L- Quartz · Anmol Nayantara Gold
Nashik · RERA P51600002894
IDBLD_01116112 floorsCompleted
12Sanctioned habitable floorsregistration certificate
31 Dec 2019Revised completionpromised 31 Dec 2018
Floors
12 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- RERA registration
- P51600002894 · registered 4 Aug 2017
- Promised completion
- 31 Dec 2018
- Revised completion
- 31 Dec 2019
- Sanctioned habitable floors
- 12
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1bhk | 49.1 m² (529 sq.ft) | 5 | not published |
| 1bhk | 49.6 m² (534 sq.ft) | 5 | not published |
| 1bhk | 50 m² (538 sq.ft) | 5 | not published |
| 1bhk | 50.5 m² (543 sq.ft) | 5 | not published |
| 2bhk | 74.7 m² (804 sq.ft) | 5 | not published |
| 2bhk | 75.1 m² (808 sq.ft) | 5 | not published |
| 2bhk | 75.4 m² (812 sq.ft) | 5 | not published |
| 2bhk | 75.8 m² (815 sq.ft) | 5 | not published |
| Total | 40 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 9 |
| Open Space | 0 | 0 | 0 | 20 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)0%
- Podiums (if any)0%
- Plinth0%
- Stilt Floor100%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
- Sanitary Fittings within the flats / premises95%
Show all 11 activitiesShow fewer activities
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Data through11 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology
