Skip to content
Commercial · 25 buildings · 21 unitsRERA P52100004334

Dongar MAATHA

Deedo IDDP-PUN-CH56

Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 100% of its units are booked.

Agalambe, Pune 411023 · by Starlight Projects

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales100% booked21 of 21 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 9 Aug 2017, completion promised 30 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

25 buildings

Open a building to see every flat, floor by floor.

Show all 25 buildingsShow fewer buildings

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100004334
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000043349 Aug 201730 Dec 202630 Apr 2027M/s Starlight ProjectsProject page
Documents123

1 document held by Deedo, 122 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan card.pdf · uploaded 28 Jul 2017Source

Legal

  • Declaration Form BForm B.pdf · uploaded 28 Jul 2017Source
  • Legal Title reportTSR 1.pdf · uploaded 28 Jul 2017Source
  • Legal Title reportTSR 2.pdf · uploaded 28 Jul 2017Source

Migrated

  • 1 PAN CardPan card.pdf · uploaded 28 Jul 2017Source
  • 1 Copy of the legal title reportTSR 1.pdf · uploaded 28 Jul 2017Source
  • 2 Copy of the legal title reportTSR 2.pdf · uploaded 28 Jul 2017Source
Show all 123 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)Approved layout.pdf · uploaded 28 Jul 2017Source
  • 1 Building Plan Approval (IOD)Building plans 1.pdf · uploaded 28 Jul 2017Source
  • 2 Building Plan Approval (IOD)Building plans 2.pdf · uploaded 28 Jul 2017Source
  • 3 Building Plan Approval (IOD)building plans 3.pdf · uploaded 28 Jul 2017Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 28 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEERS CERTIFICATE Form 2.pdf · uploaded 28 Jul 2017Source
  • 1 Certificates of CA (Form 3)Form - 3 - CA Certificate.pdf · uploaded 28 Jul 2017Source
  • 1 Proforma of Allotment letterAgreement for loading on RERA.pdf · uploaded 28 Jul 2017Source
  • 1 Details of encumbrancesNEC.pdf · uploaded 29 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentNA Order 1.pdf · uploaded 29 Jul 2017Source
  • 2 Commencement Certificates / NA Order for plotted developmentNA ORDER 2.pdf · uploaded 29 Jul 2017Source
  • 3 Commencement Certificates / NA Order for plotted developmentNA Order 3.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH 1.pdf · uploaded 29 Jul 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH 2.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of CA (Form 5)Form - 3 - CA Certificate.pdf · uploaded 29 Jul 2017Source
  • 2 Certificates of CA (Form 3)Form 3 CA Certificate 31-03-2018.pdf · uploaded 3 May 2023Source
  • 3 Certificates of CA (Form 3)Form 3 CA Certificate 31-03-2019.pdf · uploaded 3 May 2023Source
  • 4 Certificates of CA (Form 3)Form 3 CA Certificate 31-03-2020.pdf · uploaded 3 May 2023Source
  • 5 Certificates of CA (Form 3)Form 3 CA Certificate 31-03-2021.pdf · uploaded 3 May 2023Source
  • 6 Certificates of CA (Form 3)Form 3 CA Certificate 31-12-2021.pdf · uploaded 3 May 2023Source
  • 7 Certificates of CA (Form 3)Form 3 CA Certificate 31-03-2022.pdf · uploaded 3 May 2023Source
  • 8 Certificates of CA (Form 3)Form 3 CA Certificate 30-08-2022.pdf · uploaded 3 May 2023Source
  • 9 Certificates of CA (Form 3)Form 3 CA Certificate 30-09-2022.pdf · uploaded 3 May 2023Source
  • 10 Certificates of CA (Form 3)Form 3 CA Certificate 31-12-2022.pdf · uploaded 3 May 2023Source
  • 11 Certificates of CA (Form 3)Form 3 CA Certificate 31-03-2023.pdf · uploaded 3 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 2017-18.pdf · uploaded 3 May 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)form 5 2018-19 Dongarmatha.pdf · uploaded 6 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 2019-20 Dongarmatha.pdf · uploaded 6 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 2020-21 Dongarmatha.pdf · uploaded 6 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5- 2021-22 Dongarmatha.pdf · uploaded 6 May 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5- 2022-23 Dongarmatha.pdf · uploaded 6 May 2023Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 31-03-2018-1.pdf · uploaded 10 May 2023Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 31-03-2019-2.pdf · uploaded 10 May 2023Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 31-03-2020-3.pdf · uploaded 10 May 2023Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 31-03-2021-4.pdf · uploaded 10 May 2023Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 31-12-2021-5.pdf · uploaded 10 May 2023Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 31-03-2022-6.pdf · uploaded 10 May 2023Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 30-06-2022-7.pdf · uploaded 10 May 2023Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 30-09-2022-8.pdf · uploaded 10 May 2023Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 31-12-2022-9.pdf · uploaded 10 May 2023Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 31-03-2023-10.pdf · uploaded 10 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineers certificate --2019- 20.pdf · uploaded 12 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineers certificate - 2020-21.pdf · uploaded 12 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineers certificate - 2021-22.pdf · uploaded 12 May 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineers Certificate - 2022-23.pdf · uploaded 12 May 2023Source
  • 1 Disclosure of sold/ booked inventorysold unsold inventory as on 31-03-2023.pdf · uploaded 25 May 2023Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Archtect Certificate 31-03-2018.pdf · uploaded 30 May 2023Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Archtect Certificate 31-03-2019.pdf · uploaded 30 May 2023Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Archtect Certificate 31-03-2020.pdf · uploaded 30 May 2023Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Archtect Certificate 21-12-2021.pdf · uploaded 30 May 2023Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Archtect Certificate 31-03-2022.pdf · uploaded 30 May 2023Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Archtect Certificate 30-06-2022.pdf · uploaded 30 May 2023Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 Architect Certificate 31-09-2022.pdf · uploaded 30 May 2023Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Archtect Certificate 31-12-2022.pdf · uploaded 30 May 2023Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate 31-03-2023.pdf · uploaded 30 May 2023Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate 31-03-2023-1.pdf · uploaded 30 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineers Certificate - 2022-23.pdf · uploaded 7 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5-2022-23 Dongarmatha.pdf · uploaded 7 Jul 2023Source
  • 12 Certificates of CA (Form 3)Form 3 CA Certificate 30-06-2023.pdf · uploaded 1 Aug 2023Source
  • 13 Certificates of CA (Form 3)Form 3 CA Certificate 30-06-2023.pdf · uploaded 4 Aug 2023Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 30-06-2023-11.pdf · uploaded 10 Aug 2023Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Adobe Scan Oct 18, 2023.pdf · uploaded 18 Oct 2023Source
  • 14 Certificates of CA (Form 3)dm FORM 3_organized_compressed.pdf · uploaded 20 Oct 2023Source
  • 2 Certificates of CA (Form 3)CA CERTIFICATE (9).pdf · uploaded 9 Oct 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Sept.pdf · uploaded 9 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Sold Inventary.pdf · uploaded 10 Oct 2024Source
  • 3 Certificates of CA (Form 3)CA CERT SEPT (3).pdf · uploaded 21 Oct 2024Source
  • 3 Disclosure of sold/ booked inventorySold_Unsold Inventary Starlight Projects.pdf · uploaded 13 Nov 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH CERT SEPT.pdf · uploaded 15 Nov 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE SEPT .pdf · uploaded 18 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 23-24 (3).pdf · uploaded 25 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 2 Dec 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold unsold Inventory.pdf · uploaded 15 Jan 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect's Certificate (1).pdf · uploaded 17 Jan 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer's Certificarte.pdf · uploaded 17 Jan 2025Source
  • 1 Certificates of CA (Form 3)Other papers (1).pdf · uploaded 20 Jan 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate.pdf · uploaded 13 May 2025Source
  • 1 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 13 May 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate 31-03-2025.pdf · uploaded 13 May 2025Source
  • 1 Disclosure of sold/ booked inventorySoldUnsold Inventary31-03-2025.pdf · uploaded 13 May 2025Source
  • Withdrawal Update Form 1Form no1 Architectu0027s Certificate 30-06-2025_.pdf · uploaded 11 Sep 2025Source
  • Withdrawal Update Form 2Form 2 Engineeru0027s Certificate 30-06-2025.pdf · uploaded 11 Sep 2025Source
  • Withdrawal Update Form 3FORM 3 CA CERTIFICATE 30-06-2025.pdf · uploaded 11 Sep 2025Source
  • Form 5 (FY 2024-2025)Form 5 (3).pdf · uploaded 6 Oct 2025Source
  • Withdrawal Update Form 1Adobe Scan 31 Oct 2025.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 2Annexure B-Engineeru0027s certificate.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 3Form no-03-C-A-Certificate.pdf · uploaded 31 Oct 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 24 Apr 2026Source
  • Form 5 (FY 2017-2018)Form 5_2017-18.pdf · uploaded 1 Jun 2026Source
  • Form 5 (FY 2018-2019)form 5_2018-19.pdf · uploaded 1 Jun 2026Source
  • Form 5 (FY 2019-2020)Form 5_2019-20.pdf · uploaded 1 Jun 2026Source
  • Form 5 (FY 2020-2021)Form 5_2020-21.pdf · uploaded 1 Jun 2026Source
  • Form 5 (FY 2021-2022)Form 5- 2021-22 Dongarmatha.pdf · uploaded 1 Jun 2026Source
  • Withdrawal Update Form 1FORM 1 fINAL.pdf · uploaded 5 Aug 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 5 Aug 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 5 Aug 2026Source
  • Form 5 (FY 2022-2023)Form 5-2022-23 Dongarmatha.pdf · uploaded 22 Sep 2026Source

Technical

  • Documentbuilding plans 3.pdf · uploaded 28 Jul 2017Source
  • DocumentBuilding plans 1.pdf · uploaded 28 Jul 2017Source
  • DocumentBuilding plans 2.pdf · uploaded 28 Jul 2017Source
  • DocumentApproved layout.pdf · uploaded 28 Jul 2017Source

Technical (Architect)

  • DocumentARCH CERT SEPT.pdf · uploaded 15 Nov 2024Source
  • DocumentArchitect's Certificate (1).pdf · uploaded 17 Jan 2025Source
  • DocumentArchitects Certificate.pdf · uploaded 13 May 2025Source
  • DocumentFORM 1 fINAL.pdf · uploaded 5 Aug 2026Source

Technical (Engineer)

  • DocumentEngineer Certificate Sept.pdf · uploaded 9 Oct 2024Source
  • DocumentENGINEER CERTIFICATE SEPT .pdf · uploaded 18 Nov 2024Source
  • DocumentEngineer's Certificarte.pdf · uploaded 17 Jan 2025Source
  • DocumentEngineers Certificate 31-03-2025.pdf · uploaded 13 May 2025Source
  • DocumentFORM 2.pdf · uploaded 5 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 106, 77

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Plots, Plot, A, B1, B2, plot, C221 units in all
Address
Gat No 75, 77, 78, 79, 80, 81, 82, And 106, PunePIN 411023
Village
Agalambe, Haveli taluka
Land area for this project
40,902 sq m (4,40,260 sq ft)
Permissible built-up area
1,400 sq m (15,069 sq ft)
Sanctioned built-up area
1,400 sq m (15,069 sq ft)
Designated bank account
85
Developed in phases
Yes

Survey, CTS, gat or plot numbers

106777879808182Gat No 75

Land as published on MahaRERA's project page

Gat No 75,77,78,79,80,81,82,And 106

Boundaries

North
Land With in 150 mtr from adjnoining layout
South
Gat no 106
East
Kudaje Village Boundry
West
Gat No 83

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking21 units

21 of 21 units booked (100%), as the promoter reported to MahaRERA

Plots · 1 unitPlot · 12 unitsA · 2 unitsB1 · 1 unitB2 · 3 unitsplot · 1 unitC2 · 1 unit
BuildingTypeCarpet areaUnitsBooked
Unit 1Plots39.04 sq m · 420 sq ft11
Unit 10Plot88.77 sq m · 956 sq ft11
Unit 11A60.9 sq m · 656 sq ft11
Unit 12Plot83.69 sq m · 901 sq ft11
Unit 13A60.9 sq m · 656 sq ft11
Unit 14Plot76.54 sq m · 824 sq ft11
Unit 15Plot—00
Unit 16Plot—00
Show all 25 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Unit 17B189.98 sq m · 969 sq ft11
Unit 18B239.04 sq m · 420 sq ft11
Unit 19B253.04 sq m · 571 sq ft11
Unit 2Plot75.26 sq m · 810 sq ft11
Unit 20B264.08 sq m · 690 sq ft11
Unit 21Plot—00
Unit 22Plot37.3 sq m · 401 sq ft11
Unit 23Plot39.04 sq m · 420 sq ft11
Unit 24Plot39.04 sq m · 420 sq ft11
Unit 25Plot74.47 sq m · 802 sq ft11
Unit 3Plot64.04 sq m · 689 sq ft11
Unit 4Plot75.26 sq m · 810 sq ft11
Unit 5plot75.26 sq m · 810 sq ft11
Unit 6Plot75.26 sq m · 810 sq ft11
Unit 7Plot110 sq m · 1,184 sq ft11
Unit 8Plot—00
Unit 9C2115 sq m · 1,238 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDeshpande Dixit & Associates—
ArchitectMangesh Gotal—
EngineerHanumant M Waghmode—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology