Sai Avenue
Deedo IDDP-PAL-HAEACompletion was pushed back 4 months, to Mar 2029; no MahaRERA orders on record; 38% of its units are booked.
Chandrapada, Palghar 401208 · by Shabbir Kasamali Kachwala
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Mar 2029
- This projectRegistered 21 Apr 2023, completion promised 12 Nov 2028, revised to 12 Mar 2029.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Residential Bldg Wing A15 floors · 114 units4% booked
- Residential Bldg Wing B14 floors · 95 units40% booked
- Residential Bldg Wing C20 floors · 133 units65% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP99000050553
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P99000050553 | 21 Apr 2023 | 12 Nov 2028 | 12 Mar 2029 | Shabbir Kasamali Kachwala | Project page |
Documents154
1 document held by Deedo, 153 filings listed on MahaRERA's project page
Finance
- PAN CardShabbirsir PAN.pdf · uploaded 23 Feb 2023Source
Legal
Migrated
- 1 PAN CardShabbirsir PAN.pdf · uploaded 23 Feb 2023Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan_reduced.pdf · uploaded 23 Feb 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentWing A (1)_compressed.pdf · uploaded 23 Feb 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentWing A (3)_compressed.pdf · uploaded 23 Feb 2023Source
Show all 154 documentsShow fewer documents
Migrated
- 3 Building Plan Approval / NA Order for plotted developmentWing A(2)_compressed.pdf · uploaded 23 Feb 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentWing B (1)_compressed.pdf · uploaded 23 Feb 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentWing B (2)_compressed.pdf · uploaded 23 Feb 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentWing C (1)_compressed.pdf · uploaded 23 Feb 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentWing C (2)_compressed.pdf · uploaded 23 Feb 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_reduced.pdf · uploaded 23 Feb 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Feb 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentWing C (1)_compressed.pdf · uploaded 24 Feb 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentWing C (2)_compressed.pdf · uploaded 24 Feb 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 24 Feb 2023Source
- 1 CERSAI detailsCERSAI Declaratn.pdf · uploaded 25 Feb 2023Source
- 1 a Details of encumbrances concerned to FinanceDeclaration_No Encumbarances_compressed.pdf · uploaded 27 Feb 2023Source
- 1 b Details of encumbrances concerned to LegalDeclaration_No Encumbarances_compressed.pdf · uploaded 27 Feb 2023Source
- 2 CERSAI detailsCERSAI_Search_Report_200261232671_For_Asset_Based_Search_24_02_2023_11_44_37_518.pdf · uploaded 27 Feb 2023Source
- 3 CERSAI detailsCERSAI_Search_Report_200261235518_For_Asset_Based_Search_24_02_2023_11_58_40_813.pdf · uploaded 27 Feb 2023Source
- 1 Copy of the legal title reportTitle Certificate.pdf · uploaded 14 Mar 2023Source
- 2 a Details of encumbrances concerned to FinanceFor no legal encumbrance.pdf · uploaded 14 Mar 2023Source
- 2 b Details of encumbrances concerned to LegalFor no legal encumbrance.pdf · uploaded 14 Mar 2023Source
- 1 Declaration in FORM BFORM 'B'.pdf · uploaded 14 Mar 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)AVF Enterprises- Form 3 for Registration.pdf · uploaded 14 Mar 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFor Bank Account.pdf · uploaded 14 Mar 2023Source
- 1 Other – TechnicalWing A Section.pdf · uploaded 14 Mar 2023Source
- 2 Other – TechnicalWing B Section.pdf · uploaded 14 Mar 2023Source
- 3 Other – TechnicalWing C Section.pdf · uploaded 14 Mar 2023Source
- 1 Declaration about Commencement CertificateDeclaration about CC.pdf · uploaded 28 Mar 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsFor Interest in Othr companies.pdf · uploaded 28 Mar 2023Source
- 1 Proforma of Agreement for saleAVF Ent- Final Draft of AFS.pdf · uploaded 17 Apr 2023Source
- 1 Proforma of Allotment letterLetter of Allotment_Sai Avenue.pdf · uploaded 17 Apr 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report - Allotment Letter.pdf · uploaded 17 Apr 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report - AFS.pdf · uploaded 17 Apr 2023Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF BOOKED INVENTORY .pdf · uploaded 7 Jul 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate -Form-1.pdf · uploaded 26 Dec 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Architect -_compressed.pdf · uploaded 26 Dec 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2.pdf · uploaded 26 Dec 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 Engineer.pdf · uploaded 26 Dec 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 2nd Quarter.pdf · uploaded 26 Dec 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 1st Quarter.pdf · uploaded 26 Dec 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Architect_compressed.pdf · uploaded 29 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 Engr_Compressed.pdf · uploaded 29 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 29 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Architect_compressed.pdf · uploaded 25 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Engr_compressed.pdf · uploaded 25 Apr 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Booked Inventory- 2nd Qtr.pdf · uploaded 25 Apr 2024Source
- 3 Disclosure of sold/ booked inventoryDiclosure of Sold_Booked Invt - 3rd Qtr.pdf · uploaded 25 Apr 2024Source
- 4 Disclosure of sold/ booked inventoryDisclosure of Sold-Booked -cancelled Invt 4th Qtr.pdf · uploaded 25 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 CA_compressed.pdf · uploaded 25 Apr 2024Source
- 5 Disclosure of sold/ booked inventoryDisclosure of inventory - yearly.pdf · uploaded 29 Apr 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 2 Jul 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Architect_compressed.pdf · uploaded 23 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Engr_compressed.pdf · uploaded 23 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryDisclosure of booked Inventory_Q1.pdf · uploaded 23 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA_compressed.pdf · uploaded 23 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1_compressed.pdf · uploaded 19 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2_compressed.pdf · uploaded 19 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3_compressed.pdf · uploaded 19 Nov 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold-Booked Invt.pdf · uploaded 19 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality Assurance Letter site Engr.pdf · uploaded 19 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1_compressed.pdf · uploaded 19 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3_compressed.pdf · uploaded 19 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2_compressed.pdf · uploaded 19 Nov 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Sold-Booked Invt.pdf · uploaded 19 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality Assurance Letter site Engr.pdf · uploaded 19 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1_compressed.pdf · uploaded 12 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3_compressed.pdf · uploaded 12 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2_compressed.pdf · uploaded 12 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold -Booked Inv- Qtr-3rd.pdf · uploaded 12 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1_compressed.pdf · uploaded 12 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form- 3_compressed.pdf · uploaded 12 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form- 2_compressed.pdf · uploaded 12 May 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold_Booked Inv- Qtr-4th.pdf · uploaded 12 May 2025Source
- Withdrawal Update Form 1Form-1 Architect_compressed.pdf · uploaded 5 Mar 2026Source
- Withdrawal Update Form 1Form-1 Architect_compressed.pdf · uploaded 5 Mar 2026Source
- Withdrawal Update Form 2Form -2 - Engineer.pdf · uploaded 5 Mar 2026Source
- Withdrawal Update Form 2Form -2 - Engineer.pdf · uploaded 5 Mar 2026Source
- Withdrawal Update Form 3Form 3- AVF Enterprises_Q3_FINAL.pdf · uploaded 5 Mar 2026Source
- Withdrawal Update Form 3Form-2_compressed.pdf · uploaded 5 Mar 2026Source
- Form 1Form-1 Architect -_compressed.pdf · uploaded 6 Mar 2026Source
- Form 2Form -2 Engineer.pdf · uploaded 6 Mar 2026Source
- Form 3Form 3 1st Quarter.pdf · uploaded 6 Mar 2026Source
- Disclosure of Sold and Booked InventoryDISCLOSURE OF BOOKED INVENTORY .pdf · uploaded 6 Mar 2026Source
- Form 1Architect Certificate -Form-1.pdf · uploaded 6 Mar 2026Source
- Form 2Form -2.pdf · uploaded 6 Mar 2026Source
- Form 3Form 3 2nd Quarter.pdf · uploaded 6 Mar 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Booked Inventory 2nd Qtr.pdf · uploaded 6 Mar 2026Source
- Form 1Form-1 Architect.pdf · uploaded 6 Mar 2026Source
- Form 2Form -2 Engr.pdf · uploaded 6 Mar 2026Source
- Form 3Form 3.pdf · uploaded 6 Mar 2026Source
- Disclosure of Sold and Booked InventoryDiclosure of Sold_Booked Invt - 3rd Qtr.pdf · uploaded 6 Mar 2026Source
- Form 1Form-1 Architect_compressed.pdf · uploaded 6 Mar 2026Source
- Form 2Form-2 Engr_compressed.pdf · uploaded 6 Mar 2026Source
- Form 3Form-3 CA_compressed.pdf · uploaded 6 Mar 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold-Booked -cancelled Invt 4th Qtr.pdf · uploaded 6 Mar 2026Source
- Form 1Form-1 Architect.pdf · uploaded 6 Mar 2026Source
- Form 2Form-2 Engr.pdf · uploaded 6 Mar 2026Source
- Form 3Revised Form 3.pdf · uploaded 6 Mar 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of booked Inventory_Q1.pdf · uploaded 6 Mar 2026Source
- Form 1Form-1.pdf · uploaded 6 Mar 2026Source
- Form 2Form -2_compressed.pdf · uploaded 6 Mar 2026Source
- Form 3Form-3 (1).pdf · uploaded 6 Mar 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold-Booked Invt.pdf · uploaded 6 Mar 2026Source
- Form 1Form-1_Q3.pdf · uploaded 6 Mar 2026Source
- Form 2Form-2_compressed.pdf · uploaded 6 Mar 2026Source
- Form 3Form-3_compressed.pdf · uploaded 6 Mar 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold -Booked Inv- Qtr-3rd.pdf · uploaded 6 Mar 2026Source
- Form 1Form-1_compressed.pdf · uploaded 6 Mar 2026Source
- Form 2Form- 2_compressed.pdf · uploaded 6 Mar 2026Source
- Form 3Form- 3_compressed.pdf · uploaded 6 Mar 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold_Booked Inv- Qtr-4th.pdf · uploaded 6 Mar 2026Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 16 Mar 2026Source
- Withdrawal Update Form 2Form-2_compressed (1).pdf · uploaded 16 Mar 2026Source
- Withdrawal Update Form 3Form-3_compressed.pdf · uploaded 16 Mar 2026Source
- Withdrawal Update Form 1Form-I- 12-01-2026.pdf · uploaded 17 Mar 2026Source
- Withdrawal Update Form 2Form-2 - 20-02-2026.pdf · uploaded 17 Mar 2026Source
- Withdrawal Update Form 3Form 3- AVF Enterprises_Q3_FINAL.pdf · uploaded 17 Mar 2026Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 2Form -2.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 3Form 3_020626.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 9 Oct 2026Source
- Withdrawal Update Form 1Form-1 Qtr-1.pdf · uploaded 9 Oct 2026Source
- Withdrawal Update Form 2Form -2.pdf · uploaded 9 Oct 2026Source
- Withdrawal Update Form 2Form-2 Qtr-1.pdf · uploaded 9 Oct 2026Source
- Withdrawal Update Form 3Form 3_020626.pdf · uploaded 9 Oct 2026Source
- Withdrawal Update Form 3Form-3 Qtr-1_compressed.pdf · uploaded 9 Oct 2026Source
Technical
- DocumentLayout Plan_reduced.pdf · uploaded 23 Feb 2023Source
- DocumentWing A (1)_compressed.pdf · uploaded 23 Feb 2023Source
- DocumentWing A (3)_compressed.pdf · uploaded 23 Feb 2023Source
- DocumentWing A(2)_compressed.pdf · uploaded 23 Feb 2023Source
- DocumentWing B (1)_compressed.pdf · uploaded 23 Feb 2023Source
- DocumentWing B (2)_compressed.pdf · uploaded 23 Feb 2023Source
- DocumentWing C (1)_compressed.pdf · uploaded 23 Feb 2023Source
- DocumentWing C (2)_compressed.pdf · uploaded 23 Feb 2023Source
- DocumentWing C (1)_compressed.pdf · uploaded 24 Feb 2023Source
- DocumentWing C (2)_compressed.pdf · uploaded 24 Feb 2023Source
- Other – TechnicalWing B Section.pdf · uploaded 14 Mar 2023Source
- Other – TechnicalWing C Section.pdf · uploaded 14 Mar 2023Source
- Other – TechnicalWing A Section.pdf · uploaded 14 Mar 2023Source
Technical (Architect)
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 3, 4/A
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —342 units in all
- Address
- S.No 47, H.No 3/B, S.No 48, H.No 2, 3, /A, 4/A, 5/C, Vasai, VasaiPIN 401208
- Village
- Chandrapada, Vasai taluka
- Location
- 19.35884, 72.87411
- Land area for this project
- 5,195 sq m (55,916 sq ft)
- Permissible built-up area
- 18,382 sq m (1,97,863 sq ft)
- Sanctioned built-up area
- 18,382 sq m (1,97,863 sq ft)
- Recreational open space
- 605 sq m (6,517 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S.No 47,H.No 3/B,S.No 48,H.No 2,3,/A,4/A,5/C
Boundaries
- North
- Vasai Diva railway line
- South
- S No 47 4
- East
- S No 47 2
- West
- Vasai Diva Railway Line
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking342 units
342 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| Residential Bldg Wing A | — | — | 114 |
| Residential Bldg Wing B | — | — | 95 |
| Residential Bldg Wing C | — | — | 133 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | We Design Bhatt | — |
| Chartered accountant | PMC LLP | — |
| Engineer | Mukesh Kumar Kumar | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Chandrapada
- Dixit EnclavesRERA PR1240002602613
- Kalpatru AvenueRERA P99000080798
- Mahalaxmi Nagar - Bldg No.5RERA P99000080397
- Radha Nilaya Phase 2RERA P99000079268
- Tivoli TowersRERA P99000078140
- Yashoda ApartmentRERA P99000053432
- Trinity OasisRERA P99000049405
- Siddhivinayak ApartmentRERA P99000048757
All 20 projects in Chandrapada · Compare Sai Avenue with another project