Kakkad Oneworld

Deedo IDDP-PUN-6KEG

Completion was pushed back 4 months, to Jan 2031; no MahaRERA orders on record; 2% of its units are booked.

Balewadi, Pune 411045 · Property rates in Balewadi · by Kakkad Erectors LLP

DeliveryExtended 4 moPromised Sep 2030 · now due Jan 2031RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales2% booked1 of 43 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jan 2031

  • This projectRegistered 14 Mar 2024, completion promised 30 Sep 2030, revised to 30 Jan 2031.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Jul 2026Kakkad Oneworld · C-1901/1902Rental—View Rental, Jul 2026
Jan 2026Kakkad Oneworld · 503Rental—View Rental, Jan 2026
Aug 2025Kakkad Oneworld · C-1901/1902Rental—View Rental, Aug 2025
Jun 2025Kakkad Oneworld · C-1901/1902Rental—View Rental, Jun 2025
Aug 2024Kakkad Oneworld · 503Rental—View Rental, Aug 2024

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100055312
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005531214 Mar 202430 Sep 203030 Jan 2031Kakkad Erectors LLPProject page
Documents136

1 document held by Deedo, 135 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardKakkad Erectors LLP PAN.pdf · uploaded 18 Nov 2023Source
  • Other – FinanceCA Certificate Kakkad One World.pdf · uploaded 21 Feb 2024Source

Legal

  • Declaration Form BAffidavit.PDF · uploaded 30 Nov 2023Source
  • Legal Title reportTitle report KE 1_17012024173939.PDF · uploaded 8 Feb 2024Source
  • Legal Title reportTitle report KE 2_17012024174030.PDF · uploaded 8 Feb 2024Source
  • Legal Title reportTitle report KE 3_17012024174125.PDF · uploaded 8 Feb 2024Source

Migrated

  • 1 PAN CardKakkad Erectors LLP PAN.pdf · uploaded 18 Nov 2023Source
Show all 136 documentsShow fewer documents

Migrated

  • 1 a Details of encumbrances concerned to FinanceENCUM.PDF · uploaded 18 Nov 2023Source
  • 1 b Details of encumbrances concerned to LegalENCUM.PDF · uploaded 18 Nov 2023Source
  • 1 CERSAI detailsCERSAI.PDF · uploaded 18 Nov 2023Source
  • 1 Proforma of Agreement for sale1 Proforma of Agreement for sale (5).pdf · uploaded 18 Nov 2023Source
  • 1 Proforma of Allotment letter1 Proforma of Allotment letter (3).pdf · uploaded 18 Nov 2023Source
  • 1 Deviation Report with respect to Allotment letterdev ALLO.PDF · uploaded 18 Nov 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDEV afs.PDF · uploaded 18 Nov 2023Source
  • 2 a Details of encumbrances concerned to FinanceLegal encumbrance.PDF · uploaded 23 Nov 2023Source
  • 2 b Details of encumbrances concerned to LegalLegal encumbrance.PDF · uploaded 23 Nov 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Anand kakkad.PDF · uploaded 23 Nov 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Amrish kakkad.PDF · uploaded 23 Nov 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Brijesh shah.PDF · uploaded 23 Nov 2023Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsAnnexture A Jayesh jain.PDF · uploaded 23 Nov 2023Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Kavita Bhimjiani.pdf · uploaded 23 Nov 2023Source
  • 6 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Rishi kakkad.PDF · uploaded 23 Nov 2023Source
  • 7 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Rupesh Bhimjiani.pdf · uploaded 23 Nov 2023Source
  • 1 Declaration in FORM BAffidavit.PDF · uploaded 30 Nov 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A_24012024145758.PDF · uploaded 24 Jan 2024Source
  • 1 Copy of Layout Approval (in case of layout)1-6.pdf · uploaded 25 Jan 2024Source
  • 1 Building Plan Approval / NA Order for plotted development1-6.pdf · uploaded 25 Jan 2024Source
  • 2 Building Plan Approval / NA Order for plotted development2-6.pdf · uploaded 25 Jan 2024Source
  • 3 Building Plan Approval / NA Order for plotted development3-6.pdf · uploaded 25 Jan 2024Source
  • 4 Building Plan Approval / NA Order for plotted development4-6.pdf · uploaded 25 Jan 2024Source
  • 5 Building Plan Approval / NA Order for plotted development5-6.pdf · uploaded 25 Jan 2024Source
  • 6 Building Plan Approval / NA Order for plotted development6-6.pdf · uploaded 25 Jan 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentKE CC 13 sept 23 (1).PDF · uploaded 25 Jan 2024Source
  • 1 Declaration about Commencement CertificateFormat d Rera oneworld_25012024114759 (1).PDF · uploaded 25 Jan 2024Source
  • 1 Copy of the legal title reportTitle report KE 1_17012024173939.PDF · uploaded 8 Feb 2024Source
  • 2 Copy of the legal title reportTitle report KE 2_17012024174030.PDF · uploaded 8 Feb 2024Source
  • 3 Copy of the legal title reportTitle report KE 3_17012024174125.PDF · uploaded 8 Feb 2024Source
  • 1 Other – FinanceCA Certificate Kakkad One World.pdf · uploaded 21 Feb 2024Source
  • 1 Other – TechnicalAnnexure A_21022024163544.PDF · uploaded 21 Feb 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Kakkad Erectors LLP.pdf · uploaded 28 Feb 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kakkad onewold form 1 march24.PDF · uploaded 22 Jun 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 march 24.PDF · uploaded 22 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form-2A March 24.PDF · uploaded 22 Jun 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of sold booked inventory march 24.PDF · uploaded 22 Jun 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 march 24_28012025174115.PDF · uploaded 29 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 june 24_28012025173928.PDF · uploaded 29 Jan 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 sept 24_28012025172517.PDF · uploaded 29 Jan 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 dec 24_28012025172151.PDF · uploaded 29 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure june 24_28012025181918.PDF · uploaded 29 Jan 2025Source
  • 2 Disclosure of sold/ booked inventoryDisclosure sept 24_28012025181942.PDF · uploaded 29 Jan 2025Source
  • 3 Disclosure of sold/ booked inventoryDisclosure dec 24_28012025181836.PDF · uploaded 29 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A june 24_28012025173849.PDF · uploaded 29 Jan 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A sept 24_28012025173746.PDF · uploaded 29 Jan 2025Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A dec 24_28012025172328.PDF · uploaded 29 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 march 24_30012025110923.PDF · uploaded 1 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 june 24_30012025111032.PDF · uploaded 1 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 sept 24_30012025111151.PDF · uploaded 1 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 dec 24_30012025111326.PDF · uploaded 1 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 march 2024_11022025181852.PDF · uploaded 11 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 kakkad Erectors llp march 31 2024_13032025120438.PDF · uploaded 17 Mar 2025Source
  • Form 5 (FY 2024-2025)Form 5 kakkad erectors llp 24-25.PDF · uploaded 27 Sep 2025Source
  • Form 12 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 11 Dec 2025Source
  • Form 32 CA Certificate on Project Cost & Fund withdrawal (Form 3) (2).pdf · uploaded 11 Dec 2025Source
  • Disclosure of Sold and Booked Inventory1 Disclosure of sold_ booked inventory (3).pdf · uploaded 11 Dec 2025Source
  • Others1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (2).pdf · uploaded 11 Dec 2025Source
  • Form 22 Engineer’s Certificate on Cost Incurred on Project (Form 2) (3).pdf · uploaded 11 Dec 2025Source
  • Form 13 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 11 Dec 2025Source
  • Form 23 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf · uploaded 11 Dec 2025Source
  • Form 3Form 3 June 2024 Kakkad Oneworld.PDF · uploaded 11 Dec 2025Source
  • Disclosure of Sold and Booked Inventory2 Disclosure of sold_ booked inventory (3).pdf · uploaded 11 Dec 2025Source
  • Others2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (2).pdf · uploaded 11 Dec 2025Source
  • Form 14 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 11 Dec 2025Source
  • Form 24 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf · uploaded 11 Dec 2025Source
  • Form 3Form 3 Sept 2024 Kakkad Oneworld.PDF · uploaded 11 Dec 2025Source
  • Disclosure of Sold and Booked Inventory3 Disclosure of sold_ booked inventory (2).pdf · uploaded 11 Dec 2025Source
  • Others3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (2).pdf · uploaded 11 Dec 2025Source
  • Form 1Form 1 dec 24 Kakkad oneworld.PDF · uploaded 11 Dec 2025Source
  • Form 25 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 11 Dec 2025Source
  • Form 3Form 3 Dec 2024.PDF · uploaded 11 Dec 2025Source
  • Disclosure of Sold and Booked Inventory4 Disclosure of sold_ booked inventory (2).pdf · uploaded 11 Dec 2025Source
  • Others4 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (2).pdf · uploaded 11 Dec 2025Source
  • Form 1Form 1 March25 Kakkad Oneworld.PDF · uploaded 11 Dec 2025Source
  • Form 2Form 2 march 25 Kakkad Oneworld.PDF · uploaded 11 Dec 2025Source
  • Form 3From3 march 31 2025.PDF · uploaded 11 Dec 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure inventory 31 03 2025_11122025141033.PDF · uploaded 11 Dec 2025Source
  • OthersForm 2A march 25 Kakkad Oneworld.PDF · uploaded 11 Dec 2025Source
  • Form 1Form 1 june 25 Kakkad Oneworld.PDF · uploaded 11 Dec 2025Source
  • Form 2Form 2 june 25 Kakkad Oneworld.PDF · uploaded 11 Dec 2025Source
  • Form 3From3 june 30 2025.PDF · uploaded 11 Dec 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure inventory 30 06 2025_11122025140927.PDF · uploaded 11 Dec 2025Source
  • OthersForm 2A June 25 Kakkad Oneworld.pdf · uploaded 11 Dec 2025Source
  • Form 1Form 1 Kakkad Oneworld Oct 25.pdf · uploaded 11 Dec 2025Source
  • Form 2Form 2 Kakkad Oneworld 01 10 2025_29112025122402.PDF · uploaded 11 Dec 2025Source
  • Form 3From3 september30 2025.PDF · uploaded 11 Dec 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure inventory 30 09 2025_11122025141002.PDF · uploaded 11 Dec 2025Source
  • OthersForm 2A sept 25_08122025175528.PDF · uploaded 11 Dec 2025Source
  • Form 5 (FY 2023-2024)Form 5 march 2024_11022025181852.PDF · uploaded 11 Dec 2025Source
  • Form 1Form 1 dec 26_08012026142231.PDF · uploaded 29 Jan 2026Source
  • Form 2Form 2 dec 26.PDF · uploaded 29 Jan 2026Source
  • Form 3Form 3_23012026123516.PDF · uploaded 29 Jan 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold_27012026173504.PDF · uploaded 29 Jan 2026Source
  • OthersForm 2A dec 25_27012026173412.PDF · uploaded 29 Jan 2026Source
  • Withdrawal Update Form 1Form 1 march 26 Kakkad Oneworld.PDF · uploaded 15 May 2026Source
  • Withdrawal Update Form 2Form 2 March 26 Kakkad Oneworld.PDF · uploaded 15 May 2026Source
  • Withdrawal Update Form 3Form 3 March 26 Kakkad Oneworld.PDF · uploaded 15 May 2026Source
  • Form 2A (FY 2025-2026)Form 2A 2025 26 One World_29062026162350.PDF · uploaded 29 Jun 2026Source
  • Withdrawal Update Form 1Form 1 kakkad oneworld june 26.PDF · uploaded 14 Aug 2026Source
  • Withdrawal Update Form 2Form 2 K Oneworld june 26.PDF · uploaded 14 Aug 2026Source
  • Withdrawal Update Form 3Form 3 kakkad oneworld june 26.PDF · uploaded 14 Aug 2026Source
  • Form 5 (FY 2025-2026)Form 5 Kakkad oneworld.PDF · uploaded 19 Aug 2026Source

Technical

  • Document1-6.pdf · uploaded 25 Jan 2024Source
  • Document1-6.pdf · uploaded 25 Jan 2024Source
  • Document2-6.pdf · uploaded 25 Jan 2024Source
  • Document3-6.pdf · uploaded 25 Jan 2024Source
  • Document4-6.pdf · uploaded 25 Jan 2024Source
  • Document5-6.pdf · uploaded 25 Jan 2024Source
  • Document6-6.pdf · uploaded 25 Jan 2024Source
  • Other – TechnicalAnnexure A_21022024163544.PDF · uploaded 21 Feb 2024Source
  • Document1-06.pdf · uploaded 29 Jan 2026Source
  • Document1-06.pdf · uploaded 29 Jan 2026Source
  • Document2-6.pdf · uploaded 29 Jan 2026Source
  • Document3-6.pdf · uploaded 29 Jan 2026Source
  • Document4-6.pdf · uploaded 29 Jan 2026Source
  • Document5-06.pdf · uploaded 29 Jan 2026Source
  • Document6-6.pdf · uploaded 29 Jan 2026Source

Technical (Architect)

  • DocumentForm 1 march 24_30012025110923.PDF · uploaded 1 Feb 2025Source
  • DocumentForm 1 june 24_30012025111032.PDF · uploaded 1 Feb 2025Source
  • DocumentForm 1 sept 24_30012025111151.PDF · uploaded 1 Feb 2025Source
  • DocumentForm 1 dec 24_30012025111326.PDF · uploaded 1 Feb 2025Source
  • DocumentForm 1 kakkad oneworld june 26.PDF · uploaded 14 Aug 2026Source

Technical (Engineer)

  • DocumentForm 2 march 24_28012025174115.PDF · uploaded 29 Jan 2025Source
  • DocumentForm 2 june 24_28012025173928.PDF · uploaded 29 Jan 2025Source
  • DocumentForm 2 sept 24_28012025172517.PDF · uploaded 29 Jan 2025Source
  • DocumentForm 2 dec 24_28012025172151.PDF · uploaded 29 Jan 2025Source
  • DocumentForm 2 K Oneworld june 26.PDF · uploaded 14 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Sr. No. 6/7+6/8+11/1(P)+11/6+11/7 BALEWADI

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
—43 units in all
Address
Sr. No. 6/7+6/8+11/1(P)+11/6+11/7 BALEWADI, Balewadi, BalewadiPIN 411045
Village
Balewadi, Haveli taluka
Land area for this project
9,356 sq m (1,00,702 sq ft)
Approved layout area
9,850 sq m (1,06,020 sq ft)
Permissible built-up area
18,576 sq m (1,99,946 sq ft)
Sanctioned built-up area
18,576 sq m (1,99,946 sq ft)
Recreational open space
1,401 sq m (15,080 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

Sr. No. 6/7+6/8+11/1(P)+11/6+11/7 BALEWADI

Land as published on MahaRERA's project page

Sr. No. 6/7+6/8+11/1(P)+11/6+11/7 BALEWADI

Boundaries

North
Sr No 11-1 P
South
Sr No 12
East
Sr No 11 P
West
24 Mtr DP Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking43 units

43 units registered

— · 43 units
TypeCarpet areaUnits
——43

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals8

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDSP Design Associates Pvt Ltd—
ArchitectKetan Chavan—
ArchitectManoj Tatooskar—
Chartered accountantC V Deshpande—
Chartered accountantKiran Kanani—
Chartered accountantLathi and Tapdiya—
EngineerDelcon Structure Consultant Pvt Ltd—
EngineerSavan Padmawar—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Balewadi

All 1,319 projects in Balewadi · Compare Kakkad Oneworld with another project

Kakkad Oneworld in numbers

Registered deals, summarised

Deedo has 5 registered documents at Kakkad Oneworld, from Aug 2024 to Jul 2026: 5 leave and licence agreements.

Are properties at Kakkad Oneworld rented out?
Yes: 5 leave and licence agreements are registered at Kakkad Oneworld, at a median rent since Aug 2024 of about ₹39,000 a month with a deposit of about ₹80,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Kakkad Oneworld by Deedo, last updated with deals registered in Jul 2026.

Latest deal · Rental · Jul 2026

₹20–50k / month

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology