Residential / Group Housing · 3 buildings · 109 unitsRERA P51600032066

Matruchaya

Deedo IDDP-NSK-R1KX

It is due for completion in Aug 2030, with no extension on record; no MahaRERA orders on record; 0% of its units are booked.

Palse, Nashik 422101 · by Baldeosingh Jaisingh Bagga

DeliveryDue Aug 2030No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 109 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Aug 2030, with no extension on record

  • This projectRegistered 3 Dec 2021, completion promised 15 Aug 2030.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51600032066
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P516000320663 Dec 202115 Aug 203015 Aug 2030Baldeosingh Jaisingh BaggaProject page
Documents134

1 document held by Deedo, 133 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN CARD PHOTOCOPY.pdf · uploaded 2 Oct 2021Source

Legal

  • OtherNA ORDER MATRUCHAYA.pdf · uploaded 2 Oct 2021Source
  • Legal Title reportMATRUCHAYA SEARCH REPORT.pdf · uploaded 2 Oct 2021Source
  • Declaration Form BAFFIDAVIT CUM DECLARATION.pdf · uploaded 2 Oct 2021Source
  • OtherSelf Declaration.pdf · uploaded 23 May 2022Source

Migrated

  • 1 PAN CardPAN CARD PHOTOCOPY.pdf · uploaded 2 Oct 2021Source
  • 1 Copy of the legal title reportMATRUCHAYA SEARCH REPORT.pdf · uploaded 2 Oct 2021Source
Show all 134 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesMATRUCHAYA NO ENCUMBRANCES CERT.pdf · uploaded 2 Oct 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentNA ORDER MATRUCHAYA.pdf · uploaded 2 Oct 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentNMRDA COMMENCEMENT CERT.pdf · uploaded 2 Oct 2021Source
  • 1 Declaration in FORM BAFFIDAVIT CUM DECLARATION.pdf · uploaded 2 Oct 2021Source
  • 1 OtherNA ORDER MATRUCHAYA.pdf · uploaded 2 Oct 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate.pdf · uploaded 5 Oct 2021Source
  • 1 Declaration about Commencement CertificateCOMMENCEMENT.pdf · uploaded 11 Oct 2021Source
  • 1 Copy of Layout Approval (in case of layout)MATRUCHAYA SHEET 1.pdf · uploaded 23 Oct 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentMATRUCHAYA SHEET 2.pdf · uploaded 23 Oct 2021Source
  • 1 Proforma of Allotment letterSale Deed and Allotment.pdf · uploaded 11 Nov 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC CERTIFICATE_compressed.pdf · uploaded 12 Nov 2021Source
  • 2 OtherSelf Declaration.pdf · uploaded 23 May 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.PDF · uploaded 26 Feb 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.PDF · uploaded 27 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 14 Mar 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 14 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 2021-22.pdf · uploaded 4 Apr 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Apr 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 17 Feb 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 17 Feb 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 231032023_compressed.pdf · uploaded 17 Feb 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 (30-06-2022).pdf · uploaded 27 Feb 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3(30-9-2022).pdf · uploaded 27 Feb 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)31122023.pdf · uploaded 1 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)30062022.pdf · uploaded 1 Mar 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)30092022.pdf · uploaded 1 Mar 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)31032023.pdf · uploaded 1 Mar 2024Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)30062023.pdf · uploaded 1 Mar 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30-6-22_compressed.pdf · uploaded 1 Mar 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30-9-22_compressed.pdf · uploaded 1 Mar 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31-12-22_compressed.pdf · uploaded 1 Mar 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31-3-23_compressed.pdf · uploaded 1 Mar 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30-6-23_compressed.pdf · uploaded 1 Mar 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30-9-23_compressed.pdf · uploaded 1 Mar 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31-12-23_compressed.pdf · uploaded 1 Mar 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5-31032023.pdf · uploaded 1 Mar 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-30062022.pdf · uploaded 2 Mar 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-30092022.pdf · uploaded 2 Mar 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-31122022.pdf · uploaded 2 Mar 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-31122022.pdf · uploaded 2 Mar 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-31032023.pdf · uploaded 2 Mar 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-30062023.pdf · uploaded 2 Mar 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-30092023_compressed.pdf · uploaded 2 Mar 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-31122023_compressed.pdf · uploaded 2 Mar 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30-6-23_compressed.pdf · uploaded 2 Mar 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)30062022.pdf · uploaded 5 Mar 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)30092022.pdf · uploaded 5 Mar 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)31032023.pdf · uploaded 5 Mar 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)31032023.pdf · uploaded 5 Mar 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)30062023.pdf · uploaded 5 Mar 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)31122023.pdf · uploaded 5 Mar 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3-31324_compressed.pdf · uploaded 22 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM5-310324_compressed.pdf · uploaded 22 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3-june24_compressed.pdf · uploaded 17 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3-sept24_compressed.pdf · uploaded 17 Feb 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3-dec24_compressed.pdf · uploaded 17 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2-june24.pdf · uploaded 17 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2-sept24.pdf · uploaded 17 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2-dec 24.pdf · uploaded 17 Feb 2025Source
  • 3 Disclosure of sold/ booked inventorysoldunsold-dec23.pdf · uploaded 17 Feb 2025Source
  • 7 Disclosure of sold/ booked inventorysoldunsold-dec24.pdf · uploaded 17 Feb 2025Source
  • 6 Disclosure of sold/ booked inventorysoldunsold-sept24.pdf · uploaded 17 Feb 2025Source
  • 5 Disclosure of sold/ booked inventorysoldunsold-jun24.pdf · uploaded 17 Feb 2025Source
  • 4 Disclosure of sold/ booked inventorysoldunsold-mar24.pdf · uploaded 17 Feb 2025Source
  • 2 Disclosure of sold/ booked inventorysoldunsold-sept23.pdf · uploaded 17 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorysoldunsold-jun23.pdf · uploaded 17 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-31032024.pdf · uploaded 18 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-30062024.pdf · uploaded 18 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-3092024.pdf · uploaded 18 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-31122024.pdf · uploaded 18 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A-30092023.pdf · uploaded 18 Feb 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A-311223.pdf · uploaded 18 Feb 2025Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A-310324.pdf · uploaded 18 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A-300624.pdf · uploaded 18 Feb 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A-300924.pdf · uploaded 18 Feb 2025Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A-311224.pdf · uploaded 18 Feb 2025Source
  • 1 a Details of encumbrances concerned to FinanceNo Encumbrance.pdf · uploaded 21 Feb 2025Source
  • 1 CERSAI detailscersai.pdf · uploaded 21 Feb 2025Source
  • 1 b Details of encumbrances concerned to LegalNo Encumbrance.pdf · uploaded 21 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Bagga form 3-310325_compressed.pdf · uploaded 6 May 2025Source
  • 1 Disclosure of sold/ booked inventorySold unsold-310325.pdf · uploaded 6 May 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1-matruchaya.pdf · uploaded 11 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 matruchaya.pdf · uploaded 11 May 2025Source
  • Form 1Form 1-310325.pdf · uploaded 3 Jul 2025Source
  • Form 2Form 2-310325.pdf · uploaded 3 Jul 2025Source
  • Form 3Form 3-310325_compressed.pdf · uploaded 3 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysoldunsold-310325.pdf · uploaded 3 Jul 2025Source
  • OthersForm 2a-310325.pdf · uploaded 3 Jul 2025Source
  • Withdrawal Update Form 1arch-bagga.pdf · uploaded 25 Jul 2025Source
  • Withdrawal Update Form 2form2-bagga.pdf · uploaded 25 Jul 2025Source
  • Withdrawal Update Form 3form 3-bagga june.pdf · uploaded 25 Jul 2025Source
  • Withdrawal Update Form 1Form 1-bagga.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 1Form 1-bagga.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 2Form 2-bagga.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 2Form 2-bagga.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 3Form 3-bagga-1_compressed.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 3Form 3-bagga-1_compressed.pdf · uploaded 15 Oct 2025Source
  • Withdrawal Update Form 1Form 1-bagga.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 2Form 2-bagga.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 3Form 3-bagga-1_compressed.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 1form1-311225.pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 2form2-311225.pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 3form-3-311225.pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 1Architectcert31032026.pdf · uploaded 15 Apr 2026Source
  • Withdrawal Update Form 2engg cert31032026.pdf · uploaded 15 Apr 2026Source
  • Withdrawal Update Form 3CA CERT31032026_compressed.pdf · uploaded 15 Apr 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 3Form 3_compressed.pdf · uploaded 14 Jul 2026Source
  • Form 2A (FY 2024-2025)Form 2A (1).pdf · uploaded 10 Aug 2026Source
  • Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 10 Aug 2026Source
  • Form 5 (FY 2025-2026)Form 5-bagga.pdf · uploaded 29 Sep 2026Source

Technical

  • DocumentNA ORDER MATRUCHAYA.pdf · uploaded 2 Oct 2021Source
  • DocumentMATRUCHAYA SHEET 1.pdf · uploaded 23 Oct 2021Source
  • DocumentMATRUCHAYA SHEET 2.pdf · uploaded 23 Oct 2021Source

Technical (Architect)

  • DocumentForm 1-31032024.pdf · uploaded 18 Feb 2025Source
  • DocumentForm 1-30062024.pdf · uploaded 18 Feb 2025Source
  • DocumentForm 1-3092024.pdf · uploaded 18 Feb 2025Source
  • DocumentForm 1-31122024.pdf · uploaded 18 Feb 2025Source
  • DocumentForm-1-matruchaya.pdf · uploaded 11 May 2025Source
  • DocumentForm 1.pdf · uploaded 14 Jul 2026Source

Technical (Engineer)

  • Documentform 2-june24.pdf · uploaded 17 Feb 2025Source
  • Documentform 2-sept24.pdf · uploaded 17 Feb 2025Source
  • Documentform 2-dec 24.pdf · uploaded 17 Feb 2025Source
  • DocumentForm-2 matruchaya.pdf · uploaded 11 May 2025Source
  • DocumentForm 2.pdf · uploaded 14 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 150

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2BHK, Shop109 units in all
Address
150, Nashik Pune Road, Shinde PalsePIN 422101
Village
Palse, Nashik taluka
Land area for this project
5,600 sq m (60,278 sq ft)
Permissible built-up area
5,554 sq m (59,787 sq ft)
Sanctioned built-up area
5,554 sq m (59,787 sq ft)
Recreational open space
529 sq m (5,690 sq ft)
Designated bank account
109
Developed in phases
Yes

Survey, CTS, gat or plot numbers

150

Land as published on MahaRERA's project page

150

Boundaries

North
123
South
149
East
129
West
151

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking109 units

0 of 109 units booked (0%), as the promoter reported to MahaRERA

2BHK · 96 unitsShop · 13 units
BuildingTypeCarpet areaUnitsBooked
Matruchaya 12BHK47.92 sq m · 516 sq ft40
Matruchaya 12BHK48.46 sq m · 522 sq ft80
Matruchaya 12BHK49.89 sq m · 537 sq ft40
Matruchaya 12BHK50.44 sq m · 543 sq ft80
Matruchaya 12BHK53.27 sq m · 573 sq ft40
Matruchaya 12BHK55.24 sq m · 595 sq ft40
Matruchaya 22BHK47.92 sq m · 516 sq ft40
Matruchaya 22BHK48.46 sq m · 522 sq ft80
Show all 27 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Matruchaya 22BHK49.89 sq m · 537 sq ft40
Matruchaya 22BHK50.44 sq m · 543 sq ft80
Matruchaya 22BHK53.27 sq m · 573 sq ft40
Matruchaya 22BHK55.24 sq m · 595 sq ft40
Matruchaya 32BHK47.92 sq m · 516 sq ft40
Matruchaya 32BHK48.46 sq m · 522 sq ft80
Matruchaya 32BHK49.89 sq m · 537 sq ft40
Matruchaya 32BHK50.44 sq m · 543 sq ft80
Matruchaya 32BHK53.27 sq m · 573 sq ft40
Matruchaya 32BHK55.24 sq m · 595 sq ft40
Matruchaya 3Shop5.34 sq m · 57 sq ft10
Matruchaya 3Shop5.79 sq m · 62 sq ft20
Matruchaya 3Shop8.24 sq m · 89 sq ft20
Matruchaya 3Shop8.69 sq m · 94 sq ft10
Matruchaya 3Shop9.33 sq m · 100 sq ft10
Matruchaya 3Shop9.81 sq m · 106 sq ft20
Matruchaya 3Shop12.46 sq m · 134 sq ft20
Matruchaya 3Shop12.6 sq m · 136 sq ft10
Matruchaya 3Shop16.85 sq m · 181 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMukul Patil—
Chartered accountantGirish Lasi—
Chartered accountantHsb & Co—
Chartered accountantNitesh Wankhade—
EngineerAchal Raje—
EngineerJayesh Banga—

Source: MahaRERA project page. Contact details are not shown.