Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 30 Jan 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Rental · Apr 2024
- Mortgage · Mar 2024
- Mortgage · Mar 2024
- Primary sale · Mar 2023
- Primary sale · Mar 2023
- Primary sale · Mar 2023
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Apr 2024 | Amar Delta One · 1 | Rental | — | View Rental, Apr 2024 | |
| Mar 2024 | Amar Delta One · 2 | Mortgage | 1,582 sq ft | View Mortgage, Mar 2024 | |
| Mar 2024 | Amar Delta One · 2 | Mortgage | 1,582 sq ft | View Mortgage, Mar 2024 | |
| Mar 2023 | Amar Delta One | Primary sale | 14,230 sq ft | View Primary sale, Mar 2023 | |
| Mar 2023 | Amar Delta One | Primary sale | 14,230 sq ft | View Primary sale, Mar 2023 | |
| Mar 2023 | Amar Delta One | Primary sale | 11,439 sq ft | View Primary sale, Mar 2023 |
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100049055
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100049055 | 30 Jan 2023 | 31 Dec 2026 | 30 Apr 2027 | Delta Estates LLP | Project page |
Documents128
1 document held by Deedo, 127 filings listed on MahaRERA's project page
Finance
Legal
- Declaration Form BFORM B - AFFIDAVIT.pdf · uploaded 23 Dec 2022Source
- Legal Title reportTITLE REPORT.pdf · uploaded 20 Jan 2023Source
- Legal Title reportADONE - TITLE REPORT.pdf · uploaded 19 Jul 2023Source
- Legal Title reportTITLE REPORT.pdf · uploaded 9 Oct 2024Source
- Declaration Form BTHIRD SUPPLE LEGAL TITLE REPORT.pdf · uploaded 2 Mar 2026Source
Show all 128 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardDE - PAN.pdf · uploaded 23 Dec 2022Source
- 1 a Details of encumbrances concerned to FinanceENCUMBRANCE CERTIFICATE -FINANCE.pdf · uploaded 23 Dec 2022Source
- 1 b Details of encumbrances concerned to LegalENCUMBRANCE CERTIFICATE -FINANCE.pdf · uploaded 23 Dec 2022Source
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 23 Dec 2022Source
- 2 Copy of Layout Approval (in case of layout)2.pdf · uploaded 23 Dec 2022Source
- 3 Copy of Layout Approval (in case of layout)3.pdf · uploaded 23 Dec 2022Source
- 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 23 Dec 2022Source
- 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 23 Dec 2022Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 23 Dec 2022Source
- 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 23 Dec 2022Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 23 Dec 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC - BUILDING.pdf · uploaded 23 Dec 2022Source
- 1 Declaration about Commencement CertificateDECLARATION OF COMMENCEMENT.pdf · uploaded 23 Dec 2022Source
- 1 Declaration in FORM BFORM B - AFFIDAVIT.pdf · uploaded 23 Dec 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERTIFICATE.pdf · uploaded 23 Dec 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTIFICATE.pdf · uploaded 23 Dec 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSEPERATE BANK ACCOUNT DETAILS.pdf · uploaded 23 Dec 2022Source
- 1 Deviation Report with respect to Allotment letterDEVIATION WITH ALLLOTMENT.pdf · uploaded 23 Dec 2022Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION WITH AGREEMENT.pdf · uploaded 23 Dec 2022Source
- 1 CERSAI detailsCERSAI REPORT.pdf · uploaded 6 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF INTEREST.pdf · uploaded 7 Jan 2023Source
- 1 Copy of the legal title reportTITLE REPORT.pdf · uploaded 20 Jan 2023Source
- 2 a Details of encumbrances concerned to FinanceENCUMBRANCE CERTIFICATE -LEGAL.pdf · uploaded 20 Jan 2023Source
- 2 b Details of encumbrances concerned to LegalENCUMBRANCE CERTIFICATE -LEGAL.pdf · uploaded 20 Jan 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)AD ONE - Form-3.pdf · uploaded 20 Jan 2023Source
- 1 Proforma of Agreement for saleAGREEMENT FOR SALE.pdf · uploaded 20 Jan 2023Source
- 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 24 Jan 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTIFICATE-.pdf · uploaded 10 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A - QUALITY ASSURANCE CERT-MAR 2022.pdf · uploaded 10 May 2023Source
- 1 Disclosure of sold/ booked inventoryAD ONE Disclosure of Sold Unsold Units.pdf · uploaded 10 May 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)AD ONE - FORM 3_ UPTO MARCH 2023.pdf · uploaded 10 May 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECTS CERTIFICATE-.pdf · uploaded 13 May 2023Source
- 2 Copy of the legal title reportADONE - TITLE REPORT.pdf · uploaded 19 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A - QUALITY ASSURANCE CERT-MAR 2022.pdf · uploaded 21 Sep 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTIFICATE-.pdf · uploaded 23 Sep 2023Source
- 2 Disclosure of sold/ booked inventoryAD ONE Disclosure of Sold Unsold Units.pdf · uploaded 23 Sep 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERTIFICATE-.pdf · uploaded 23 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERT_AD ONE.pdf · uploaded 23 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTI_AD ONE.pdf · uploaded 23 Oct 2023Source
- 3 Disclosure of sold/ booked inventoryAD ONE - Disclosure of Sold and Unsold Units.pdf · uploaded 23 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - AD ONE 2022-23.pdf · uploaded 15 Dec 2023Source
- 1 Home Buyer /Allottee Grievance Redressal CellREREA GRIEVANCE REDRESSAL CELL.pdf · uploaded 18 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERT_AD ONE.pdf · uploaded 20 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTI_AD ONE.pdf · uploaded 20 Jan 2024Source
- 4 Disclosure of sold/ booked inventoryAD ONE - Disclosure of Sold And Unsold Units.pdf · uploaded 20 Jan 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)01 AD ONE - FORM 3_ UPTO DEC 2023.pdf · uploaded 22 Feb 2024Source
- 3 a Details of encumbrances concerned to FinanceAD ONE_Encumbrances Cert.pdf · uploaded 10 May 2024Source
- 3 b Details of encumbrances concerned to LegalAD ONE_Encumbrances Cert.pdf · uploaded 10 May 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERT_AD ONE.pdf · uploaded 10 May 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTI_AD ONE.pdf · uploaded 10 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A - QUALITY ASSURANCE CERT-2023-24.pdf · uploaded 10 May 2024Source
- 5 Disclosure of sold/ booked inventoryAD ONE - Disclosure of Sold and Unsold Units.pdf · uploaded 10 May 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERT_AD ONE.pdf · uploaded 20 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTI_AD ONE.pdf · uploaded 20 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryAD ONE - Disclosure of Sold and Unsold Units.pdf · uploaded 20 Jul 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)01 AD ONE - FORM 3_ UPTO MAR 2024.pdf · uploaded 31 Jul 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)01 AD ONE - FORM 3_ UPTO JUNE 2024.pdf · uploaded 20 Aug 2024Source
- 1 Copy of the legal title reportTITLE REPORT.pdf · uploaded 9 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTI_AD ONE.pdf · uploaded 17 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryAD ONE - Disclosure of Sold Unsold Units.pdf · uploaded 17 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - AD ONE 2023-24.pdf · uploaded 17 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERT_AD ONE.pdf · uploaded 4 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)AD ONE - FORM 3_ SEPT 2024.pdf · uploaded 25 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERT_AD ONE_Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTI_AD ONE_Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)AD ONE - FORM 3_ UPTO DEC 2024.pdf · uploaded 28 Mar 2025Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 17 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - ARCHITECT'S CERT_AD ONE_Mar 25.pdf · uploaded 17 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEER'S CERTI_AD ONE_Mar 25.pdf · uploaded 17 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentBLDG CC.pdf · uploaded 17 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan.pdf · uploaded 17 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryAD ONE - Sold Unsold Units_Mar 25.pdf · uploaded 17 Apr 2025Source
- 1 Declaration about Commencement CertificateDECLARATION OF COMM CERT.pdf · uploaded 17 Apr 2025Source
- Withdrawal Update Form 1FORM 1 - ARCHITECTu0027S CERT_AD ONE_June 25.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 2FORM 2 - ENGINEERu0027S CERTI_AD ONE.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 3AD ONE - FORM 3_ UPTO DEC 2024.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 1FORM 1 - ARCHITECTu0027S CERT_AD ONE_Mar 25.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1FORM 1 - ARCHITECTu0027S CERT_AD ONE_June 25.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2FORM 2 - ENGINEERu0027S CERTI_AD ONE_Mar 25.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2FORM 2 - ENGINEERu0027S CERTI_AD ONE_June 25.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3Form 3_July 2025.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1DELTA FORM 1-Sept 2025.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 2DELTA FORM 2-Sept 2025.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 3FORM 3 AD One -Sept 2025.pdf · uploaded 30 Sep 2025Source
- Form 5 (FY 2024-2025)AD One-Form 5_2024-25.pdf · uploaded 25 Nov 2025Source
- Withdrawal Update Form 1FORM 1 - ARCHITECT CERT_AD ONE_Dec 25.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 2FORM 2 - ENGINEER CERTI_AD ONE_Dec 25.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 3FORM 3 AD One -Sept 2025.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 1FORM 1 - ARCHITECT CERT_AD ONE_Dec 25.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 2FORM 2 - ENGINEER CERTI_AD ONE_Dec 25.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 301 AD ONE - FORM 3_ DEC 2025.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 1ADONE FORM 1 MAR 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2AD ONE FORM 2 MAR 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 301 AD ONE - FORM 3_ DEC 2025.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1AD ONE FORM 1 JUN 26.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2AD ONE FORM 2 JUN 26.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 301 AD ONE - FORM 3-MARCH 26.pdf · uploaded 20 Jul 2026Source
- Form 2A (FY 2024-2025)Form 2A - AD ONE 2024-25.pdf · uploaded 21 Jul 2026Source
- Form 2A (FY 2025-2026)Form 2A - AD ONE 2025-26.pdf · uploaded 21 Jul 2026Source
Technical
- Document1.pdf · uploaded 23 Dec 2022Source
- Document2.pdf · uploaded 23 Dec 2022Source
- Document3.pdf · uploaded 23 Dec 2022Source
- Document1.pdf · uploaded 23 Dec 2022Source
- Document2.pdf · uploaded 23 Dec 2022Source
- Document3.pdf · uploaded 23 Dec 2022Source
- Document4.pdf · uploaded 23 Dec 2022Source
- Document5.pdf · uploaded 23 Dec 2022Source
- DocumentLayout.pdf · uploaded 17 Apr 2025Source
- DocumentBuilding Plan.pdf · uploaded 17 Apr 2025Source
Technical (Architect)
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 277/28(P)+30(P), 278/8C+8D+8E
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Unit types
- Office Type 1, Office Type 2, Office Type 3, Office Type 4, Office Type 5, Office Type 613 units in all
- Address
- Survey No 272/3(P), 277/28(P)+30(P), 278/8C+8D+8E, Off Baner Road, BanerPIN 411045
- Village
- Baner, Haveli taluka
- Land area for this project
- 4,888 sq m (52,617 sq ft)
- Permissible built-up area
- 18,995 sq m (2,04,458 sq ft)
- Sanctioned built-up area
- 18,994 sq m (2,04,449 sq ft)
- Recreational open space
- 510 sq m (5,485 sq ft)
- Designated bank account
- 85
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Survey No 272/3(P), 277/28(P)+30(P), 278/8C+8D+8E
Boundaries
- North
- S No 277P and 278P
- South
- S N0 272P and 277P
- East
- Road
- West
- 12M Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking13 units
3 of 13 units booked (23%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office Type 1 | 1,091.8 sq m · 11,752 sq ft | 1 | 1 |
| Office Type 2 | 1,250.33 sq m · 13,458 sq ft | 1 | 0 |
| Office Type 3 | 1,400.07 sq m · 15,070 sq ft | 7 | 2 |
| Office Type 4 | 946.4 sq m · 10,187 sq ft | 2 | 0 |
| Office Type 5 | 1,230.27 sq m · 13,243 sq ft | 1 | 0 |
| Office Type 6 | 1,252.27 sq m · 13,479 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals8
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | M.B. Chaudhari & Associates | — |
| Architect | Pritika Manjrekar | — |
| Chartered accountant | P. S. Athavale & Co | — |
| Chartered accountant | V A Dudhedia & Co | — |
| Engineer | JW Consultants LLP | — |
| Engineer | Suresh Thakchand Ghodekar | — |
| Other | Amar Builders and Promoters LLP | — |
| Other | S J Contracts Pvt Ltd | — |
Source: MahaRERA project page. Contact details are not shown.
Amar Delta One in numbers
Registered deals, summarised
Deedo has 6 registered documents at Amar Delta One, from Mar 2023 to Apr 2024: 3 sales, 1 leave and licence agreement, 2 mortgages. The median registered sale since Mar 2023 works out to about ₹16,300 per sq ft, at a median of ₹23.21 Cr a deal; 0% of sales were resales.
- What is the price per sq ft at Amar Delta One?
- The median registered sale since Mar 2023 works out to about ₹16,300 per sq ft, at a median of ₹23.21 Cr a deal; 0% of sales were resales.
- How many properties have been sold at Amar Delta One?
- 3 sales are registered at Amar Delta One.
- Are properties at Amar Delta One rented out?
- Yes: 1 leave and licence agreement is registered at Amar Delta One.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Amar Delta One by Deedo, last updated with deals registered in Apr 2024.
Latest deal · Rental · Apr 2024
₹20–50k / month