Skip to content
Deedo home
Menu

Gokul 3

Completed

Satpur, Nashik 422012 |Promoter: Gokul Infrastructure

16 Oct 2019Registered with MahaRERA
30 Dec 2022Promised completion
1Building
16Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
1BHK, Shop16 units in all
Land area for this project
432 sq m (4,650 sq ft)
Permissible built-up area
499 sq m (5,375 sq ft)
Sanctioned built-up area
499 sq m (5,375 sq ft)
Address
Plot No 40, Survey No 130/2/1A 2/1B 2/1C 2/1D, Datta Mandir Road, Gangapur ShiwarPIN 422012
Designated bank account
City Union Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Gokul 3 is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
16 Oct 2019
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160002275716 Oct 201930 Dec 2022—Gokul InfrastructureProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Gokul 3416

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 units registered

1BHK · 12 unitsShop · 4 units
TypeCarpet areaUnits
1BHK33.03 sq m · 356 sq ft3
1BHK34.09 sq m · 367 sq ft3
1BHK34.21 sq m · 368 sq ft3
1BHK35.34 sq m · 380 sq ft3
Shop10.25 sq m · 110 sq ft1
Shop10.41 sq m · 112 sq ft1
Shop11.13 sq m · 120 sq ft1
Shop13.44 sq m · 145 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Gokul 3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree Planting100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage Water100%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

12 documents held by Deedo, 15 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 2

Form 1

Registration certificate

Completion

Other

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportTitle Report - Gokul 3.pdf · uploaded 8 Oct 2019View
  • Details of encumbrancesNon Encumbrance Certificate.pdf · uploaded 8 Oct 2019View
  • Copy of Layout Approval (in case of layout)Layout Copy.pdf · uploaded 8 Oct 2019View
  • Building Plan Approval / NA Order for plotted developmentBuilding Approval Plan.pdf · uploaded 8 Oct 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 8 Oct 2019View
  • Declaration in FORM BForm B - Declaration.pdf · uploaded 8 Oct 2019View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Certificate.pdf · uploaded 8 Oct 2019View
  • Proforma of Allotment letterGokul 3 - Draft Agreement for Sale.pdf · uploaded 8 Oct 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Certificate.pdf · uploaded 9 Oct 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentG03 COMPLETION_v1.pdf · uploaded 24 Jan 2023View

Promoter documents

  • Legal Title reportTitle Report - Gokul 3.pdf · uploaded 8 Oct 2019View
  • Declaration Form BForm B - Declaration.pdf · uploaded 8 Oct 2019View

Technical documents

  • Layout ApprovalLayout Copy.pdfView
  • Building Plan ApprovalBuilding Approval Plan.pdfView

Proforma allotment letter

  • Proforma allotment letterGokul 3 - Draft Agreement for Sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Shivaji Nagar

Survey, CTS, gat or plot numbers

Plot No 40Plot No 40Survey No 130/2/1A 2/1B 2/1C 2/1DSurvey No 130/2/1A 2/1B 2/1C 2/1D

As published on MahaRERA's project page

Plot No 40, Survey No 130/2/1A 2/1B 2/1C 2/1D

Boundaries

North
12 Mtr Colony Road
South
Survey No 130 1A
East
Plot No 39
West
40 Ft Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShriniwas Consultant—
Chartered accountantJain Chhajed & Associates—
EngineerD B Gavhane—
OtherYash Pandurang Katale—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology