IDBLD_01115813 floorsCompleted
13Sanctioned habitable floorsregistration certificate
31 Dec 2019Revised completionpromised 31 Dec 2018

Floors

13 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P51600002894 · registered 4 Aug 2017
Promised completion
31 Dec 2018
Revised completion
31 Dec 2019
Sanctioned habitable floors
13

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
3bhk90.1 m² (969 sq.ft)1not published
3bhk90.5 m² (974 sq.ft)1not published
3bhk90.5 m² (974 sq.ft)8not published
3bhk92.1 m² (991 sq.ft)1not published
3bhk92.1 m² (991 sq.ft)2not published
3bhk92.1 m² (992 sq.ft)4not published
3bhk93.4 m² (1,006 sq.ft)1not published
3bhk93.5 m² (1,006 sq.ft)2not published
3bhk93.5 m² (1,006 sq.ft)2not published
3bhk93.5 m² (1,007 sq.ft)2not published
Show all 19 unit typesShow fewer unit types
TypeCarpet areaUnitsBooked
3bhk93.5 m² (1,007 sq.ft)3not published
3bhk93.6 m² (1,007 sq.ft)3not published
3bhk93.6 m² (1,008 sq.ft)1not published
3bhk93.6 m² (1,008 sq.ft)2not published
3bhk94.3 m² (1,015 sq.ft)2not published
3bhk94.7 m² (1,019 sq.ft)1not published
3bhk94.9 m² (1,022 sq.ft)1not published
3bhk95.4 m² (1,026 sq.ft)1not published
3bhk95.5 m² (1,028 sq.ft)2not published
Total40

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered00042
Open Space00027

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)100%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises98%
Show all 11 activitiesShow fewer activities
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%