H-Peral · Anmol Nayantara Gold
Nashik · RERA P51600002894
IDBLD_01115813 floorsCompleted
13Sanctioned habitable floorsregistration certificate
31 Dec 2019Revised completionpromised 31 Dec 2018
Floors
13 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- RERA registration
- P51600002894 · registered 4 Aug 2017
- Promised completion
- 31 Dec 2018
- Revised completion
- 31 Dec 2019
- Sanctioned habitable floors
- 13
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 3bhk | 90.1 m² (969 sq.ft) | 1 | not published |
| 3bhk | 90.5 m² (974 sq.ft) | 1 | not published |
| 3bhk | 90.5 m² (974 sq.ft) | 8 | not published |
| 3bhk | 92.1 m² (991 sq.ft) | 1 | not published |
| 3bhk | 92.1 m² (991 sq.ft) | 2 | not published |
| 3bhk | 92.1 m² (992 sq.ft) | 4 | not published |
| 3bhk | 93.4 m² (1,006 sq.ft) | 1 | not published |
| 3bhk | 93.5 m² (1,006 sq.ft) | 2 | not published |
| 3bhk | 93.5 m² (1,006 sq.ft) | 2 | not published |
| 3bhk | 93.5 m² (1,007 sq.ft) | 2 | not published |
Show all 19 unit typesShow fewer unit types
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 3bhk | 93.5 m² (1,007 sq.ft) | 3 | not published |
| 3bhk | 93.6 m² (1,007 sq.ft) | 3 | not published |
| 3bhk | 93.6 m² (1,008 sq.ft) | 1 | not published |
| 3bhk | 93.6 m² (1,008 sq.ft) | 2 | not published |
| 3bhk | 94.3 m² (1,015 sq.ft) | 2 | not published |
| 3bhk | 94.7 m² (1,019 sq.ft) | 1 | not published |
| 3bhk | 94.9 m² (1,022 sq.ft) | 1 | not published |
| 3bhk | 95.4 m² (1,026 sq.ft) | 1 | not published |
| 3bhk | 95.5 m² (1,028 sq.ft) | 2 | not published |
| Total | 40 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 42 |
| Open Space | 0 | 0 | 0 | 27 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)0%
- Podiums (if any)100%
- Plinth0%
- Stilt Floor100%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
- Sanitary Fittings within the flats / premises98%
Show all 11 activitiesShow fewer activities
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Data through11 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology