Skip to content
Commercial · 2 buildings · 7 unitsRERA P52100046615

Imperial Mist

Deedo IDDP-PUN-GB3Y

MahaRERA shows it completed; no MahaRERA orders on record.

Balewadi, Pune 411045 · Property rates in Balewadi · by Imperial Housing

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readPrice₹4,850 /sq ft55.5% below Balewadi · 4 registered sales

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 25 Aug 2022, completion promised 31 Dec 2025.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

All 37 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Aug 2024Imperial Mist · 301Resale784 sq ftView Resale, Aug 2024
Aug 2021Unit 401Resale1,100 sq ftView Resale, Aug 2021
Aug 2021Imperial MistTitle transfer—View Title transfer, Aug 2021
Aug 2021Unit 401Primary sale1,100 sq ftView Primary sale, Aug 2021
Oct 2026Imperial Mist · 7001Other4,717 sq ftView Other, Oct 2026
Oct 2026Imperial Mist · 6001Other4,717 sq ftView Other, Oct 2026
Oct 2026Imperial Mist · 5001Other4,717 sq ftView Other, Oct 2026
Oct 2026Imperial Mist · 4001Other4,717 sq ftView Other, Oct 2026
Oct 2026Imperial Mist · 3001Other4,717 sq ftView Other, Oct 2026
Oct 2026Imperial Mist · 2001Other4,717 sq ftView Other, Oct 2026

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100046615
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004661525 Aug 202231 Dec 202531 Dec 2025Imperial HousingProject page
Documents146

1 document held by Deedo, 145 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardImperial Housing Pan Card.pdf · uploaded 8 Jul 2022Source

Legal

  • Declaration Form BAFFIDEVITE.pdf · uploaded 8 Jul 2022Source
  • Legal Title reportSTR-Timir Mehta-Balewadi-23-6-A_compressed.pdf · uploaded 8 Aug 2022Source

Migrated

  • 1 PAN CardImperial Housing Pan Card.pdf · uploaded 8 Jul 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentApproved plan 1_11zon.pdf · uploaded 8 Jul 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentApproved plan 2_11zon.pdf · uploaded 8 Jul 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 8 Jul 2022Source
Show all 146 documentsShow fewer documents

Migrated

  • 1 Declaration about Commencement CertificateDeclaration About Commencment Certificate Rera.pdf · uploaded 8 Jul 2022Source
  • 1 Declaration in FORM BAFFIDEVITE.pdf · uploaded 8 Jul 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2_compressed.pdf · uploaded 22 Jul 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form2A.pdf · uploaded 22 Jul 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)DocScanner Jul 22, 2022 4-49 PM_compressed.pdf · uploaded 23 Jul 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200242948286_For_Asset_Based_Search_23_07_2022_15_09_07_470.pdf · uploaded 23 Jul 2022Source
  • 1 Copy of Layout Approval (in case of layout)2 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 25 Jul 2022Source
  • 1 a Details of encumbrances concerned to FinanceFin Imp.pdf · uploaded 3 Aug 2022Source
  • 1 b Details of encumbrances concerned to LegalLegal Imp.pdf · uploaded 3 Aug 2022Source
  • 1 Proforma of Allotment letterAFS Imperial (1).pdf · uploaded 3 Aug 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameImp Bank Dec.pdf · uploaded 3 Aug 2022Source
  • 1 Deviation Report with respect to model copy of AgreementImp Dev AFS.pdf · uploaded 3 Aug 2022Source
  • 2 Proforma of Allotment letterAllotment Imperial (1).pdf · uploaded 6 Aug 2022Source
  • 1 Deviation Report with respect to Allotment letterImperial Deviation Allotment Flat.pdf · uploaded 6 Aug 2022Source
  • 1 Copy of the legal title reportSTR-Timir Mehta-Balewadi-23-6-A_compressed.pdf · uploaded 8 Aug 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Imperial CA.pdf · uploaded 9 Aug 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate (1).pdf · uploaded 19 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineer Certificate - Ravikant Chavhan.pdf · uploaded 19 Jan 2023Source
  • 1 Disclosure of sold/ booked inventoryImperial - Unsold Inventory.pdf · uploaded 19 Jan 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA - Certificate Mist_compressed.pdf · uploaded 19 Jan 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - MIST.pdf · uploaded 27 Apr 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2.pdf · uploaded 27 Apr 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineer Certificate Form 2A.pdf · uploaded 27 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)C A Certificate - Imperial.pdf · uploaded 27 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) (8).pdf · uploaded 11 Jul 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect Certificate form 1.pdf · uploaded 15 Jul 2023Source
  • 2 Disclosure of sold/ booked inventoryInventory.pdf · uploaded 15 Jul 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (2)_compressed.pdf · uploaded 18 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Annexure C.pdf · uploaded 18 Jul 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate (1) (1)_compressed.pdf · uploaded 18 Jul 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1.pdf · uploaded 17 Oct 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1.pdf · uploaded 17 Oct 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 17 Oct 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate _11zon.pdf · uploaded 17 Oct 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Engineer quality Assurance Certificate .pdf · uploaded 17 Oct 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Engineer quality Assurance Certificate .pdf · uploaded 17 Oct 2023Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 17 Oct 2023Source
  • 4 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 17 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 17 Oct 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 C A Certificate _11zon.pdf · uploaded 17 Oct 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 C A Certificate .pdf · uploaded 17 Oct 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Form 1 Architect Certificte_compressed.pdf · uploaded 15 Jan 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Form 2 Enginee Certificate_compressed.pdf · uploaded 15 Jan 2024Source
  • 5 Disclosure of sold/ booked inventory5 Sold Unsold Inventory.pdf · uploaded 15 Jan 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 Form 3 C A Certificate_compressed.pdf · uploaded 15 Jan 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate _compressed.pdf · uploaded 14 Apr 2024Source
  • 6 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Inventory .pdf · uploaded 14 Apr 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 C A Certificate _organized_compressed.pdf · uploaded 14 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate _compressed (1).pdf · uploaded 17 Apr 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 C A Certificate _compressed.pdf · uploaded 17 Apr 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Imperial June Engg.pdf · uploaded 15 Jul 2024Source
  • 7 Disclosure of sold/ booked inventoryImperial June Inventory.pdf · uploaded 15 Jul 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Imperial June CA.pdf · uploaded 15 Jul 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architects Certificate_20240717_0001.pdf · uploaded 18 Jul 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate mist.pdf · uploaded 17 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 C A Certificate Mist.pdf · uploaded 17 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Mist.pdf · uploaded 17 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorySold Unsold Inventory mist.pdf · uploaded 17 Oct 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A - Promoter Letterhead Imperial Housing.pdf · uploaded 18 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Imperial Mist Form 5 2324 (1).pdf · uploaded 19 Oct 2024Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Account Final Imperial.pdf · uploaded 24 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold .pdf · uploaded 20 Jan 2025Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 30 Jul 2026Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 30 Jul 2026Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 30 Jul 2026Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 30 Jul 2026Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 30 Jul 2026Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 30 Jul 2026Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 30 Jul 2026Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 30 Jul 2026Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 30 Jul 2026Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 30 Jul 2026Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 30 Jul 2026Source
  • Form 2A (FY 2022-2023)Form 2A 2223.pdf · uploaded 30 Jul 2026Source
  • Form 2A (FY 2023-2024)Form 2A 2324.pdf · uploaded 30 Jul 2026Source
  • Form 2A (FY 2024-2025)Form 2A 2425.pdf · uploaded 30 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A 2526.pdf · uploaded 30 Jul 2026Source
  • Form 5 (FY 2022-2023)Form 5 2223.pdf · uploaded 30 Jul 2026Source
  • Form 5 (FY 2023-2024)Form 5 2324.pdf · uploaded 30 Jul 2026Source
  • Form 5 (FY 2024-2025)Form 5 2425.pdf · uploaded 30 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5 2526.pdf · uploaded 30 Jul 2026Source
  • Occupational CertificateOC.pdf · uploaded 5 Aug 2026Source

Technical

  • DocumentApproved plan 1_11zon.pdf · uploaded 8 Jul 2022Source
  • DocumentApproved plan 2_11zon.pdf · uploaded 8 Jul 2022Source
  • Document2 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 25 Jul 2022Source

Technical (Architect)

  • DocumentForm 1 Architect Certificate mist.pdf · uploaded 17 Oct 2024Source
  • DocumentForm 1.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 1.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 1.pdf · uploaded 30 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 Engineer Certificate Mist.pdf · uploaded 17 Oct 2024Source
  • DocumentForm 2.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 2.pdf · uploaded 30 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 23/6B, S. NO. 23/6A

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Office space7 units in all
Address
S. No. 23/6a & 23/6b, Balewadi, Pune 411045, Pune, BalewadiPIN 411045
Village
Balewadi, Haveli taluka
Land area for this project
1,210 sq m (13,023 sq ft)
Permissible built-up area
3,469 sq m (37,338 sq ft)
Sanctioned built-up area
3,469 sq m (37,338 sq ft)
Recreational open space
0 sq m (0 sq ft)
Designated bank account
159
Developed in phases
No
Also registered as
Imperiyal Mist Apartaments Kandominiyam, इम्पेरियल मिस्ट अपार्टमेंट्स कंडोमिनियम, Imperiyal Mist Apartments Condominium

Survey, CTS, gat or plot numbers

23/6BS. NO. 23/6A

Land as published on MahaRERA's project page

S. NO. 23/6A & 23/6B, BALEWADI, PUNE 411045

Boundaries

North
Road
South
Plot
East
Road
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking7 units

0 of 7 units booked (0%), as the promoter reported to MahaRERA

Office space · 7 units
TypeCarpet areaUnitsBooked
Office space386.48 sq m · 4,160 sq ft70

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals2

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNarsing N Pawar—
EngineerRajnikant Harish Chauhan—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Balewadi

All 1,319 projects in Balewadi · Compare Imperial Mist with another project

Imperial Mist in numbers

Registered deals, summarised

Deedo has 37 registered documents at Imperial Mist, from Mar 2015 to Oct 2026: 4 sales, 5 leave and licence agreements, 14 mortgages. The median registered sale since Mar 2015 works out to about ₹4,900 per sq ft, at a median of ₹53 L a deal; 50% of sales were resales.

What is the price per sq ft at Imperial Mist?
The median registered sale since Mar 2015 works out to about ₹4,900 per sq ft, at a median of ₹53 L a deal; 50% of sales were resales.
How many properties have been sold at Imperial Mist?
4 sales are registered at Imperial Mist, 2 of them resales.
Are properties at Imperial Mist rented out?
Yes: 5 leave and licence agreements are registered at Imperial Mist, at a median rent since Mar 2015 of about ₹24,000 a month with a deposit of about ₹63,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Imperial Mist by Deedo, last updated with deals registered in Oct 2026.

Latest deal · Resale · Aug 2024

₹1–1.5 Cr

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology