Anmol Nayantara Gold

Completed

Nashik 422009 |Promoter: Bafna Builders and Land Developers

Residential / Group HousingRERAP51600002894
4 Aug 2017Registered with MahaRERA
31 Dec 2018Promised completion
31 Dec 2019Revised completionPushed back 1 year
15Buildings
620Units registered
2MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
15
Unit types
1bhk, 2bhk, 3bhk, 2bkh620 units in all
Land area for this project
29,626 sq m (3,18,889 sq ft)
Permissible built-up area
77,379 sq m (8,32,900 sq ft)
Sanctioned built-up area
39,767 sq m (4,28,045 sq ft)
Recreational open space
3,119 sq m (33,573 sq ft)
Address
905 2 plus 1 plus 2/1PIN 422009
Designated bank account
Icici Bank Limited
Litigation declared by promoter
Yes
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.07355, 78.96135
Anmol Nayantara Gold is at latitude 21.07355, longitude 78.96135.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 6 years and 10 months ago.

Registered
4 Aug 2017
Promised
31 Dec 2018
Revised
31 Dec 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P516000028944 Aug 201731 Dec 201831 Dec 2019Bafna Builders and Land DevelopersProject page

15 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A - Aquamarine1240
B- Amethyst1240
C-Crystal1240
D-Coral1240
E- Diamond1360
F-Embrald1340
G - Moonstone1340
H-Peral1340
Show all 15 buildingsShow fewer buildings
BuildingSanctioned floorsUnits
I - Ruby1240
J-Sapphire1240
K - Topaz1240
L- Quartz1240
M -Lapis1240
N- Jasper1240
O -Amber1240

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

620 units registered

1bhk · 50 units2bhk · 309 units3bhk · 260 units2bkh · 1 unit
BuildingTypeCarpet areaUnits
A - Aquamarine1bhk42.88 sq m · 462 sq ft1
A - Aquamarine1bhk42.89 sq m · 462 sq ft2
A - Aquamarine1bhk46.24 sq m · 498 sq ft2
A - Aquamarine1bhk46.25 sq m · 498 sq ft2
A - Aquamarine1bhk46.31 sq m · 498 sq ft1
A - Aquamarine1bhk46.32 sq m · 499 sq ft2
A - Aquamarine2bhk63.42 sq m · 683 sq ft1
A - Aquamarine2bhk66.03 sq m · 711 sq ft10
Show all 210 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnits
A - Aquamarine2bhk66.17 sq m · 712 sq ft9
A - Aquamarine2bhk69.07 sq m · 743 sq ft1
A - Aquamarine2bhk69.08 sq m · 744 sq ft1
A - Aquamarine2bhk69.09 sq m · 744 sq ft2
A - Aquamarine2bhk69.19 sq m · 745 sq ft3
A - Aquamarine2bhk70.06 sq m · 754 sq ft2
A - Aquamarine2bhk70.11 sq m · 755 sq ft1
B- Amethyst2bhk65.82 sq m · 708 sq ft2
B- Amethyst2bhk65.87 sq m · 709 sq ft1
B- Amethyst2bhk66.67 sq m · 718 sq ft1
B- Amethyst2bhk66.72 sq m · 718 sq ft1
B- Amethyst2bhk68.44 sq m · 737 sq ft4
B- Amethyst2bhk68.53 sq m · 738 sq ft1
B- Amethyst2bhk68.54 sq m · 738 sq ft3
B- Amethyst2bhk69.07 sq m · 743 sq ft2
B- Amethyst2bhk69.08 sq m · 744 sq ft2
B- Amethyst2bhk69.19 sq m · 745 sq ft3
B- Amethyst3bhk86.32 sq m · 929 sq ft6
B- Amethyst3bhk86.41 sq m · 930 sq ft8
B- Amethyst3bhk88.01 sq m · 947 sq ft1
B- Amethyst3bhk88.25 sq m · 950 sq ft2
B- Amethyst3bhk88.34 sq m · 951 sq ft2
B- Amethyst3bhk88.37 sq m · 951 sq ft1
C-Crystal2bhk65.62 sq m · 706 sq ft1
C-Crystal2bhk65.82 sq m · 708 sq ft1
C-Crystal2bhk65.88 sq m · 709 sq ft1
C-Crystal2bhk66.67 sq m · 718 sq ft2
C-Crystal2bhk68.35 sq m · 736 sq ft1
C-Crystal2bhk68.44 sq m · 737 sq ft4
C-Crystal2bhk68.54 sq m · 738 sq ft3
C-Crystal2bhk69 sq m · 743 sq ft1
C-Crystal2bhk69.07 sq m · 743 sq ft2
C-Crystal2bhk69.08 sq m · 744 sq ft2
C-Crystal2bhk69.19 sq m · 745 sq ft2
C-Crystal3bhk86.32 sq m · 929 sq ft6
C-Crystal3bhk86.41 sq m · 930 sq ft9
C-Crystal3bhk87.98 sq m · 947 sq ft1
C-Crystal3bhk88.05 sq m · 948 sq ft1
C-Crystal3bhk88.36 sq m · 951 sq ft3
D-Coral2bhk65.82 sq m · 708 sq ft3
D-Coral2bhk65.87 sq m · 709 sq ft2
D-Coral2bhk66.67 sq m · 718 sq ft4
D-Coral2bhk66.72 sq m · 718 sq ft2
D-Coral2bhk68.44 sq m · 737 sq ft3
D-Coral2bhk68.54 sq m · 738 sq ft1
D-Coral2bhk69 sq m · 743 sq ft1
D-Coral2bhk69.07 sq m · 743 sq ft2
D-Coral2bhk69.19 sq m · 745 sq ft2
D-Coral3bhk86.32 sq m · 929 sq ft10
D-Coral3bhk86.41 sq m · 930 sq ft7
D-Coral3bhk88.01 sq m · 947 sq ft3
E- Diamond2bhk63.31 sq m · 681 sq ft1
E- Diamond2bhk63.33 sq m · 682 sq ft11
E- Diamond2bhk63.44 sq m · 683 sq ft3
E- Diamond2bhk65.43 sq m · 704 sq ft1
E- Diamond2bhk65.66 sq m · 707 sq ft13
E- Diamond2bhk65.7 sq m · 707 sq ft16
E- Diamond2bhk65.8 sq m · 708 sq ft3
E- Diamond2bhk65.84 sq m · 709 sq ft4
E- Diamond2bhk67.75 sq m · 729 sq ft5
E- Diamond2bhk67.79 sq m · 730 sq ft3
F-Embrald2bhk59.78 sq m · 643 sq ft1
F-Embrald2bhk59.85 sq m · 644 sq ft3
F-Embrald2bhk59.87 sq m · 644 sq ft1
F-Embrald2bhk63.15 sq m · 680 sq ft1
F-Embrald2bhk65.66 sq m · 707 sq ft3
F-Embrald2bhk65.7 sq m · 707 sq ft3
F-Embrald2bhk66.18 sq m · 712 sq ft1
F-Embrald2bhk66.18 sq m · 712 sq ft3
F-Embrald2bhk66.21 sq m · 713 sq ft2
F-Embrald2bhk66.22 sq m · 713 sq ft2
F-Embrald3bhk88.24 sq m · 950 sq ft1
F-Embrald3bhk88.25 sq m · 950 sq ft1
F-Embrald3bhk88.26 sq m · 950 sq ft7
F-Embrald3bhk88.28 sq m · 950 sq ft1
F-Embrald3bhk88.29 sq m · 950 sq ft8
F-Embrald3bhk90.09 sq m · 970 sq ft1
F-Embrald3bhk90.36 sq m · 973 sq ft1
G - Moonstone2bhk59.78 sq m · 643 sq ft2
G - Moonstone2bhk62.65 sq m · 674 sq ft1
G - Moonstone2bhk63.15 sq m · 680 sq ft3
G - Moonstone2bhk65.66 sq m · 707 sq ft5
G - Moonstone2bhk65.7 sq m · 707 sq ft2
G - Moonstone2bhk66.17 sq m · 712 sq ft2
G - Moonstone2bhk66.19 sq m · 712 sq ft2
G - Moonstone2bhk66.21 sq m · 713 sq ft2
G - Moonstone2bhk66.22 sq m · 713 sq ft1
G - Moonstone3bhk88.24 sq m · 950 sq ft1
G - Moonstone3bhk88.25 sq m · 950 sq ft5
G - Moonstone3bhk88.26 sq m · 950 sq ft3
G - Moonstone3bhk88.27 sq m · 950 sq ft1
G - Moonstone3bhk88.28 sq m · 950 sq ft2
G - Moonstone3bhk88.29 sq m · 950 sq ft7
G - Moonstone3bhk90.36 sq m · 973 sq ft1
H-Peral3bhk90.05 sq m · 969 sq ft1
H-Peral3bhk90.49 sq m · 974 sq ft1
H-Peral3bhk90.5 sq m · 974 sq ft8
H-Peral3bhk92.1 sq m · 991 sq ft1
H-Peral3bhk92.11 sq m · 991 sq ft2
H-Peral3bhk92.12 sq m · 992 sq ft4
H-Peral3bhk93.42 sq m · 1,006 sq ft1
H-Peral3bhk93.48 sq m · 1,006 sq ft2
H-Peral3bhk93.49 sq m · 1,006 sq ft2
H-Peral3bhk93.51 sq m · 1,007 sq ft2
H-Peral3bhk93.52 sq m · 1,007 sq ft3
H-Peral3bhk93.59 sq m · 1,007 sq ft3
H-Peral3bhk93.63 sq m · 1,008 sq ft1
H-Peral3bhk93.64 sq m · 1,008 sq ft2
H-Peral3bhk94.33 sq m · 1,015 sq ft2
H-Peral3bhk94.7 sq m · 1,019 sq ft1
H-Peral3bhk94.93 sq m · 1,022 sq ft1
H-Peral3bhk95.36 sq m · 1,026 sq ft1
H-Peral3bhk95.53 sq m · 1,028 sq ft2
I - Ruby1bhk43.16 sq m · 465 sq ft1
I - Ruby1bhk43.43 sq m · 467 sq ft1
I - Ruby1bhk43.6 sq m · 469 sq ft1
I - Ruby1bhk43.86 sq m · 472 sq ft4
I - Ruby1bhk43.93 sq m · 473 sq ft4
I - Ruby1bhk44.7 sq m · 481 sq ft5
I - Ruby1bhk44.76 sq m · 482 sq ft4
I - Ruby2bhk66.1 sq m · 711 sq ft2
I - Ruby2bhk66.98 sq m · 721 sq ft1
I - Ruby2bhk68.95 sq m · 742 sq ft4
I - Ruby2bhk69.08 sq m · 744 sq ft1
I - Ruby2bhk69.09 sq m · 744 sq ft2
I - Ruby2bhk69.65 sq m · 750 sq ft5
I - Ruby2bhk69.79 sq m · 751 sq ft4
I - Ruby2bkh66.19 sq m · 712 sq ft1
J-Sapphire2bhk63.09 sq m · 679 sq ft3
J-Sapphire2bhk63.13 sq m · 680 sq ft1
J-Sapphire2bhk63.58 sq m · 684 sq ft1
J-Sapphire2bhk63.61 sq m · 685 sq ft1
J-Sapphire2bhk66.06 sq m · 711 sq ft3
J-Sapphire2bhk66.07 sq m · 711 sq ft1
J-Sapphire2bhk66.17 sq m · 712 sq ft4
J-Sapphire2bhk66.18 sq m · 712 sq ft2
J-Sapphire2bhk66.19 sq m · 712 sq ft2
J-Sapphire2bhk66.21 sq m · 713 sq ft1
J-Sapphire2bhk66.29 sq m · 714 sq ft1
J-Sapphire3bhk89.28 sq m · 961 sq ft1
J-Sapphire3bhk89.29 sq m · 961 sq ft2
J-Sapphire3bhk89.34 sq m · 962 sq ft5
J-Sapphire3bhk89.96 sq m · 968 sq ft4
J-Sapphire3bhk90.05 sq m · 969 sq ft4
J-Sapphire3bhk90.06 sq m · 969 sq ft1
J-Sapphire3bhk91.27 sq m · 982 sq ft2
J-Sapphire3bhk92.12 sq m · 992 sq ft1
K - Topaz2bhk63.09 sq m · 679 sq ft2
K - Topaz2bhk63.13 sq m · 680 sq ft2
K - Topaz2bhk63.58 sq m · 684 sq ft1
K - Topaz2bhk63.61 sq m · 685 sq ft2
K - Topaz2bhk66.06 sq m · 711 sq ft2
K - Topaz2bhk66.07 sq m · 711 sq ft1
K - Topaz2bhk66.17 sq m · 712 sq ft4
K - Topaz2bhk66.19 sq m · 712 sq ft3
K - Topaz2bhk66.29 sq m · 714 sq ft3
K - Topaz3bhk88.29 sq m · 950 sq ft1
K - Topaz3bhk89.29 sq m · 961 sq ft3
K - Topaz3bhk89.34 sq m · 962 sq ft4
K - Topaz3bhk89.96 sq m · 968 sq ft4
K - Topaz3bhk90.05 sq m · 969 sq ft3
K - Topaz3bhk90.06 sq m · 969 sq ft1
K - Topaz3bhk91.25 sq m · 982 sq ft1
K - Topaz3bhk91.27 sq m · 982 sq ft1
K - Topaz3bhk92.03 sq m · 991 sq ft1
K - Topaz3bhk92.12 sq m · 992 sq ft1
L- Quartz1bhk49.11 sq m · 529 sq ft5
L- Quartz1bhk49.64 sq m · 534 sq ft5
L- Quartz1bhk49.96 sq m · 538 sq ft5
L- Quartz1bhk50.47 sq m · 543 sq ft5
L- Quartz2bhk74.74 sq m · 804 sq ft5
L- Quartz2bhk75.07 sq m · 808 sq ft5
L- Quartz2bhk75.44 sq m · 812 sq ft5
L- Quartz2bhk75.76 sq m · 815 sq ft5
M -Lapis3bhk89.6 sq m · 964 sq ft1
M -Lapis3bhk90.5 sq m · 974 sq ft1
M -Lapis3bhk91.38 sq m · 984 sq ft1
M -Lapis3bhk91.67 sq m · 987 sq ft1
M -Lapis3bhk93.18 sq m · 1,003 sq ft4
M -Lapis3bhk93.46 sq m · 1,006 sq ft4
M -Lapis3bhk93.48 sq m · 1,006 sq ft1
M -Lapis3bhk93.52 sq m · 1,007 sq ft1
M -Lapis3bhk93.64 sq m · 1,008 sq ft1
M -Lapis3bhk94.48 sq m · 1,017 sq ft1
M -Lapis3bhk103.12 sq m · 1,110 sq ft4
M -Lapis3bhk103.59 sq m · 1,115 sq ft4
M -Lapis3bhk104.05 sq m · 1,120 sq ft4
M -Lapis3bhk104.61 sq m · 1,126 sq ft4
M -Lapis3bhk105.21 sq m · 1,132 sq ft4
M -Lapis3bhk106.93 sq m · 1,151 sq ft4
N- Jasper2bhk71.44 sq m · 769 sq ft5
N- Jasper2bhk71.63 sq m · 771 sq ft5
N- Jasper2bhk71.95 sq m · 774 sq ft5
N- Jasper2bhk72.14 sq m · 777 sq ft5
N- Jasper3bhk97.64 sq m · 1,051 sq ft10
N- Jasper3bhk97.83 sq m · 1,053 sq ft10
O -Amber2bhk71.44 sq m · 769 sq ft5
O -Amber2bhk71.63 sq m · 771 sq ft5
O -Amber2bhk71.95 sq m · 774 sq ft5
O -Amber2bhk72.14 sq m · 777 sq ft5
O -Amber3bhk97.38 sq m · 1,048 sq ft10
O -Amber3bhk97.64 sq m · 1,051 sq ft10

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A - AquamarineClosed/Covered000010
A - AquamarineOpen Space000020
B- AmethystClosed/Covered000013
B- AmethystOpen Space000020
C-CrystalClosed/Covered000014
C-CrystalOpen Space000020
D-CoralClosed/Covered000011
D-CoralOpen Space000020
Show all 30 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
E- DiamondClosed/Covered000043
E- DiamondOpen Space000027
F-EmbraldClosed/Covered000035
F-EmbraldOpen Space000026
G - MoonstoneClosed/Covered000035
G - MoonstoneOpen Space000027
H-PeralClosed/Covered000042
H-PeralOpen Space000027
I - RubyClosed/Covered000010
I - RubyOpen Space000020
J-SapphireClosed/Covered000013
J-SapphireOpen Space000020
K - TopazClosed/Covered000014
K - TopazOpen Space000020
L- QuartzClosed/Covered00009
L- QuartzOpen Space000020
M -LapisClosed/Covered000017
M -LapisOpen Space000020
N- JasperClosed/Covered000012
N- JasperOpen Space000020
O -AmberClosed/Covered000012
O -AmberOpen Space000020

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A - Aquamarine

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises95%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B- Amethyst

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises98%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

C-Crystal

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises98%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Show all 16 buildings and common areasShow fewer buildings and common areas

D-Coral

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises98%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

E- Diamond

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)100%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises98%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

F-Embrald

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)100%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises98%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

G - Moonstone

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)100%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises98%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

H-Peral

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)100%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises98%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

I - Ruby

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises95%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

J-Sapphire

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises95%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K - Topaz

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises95%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

L- Quartz

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises95%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

M -Lapis

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises95%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

N- Jasper

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises95%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

O -Amber

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises95%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Common areas and amenities

  • Internal Roads & FootpathsComplete100%
  • Water SupplyComplete100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Complete100%
  • Storm Water DrainsComplete100%
  • Landscaping & Tree PlantingComplete100%
  • Street LightingComplete100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsComplete100%
  • Treatment And Disposal Of Sewage And Sullage WaterComplete90%
  • Solid Waste Management And DisposalComplete100%
  • Water conservation /Rain water harvestingComplete100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsComplete100%
  • Electrical meter room, sub-station, receiving stationComplete100%
  • Aggregate area of recreational Open SpaceComplete100%
  • Open ParkingComplete100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

49 documents held by Deedo, 49 filings listed on MahaRERA's project page

Title report

Commencement certificate

Form 1 (16)

Show all 98 documentsShow fewer documents

Form 1 (16)

Form 2 (9)

Form 5 (4)

Form B

Encumbrance details

Registration certificate

Extension certificate

Form 4

Other (8)

Occupancy / completion certificate

  • Occupancy / completion certificate15 Jun 2022ViewSource

Allotment letter

Layout plan (2)

Building plan

Document library

  • Building Plan Approval (IOD)scan299.pdf · uploaded 22 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentNew Doc 2017-07-22(1)(1).pdf · uploaded 22 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)gold engineers part 1_20170722120802.pdf · uploaded 22 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Gold engineers part 2_20170722121033.pdf · uploaded 22 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)gold engineers part 3_20170722121303.pdf · uploaded 22 Jul 2017View
  • Copy of the legal title reportNew Doc 2017-07-22 (1).pdf · uploaded 22 Jul 2017View
  • Certificates of CA (Form 5)Form5(2).pdf · uploaded 22 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)archi Gold p1_20170722171731.pdf · uploaded 22 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)archi Gold p1_20170722171731.pdf · uploaded 22 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)archi Gold p3_20170722172403.pdf · uploaded 22 Jul 2017View
  • Details of encumbrancesNew Doc 2017-07-24 (1).pdf · uploaded 24 Jul 2017View
  • Declaration in FORM Bbbld form b.pdf · uploaded 24 Jul 2017View
  • Building Plan Approval (IOD)New Doc 2017-07-24.pdf · uploaded 24 Jul 2017View
  • Proforma of Allotment letterGOLD - RERA - MASTER AGREEMENT -.pdf · uploaded 24 Jul 2017View
  • Copy of Layout Approval (in case of layout)scan329.pdf · uploaded 24 Jul 2017View
  • Copy of Layout Approval (in case of layout)New Doc 2017-07-24.pdf · uploaded 24 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)gold eng certificate_20180302154025.pdf · uploaded 2 Mar 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 3 part 1 gold_20180302153926.pdf · uploaded 2 Mar 2018View
  • Certificates of CA (Form 5)form 5 gold_20180302153945.pdf · uploaded 2 Mar 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Archi Gold Part 1.pdf · uploaded 2 Mar 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Archi Gold Part 2.pdf · uploaded 2 Mar 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Archi Gold Part 3.pdf · uploaded 2 Mar 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Archi Gold Part 4.pdf · uploaded 2 Mar 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Archi Gold Part 5.pdf · uploaded 2 Mar 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Archi Gold Part 6.pdf · uploaded 2 Mar 2018View
  • Certificates of CA (Form 5)gold form 5_1.pdf · uploaded 30 Sep 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)gold architect_17.pdf · uploaded 24 Dec 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)gold architect.pdf · uploaded 24 Dec 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)gold architect (1).pdf · uploaded 24 Dec 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)gold architect (2).pdf · uploaded 24 Dec 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)gold architect (3).pdf · uploaded 24 Dec 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)gold eng.pdf · uploaded 24 Dec 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)gold eng (1).pdf · uploaded 24 Dec 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)gold eng (2).pdf · uploaded 24 Dec 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)gold AC part 1_compressed.pdf · uploaded 6 Nov 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)gold AC part 2_compressed.pdf · uploaded 6 Nov 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)gold EC part1_compressed.pdf · uploaded 6 Nov 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)gold EC part2.pdf · uploaded 6 Nov 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form5 Gold.pdf · uploaded 26 Dec 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form-4-Gold.pdf · uploaded 30 Dec 2019View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Gold.pdf · uploaded 6 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGold Completion.pdf · uploaded 15 Jun 2022View

Promoter documents

  • Legal Title reportNew Doc 2017-07-22 (1).pdf · uploaded 22 Jul 2017View
  • Declaration Form Bbbld form b.pdf · uploaded 24 Jul 2017View

Technical documents

  • Building Plan Approvalscan299.pdfView
  • Building Plan ApprovalNew Doc 2017-07-24.pdfView
  • Layout Approvalscan329.pdfView
  • Layout ApprovalNew Doc 2017-07-24.pdfView

Proforma allotment letter

  • Proforma allotment letterGOLD - RERA - MASTER AGREEMENT -.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

905 2 plus 1 plus 2/1

As published on MahaRERA's project page

905 2 plus 1 plus 2/1

Boundaries

North
exisiting Row Houses
South
exisiting Residence
East
18 meter wide DP road
West
open plot and service road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHomework—
Real Estate AgentRameshwar Laxminarayan Bang—
Registered real estate agentRameshwarlaxminarayan BangA51600001199

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology