)6_FORM 2 Q2 FY 2425_ICON_ORO.pdf · uploaded 23 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryICON ORO SOLD UNSOLD Q1 2425.pdf · uploaded 24 Oct 2024Source
- 3 Disclosure of sold/ booked inventoryICON ORO SOLD UNSOLD Q2 2425.pdf · uploaded 24 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 2 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold ORO Q3 2425.pdf · uploaded 23 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ICON ORO FORM 3 FOR Q3 FY2425.pdf · uploaded 3 Mar 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate 21032025.pdf · uploaded 26 Mar 2025Source
- 1 Building Plan Approval / NA Order for plotted development1-5.pdf · uploaded 26 Mar 2025Source
- 2 Building Plan Approval / NA Order for plotted development2-5.pdf · uploaded 26 Mar 2025Source
- 3 Building Plan Approval / NA Order for plotted development3-5.pdf · uploaded 26 Mar 2025Source
- 4 Building Plan Approval / NA Order for plotted development4-5.pdf · uploaded 26 Mar 2025Source
- 5 Building Plan Approval / NA Order for plotted development5-5.pdf · uploaded 26 Mar 2025Source
- 1 Declaration about Commencement CertificateDeclaration of Commencement 21032025.pdf · uploaded 26 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ICON ORO 31032025.pdf · uploaded 24 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ICON ORO Q4 2425.pdf · uploaded 24 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)8_FORM 2 Q4 FY 2425_ICON_ORO.pdf · uploaded 24 Apr 2025Source
- Withdrawal Update Form 1FORM 1 ICON ORO Q1 2526.pdf · uploaded 22 Jul 2025Source
- Withdrawal Update Form 2FORM 2 ICON ORO Q1 2526.pdf · uploaded 22 Jul 2025Source
- Withdrawal Update Form 3FORM 3 Q1 FY 2526 ICON ORO.pdf · uploaded 22 Jul 2025Source
- Form 5 (FY 2023-2024)FORM 5 FY 2324 ORO.pdf · uploaded 30 Sep 2025Source
- Form 5 (FY 2024-2025)FORM 5 ICON VENTURES ORD.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 1FORM 1 Q2 FY2526 ICON ORO.pdf · uploaded 25 Oct 2025Source
- Withdrawal Update Form 2FORM 2 Q2 FY2526 ICON ORO.pdf · uploaded 25 Oct 2025Source
- Withdrawal Update Form 3ICON ORO Q2 FY 2526.pdf · uploaded 25 Oct 2025Source
- Withdrawal Update Form 1FORM 1 Q3 ICON ORO FY 2526.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2FORM 2 Q3 ICON ORO FY 2526.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3ICON ORO FORM 3 Q3 FY2526.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1FORM 1 Q4 FY 25-26 ICON ORO.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 2FORM 2 Q4 FY 25-26 ICON ORO.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 3FORM 3 Q4 FY 25-26 ICON ORO.pdf · uploaded 27 Apr 2026Source
- Form 2A (FY 2025-2026)ICON ORO FORM 2A SIGNED 2526.pdf · uploaded 29 Jun 2026Source
- Withdrawal Update Form 1FORM 1 ICON ORO 30062026.pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 2FORM 2 ICON ORO 30062026.pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 3ICON ORO FORM 3 Q1 FY26227.pdf · uploaded 19 Jul 2026Source
- Form 5 (FY 2025-2026)ICON VENTURES FORM 5 FY 2526 SIGNED.pdf · uploaded 28 Sep 2026Source
Technical
- DocumentBP 1 OF 4.pdf · uploaded 8 Jun 2023Source
- DocumentBP 2 OF 4.pdf · uploaded 8 Jun 2023Source
- DocumentBP 3 OF 4.pdf · uploaded 8 Jun 2023Source
- DocumentBP 4 OF 4.pdf · uploaded 8 Jun 2023Source
- Documentamalgamation.pdf · uploaded 8 Jun 2023Source
- Documentplan 01.pdf · uploaded 16 Mar 2024Source
- Documentplan 02.pdf · uploaded 16 Mar 2024Source
- Documentplan 03.pdf · uploaded 16 Mar 2024Source
- Documentplan 04.pdf · uploaded 16 Mar 2024Source
- Document1-5.pdf · uploaded 26 Mar 2025Source
- Document2-5.pdf · uploaded 26 Mar 2025Source
- Document3-5.pdf · uploaded 26 Mar 2025Source
- Document4-5.pdf · uploaded 26 Mar 2025Source
- Document5-5.pdf · uploaded 26 Mar 2025Source
Technical (Architect)
- Document5_FORM 1 Q1 FY2425.pdf · uploaded 23 Oct 2024Source
- Document6_FORM 1 Q1 FY2425.pdf · uploaded 23 Oct 2024Source
- DocumentFORM 2 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
- DocumentFORM 1 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
- DocumentFORM 1 ICON ORO 31032025.pdf · uploaded 24 Apr 2025Source
- DocumentFORM 1 ICON ORO 30062026.pdf · uploaded 19 Jul 2026Source
Technical (Engineer)
- Document5_FORM 2 Q1 FY 2425_ICON ORO.pdf · uploaded 23 Oct 2024Source
- Document6_FORM 2 Q2 FY 2425_ICON_ORO.pdf · uploaded 23 Oct 2024Source
- DocumentFORM 2 Q3 2425 ORO.pdf · uploaded 23 Jan 2025Source
- Document8_FORM 2 Q4 FY 2425_ICON_ORO.pdf · uploaded 24 Apr 2025Source
- DocumentFORM 2 ICON ORO 30062026.pdf · uploaded 19 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel SR NO 33/1(PART)
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Unit types
- Office space, Showroom48 units in all
- Address
- Sr No 33/1(Part), Baner, BanerPIN 411045
- Village
- Baner, Haveli taluka
- Land area for this project
- 2,558 sq m (27,534 sq ft)
- Permissible built-up area
- 13,180 sq m (1,41,866 sq ft)
- Sanctioned built-up area
- 4,353 sq m (46,850 sq ft)
- Designated bank account
- 82
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SR NO 33/1(PART)
Boundaries
- North
- Sr No 33 Part
- South
- Sr No 33 Part
- East
- 30 Meter Wide Road
- West
- Sr No 33 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking48 units
9 of 48 units booked (19%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 64.16 sq m · 691 sq ft | 5 | 1 |
| Office space | 64.7 sq m · 696 sq ft | 5 | 0 |
| Office space | 73.87 sq m · 795 sq ft | 5 | 1 |
| Office space | 74.32 sq m · 800 sq ft | 5 | 0 |
| Office space | 76.22 sq m · 820 sq ft | 4 | 1 |
| Office space | 76.3 sq m · 821 sq ft | 1 | 0 |
| Office space | 97.37 sq m · 1,048 sq ft | 5 | 1 |
| Office space | 124.19 sq m · 1,337 sq ft | 4 | 2 |
Show all 15 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 156.99 sq m · 1,690 sq ft | 4 | 2 |
| Office space | 209.63 sq m · 2,256 sq ft | 1 | 1 |
| Office space | 343.67 sq m · 3,699 sq ft | 5 | 0 |
| Showroom | 185.22 sq m · 1,994 sq ft | 1 | 0 |
| Showroom | 196.22 sq m · 2,112 sq ft | 1 | 0 |
| Showroom | 199.66 sq m · 2,149 sq ft | 1 | 0 |
| Showroom | 249.83 sq m · 2,689 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Niranjan Jog | — |
| Chartered accountant | Siddharth S Smart | — |
| Engineer | Kalpak Constructions | — |
| Engineer | Mahesh Damodar Joshi | — |
| Other | J W Consultants LLP | — |
| Other | Siddhivinayak Mep Consultants Narendra Chavan | — |
Source: MahaRERA project page. Contact details are not shown.
Icon Oro in numbers
Registered deals, summarised
Deedo has 1 registered document at Icon Oro, from Jan 2024 to Jan 2024: 1 leave and licence agreement.
- Are properties at Icon Oro rented out?
- Yes: 1 leave and licence agreement is registered at Icon Oro.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Icon Oro by Deedo, last updated with deals registered in Jan 2024.
Latest deal · Rental · Jan 2024
Under ₹25 L total