Skip to content
Commercial · 1 building · 14 unitsRERA P52100045387

Alpha C

Deedo IDDP-PUN-T8XN

MahaRERA shows it completed, after its date was pushed back 1 year; no MahaRERA orders on record; 36% of its units are booked.

Baner, Pune 411045 · Property rates in Baner · by Raichandani Constructions Private Limited · 0% of its projects kept the RERA date

DeliveryCompletedCompletion / occupancy certificate on MahaRERA · after a 1 yr extensionRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales36% booked5 of 14 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed, after its date was pushed back 1 year

  • This projectRegistered 18 May 2022, completion promised 30 Sep 2024, revised to 28 Sep 2025.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Sep 2026Alpha C · 401Resale417 sq ftView Resale, Sep 2026
Jun 2026Alpha C · 503Rental—View Rental, Jun 2026
May 2026Alpha C · 602Rental—View Rental, May 2026
Feb 2026Alpha C · 3Rental—View Rental, Feb 2026
Feb 2026Alpha C · 601Rental—View Rental, Feb 2026
Dec 2025Alpha C · 1Rental—View Rental, Dec 2025

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100045387
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004538718 May 202230 Sep 202428 Sep 2025Raichandani Constructions Private LimitedProject page
Documents110

2 documents held by Deedo, 108 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardFirm Pan Card.pdf · uploaded 1 Apr 2022Source

Legal

  • Declaration Form BForm B Builder_compressed.pdf · uploaded 13 Apr 2022Source
  • Legal Title reportTitile Report Alpha C.pdf · uploaded 7 May 2022Source

Migrated

  • 1 PAN CardFirm Pan Card.pdf · uploaded 1 Apr 2022Source
  • 1 Copy of Layout Approval (in case of layout)Building Plan 01 (1).pdf · uploaded 4 Apr 2022Source
  • 2 Copy of Layout Approval (in case of layout)Building Plan 02 (1).pdf · uploaded 4 Apr 2022Source
Show all 110 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan 01 (1).pdf · uploaded 4 Apr 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan 02 (1).pdf · uploaded 4 Apr 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentComm Certifictae.pdf · uploaded 4 Apr 2022Source
  • 1 CERSAI detailsCERSAI.pdf · uploaded 4 Apr 2022Source
  • 1 Proforma of Allotment letterAgreement Draft.pdf · uploaded 4 Apr 2022Source
  • 2 Proforma of Allotment letterAllotment Letter_Alpha C.pdf · uploaded 4 Apr 2022Source
  • 1 Details of encumbrancesEncumbrance.pdf · uploaded 13 Apr 2022Source
  • 1 Declaration about Commencement CertificateDeclration abour commercemnt.pdf · uploaded 13 Apr 2022Source
  • 1 Declaration in FORM BForm B Builder_compressed.pdf · uploaded 13 Apr 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate final signed.pdf · uploaded 21 Apr 2022Source
  • 1 Copy of the legal title reportTitile Report Alpha C.pdf · uploaded 7 May 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Raichandani (Alpha C) June 2022.pdf · uploaded 21 Jan 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Raichandani (Alpha C) Sept 2022.pdf · uploaded 21 Jan 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)alpha c (1)_arch_june.pdf · uploaded 28 Feb 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Alpha C _ENG _CERT.pdf · uploaded 28 Feb 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)alpha c 2_Eng_Cert.pdf · uploaded 28 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ALPHA C 1.pdf · uploaded 2 Mar 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Alpha C DEC 2022 FINAL_compressed (1).pdf · uploaded 16 Mar 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERT ALPHA-C Q-DEC.pdf · uploaded 8 Apr 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGREERING CERT ALPHA -C Q-DEC.pdf · uploaded 8 Apr 2023Source
  • 2 Details of encumbrancesAlpha C Mortgage Deed.pdf · uploaded 10 May 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Q4 2022-2023.pdf · uploaded 11 Aug 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate Q4 2022-2023.pdf · uploaded 11 Aug 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3.pdf · uploaded 11 Aug 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3.pdf · uploaded 11 Aug 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE Q1 2023-2024.pdf · uploaded 8 Sep 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Q1 2023-2024.pdf · uploaded 8 Sep 2023Source
  • 1 Disclosure of sold/ booked inventoryALPHA C Q4 SOLD- UNSOLD INVENTRY.PDF · uploaded 8 Sep 2023Source
  • 2 Disclosure of sold/ booked inventoryALPHA C Q1 SOLD- UNSOLD INVENTRY.PDF · uploaded 8 Sep 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q1 FY 2023-24 Alpha C_compressed.pdf · uploaded 8 Sep 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Alpha C Q1 CA certificate 2023-2024_compressed.pdf · uploaded 8 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A - ALPHA C.pdf · uploaded 9 Oct 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1- ALPHA C Q2.pdf · uploaded 10 Oct 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2- ALPHA C Q2.pdf · uploaded 20 Oct 2023Source
  • 3 Disclosure of sold/ booked inventoryPromoters Disclosure.pdf · uploaded 20 Oct 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Signed.pdf · uploaded 20 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 - ALPHA C.pdf · uploaded 26 Oct 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 q3 - alpha c.pdf · uploaded 8 Jan 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 q3 - alpha c.pdf · uploaded 8 Jan 2024Source
  • 4 Disclosure of sold/ booked inventorysold booked q3 - alpha c.pdf · uploaded 8 Jan 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)alpha c.pdf · uploaded 22 Jan 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)ALPHA C FORM 1 Q4 2023-2024.pdf · uploaded 20 Apr 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)ALPHA C FORM 2 Q4 2023-2024.pdf · uploaded 20 Apr 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)alpha c FORM 5 Q4 2023-2024.pdf · uploaded 24 Apr 2024Source
  • 5 Disclosure of sold/ booked inventoryalpha c sold unsold.pdf · uploaded 13 Jun 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)RCPL - ARCHITECT CERTIFICATE ALPHA C 2024-2025.pdf · uploaded 19 Jul 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Alpha C Form 2 Q1 2024-25_compressed.pdf · uploaded 20 Jul 2024Source
  • 6 Disclosure of sold/ booked inventoryAlpha C Sold Unsold Q1 2024-25.pdf · uploaded 20 Jul 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Alpha c form 3 Q1 2024-2025.pdf · uploaded 22 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Alpha C Form 1.pdf · uploaded 11 Nov 2024Source
  • 2 Disclosure of sold/ booked inventoryAlpha C Sold Unsold.pdf · uploaded 11 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Alpha C Q3 Form 1.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)GALAXY FORM 2 Q3 2024-2025.pdf · uploaded 22 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Alpha C Form 2 Q3.pdf · uploaded 23 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryalpha c sold - unsold Q3 2024-2025.pdf · uploaded 23 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)GALAXY Q3 FORM 3 2024-2025 S1.pdf · uploaded 30 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Alpha C_Dec 24 signed1.pdf · uploaded 30 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ALPHA C FORM 1 Q4 2024-2025.pdf · uploaded 20 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Alpha C form 3 Q4 2024-2025.pdf · uploaded 20 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Alpha C Form 2 Q4 2024-2025.pdf · uploaded 20 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryALPHA C SOLD - UNSOLD Q4 2024-2025.pdf · uploaded 20 Apr 2025Source
  • Withdrawal Update Form 1ALPHA C Q1 FORM 1 2025-2026.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1ALPHA C Q1 FORM 1 2025-2026.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1ALPHA C Q1 FORM 1 2025-2026.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1ALPHA C Q1 FORM 1 2025-2026.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1ALPHA C Q1 FORM 1 2025-2026.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1ALPHA C Q1 FORM 1 2025-2026.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2ALPHA C FORM 2 Q1 2025-2026_signed.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2ALPHA C FORM 2 Q1 2025-2026_signed.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2ALPHA C FORM 2 Q1 2025-2026_signed.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2ALPHA C FORM 2 Q1 2025-2026_signed.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2ALPHA C FORM 2 Q1 2025-2026_signed.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2ALPHA C FORM 2 Q1 2025-2026_signed.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3Form-3 Alpha C Jun-25 (1).pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3Form-3 Alpha C Jun-25 (1).pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3Form-3 Alpha C Jun-25 (1).pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3Form-3 Alpha C Jun-25 (1).pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3Form-3 Alpha C Jun-25 (1).pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3Form-3 Alpha C Jun-25 (1).pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1ALPHA C Q1 FORM 1 2025-2026.pdf · uploaded 29 Jul 2025Source
  • Withdrawal Update Form 2ALPHA C FORM 2 Q1 2025-2026_signed.pdf · uploaded 29 Jul 2025Source
  • Withdrawal Update Form 3Form-3 Alpha C Jun-25 (1).pdf · uploaded 29 Jul 2025Source
  • Withdrawal Update Form 1ALPHA C Q1 FORM 1 2025-2026.pdf · uploaded 1 Aug 2025Source
  • Withdrawal Update Form 2ALPHA C FORM 2 Q1 2025-2026_signed.pdf · uploaded 1 Aug 2025Source
  • Withdrawal Update Form 3Form-3 Alpha C Jun-25 (1).pdf · uploaded 1 Aug 2025Source
  • Occupational Certificate2025-07-31 17-34.pdf · uploaded 4 Aug 2025Source
  • Form 5 (FY 2024-2025)alpaha c form 5 2024-2025.pdf · uploaded 30 Sep 2025Source
  • Form 2A (FY 2024-2025)APLHA C FORM 2A.pdf · uploaded 17 Oct 2025Source

Technical

  • DocumentBuilding Plan 01 (1).pdf · uploaded 4 Apr 2022Source
  • DocumentBuilding Plan 02 (1).pdf · uploaded 4 Apr 2022Source
  • DocumentBuilding Plan 01 (1).pdf · uploaded 4 Apr 2022Source
  • DocumentBuilding Plan 02 (1).pdf · uploaded 4 Apr 2022Source
  • Document18 BANER-PLAN-01-02 DT 21-03-2025 01.pdf · uploaded 18 Sep 2025Source
  • Document02-02.pdf · uploaded 18 Sep 2025Source

Technical (Architect)

  • DocumentAlpha C Form 1.pdf · uploaded 11 Nov 2024Source
  • DocumentAlpha C Q3 Form 1.pdf · uploaded 20 Jan 2025Source
  • DocumentALPHA C FORM 1 Q4 2024-2025.pdf · uploaded 20 Apr 2025Source
  • DocumentALPHA C Q1 FORM 1 2025-2026.pdf · uploaded 28 Jul 2025Source

Technical (Engineer)

  • DocumentGALAXY FORM 2 Q3 2024-2025.pdf · uploaded 22 Jan 2025Source
  • DocumentAlpha C Form 2 Q3.pdf · uploaded 23 Jan 2025Source
  • DocumentAlpha C Form 2 Q4 2024-2025.pdf · uploaded 20 Apr 2025Source
  • DocumentALPHA C FORM 2 Q1 2025-2026_signed.pdf · uploaded 28 Jul 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 18/2 at Baner Pune, S No 18/1

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Office14 units in all
Address
S No 18/1, 18/2 at Baner Pune, Baner, PunePIN 411045
Village
Baner, Haveli taluka
Land area for this project
675 sq m (7,262 sq ft)
Permissible built-up area
3,339 sq m (35,946 sq ft)
Sanctioned built-up area
2,379 sq m (25,609 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

18/2 at Baner PuneS No 18/1

Land as published on MahaRERA's project page

S No 18/1, 18/2 at Baner Pune

Boundaries

North
By 24 Meter D P Road
South
By Survey Number 18 Private Plot
East
By Survey Number 18 Private Plot
West
By Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking14 units

5 of 14 units booked (36%), as the promoter reported to MahaRERA

Office · 14 units
TypeCarpet areaUnitsBooked
Office38.74 sq m · 417 sq ft53
Office64.95 sq m · 699 sq ft51
Office98.63 sq m · 1,062 sq ft41

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectJay Aeram & Associates—
Chartered accountantMilani Gattani & Co—
Chartered accountantPushpak Bagoti—
EngineerSiddharth Sawant Sawant—
OtherM K Enterprises—
OtherNarendra Patel—

Source: MahaRERA project page. Contact details are not shown.

Alpha C in numbers

Registered deals, summarised

Deedo has 6 registered documents at Alpha C, from Dec 2025 to Sep 2026: 1 sale, 5 leave and licence agreements.

How many properties have been sold at Alpha C?
1 sale is registered at Alpha C, 1 of them a resale.
Are properties at Alpha C rented out?
Yes: 5 leave and licence agreements are registered at Alpha C, at a median rent since Dec 2025 of about ₹72,000 a month with a deposit of about ₹2,50,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Alpha C by Deedo, last updated with deals registered in Sep 2026.

Latest deal · Resale · Sep 2026

₹1–1.5 Cr

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology