Vida 56
Deedo IDDP-NSK-4JJBIt is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 11% of its units are booked.
Nashik (M Corp.), Nashik 422005 · by Ananapurna Enterprises Partnership Firm & Other One
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2026, with no extension on record
- This projectRegistered 12 Dec 2019, completion promised 6 Dec 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51600023370
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51600023370 | 12 Dec 2019 | 6 Dec 2026 | 6 Dec 2026 | Ananapurna Enterprises Partnership Firm & Other One | Project page |
Documents153
1 document held by Deedo, 152 filings listed on MahaRERA's project page
Finance
- PAN CardANNPURNA ENTERPRISES.pdf · uploaded 30 Nov 2019Source
Legal
Show all 153 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)655 (1)_page-0001 (1).pdf · uploaded 30 Nov 2019Source
- 1 Building Plan Approval / NA Order for plotted development655 (1)_page-0001 (1).pdf · uploaded 30 Nov 2019Source
- 1 Commencement Certificates / NA Order for plotted development655- Commencement Certificate.pdf · uploaded 30 Nov 2019Source
- 1 Declaration in FORM BVida - 26 -Affidivit Cum Declaration.pdf · uploaded 30 Nov 2019Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form - 1.pdf · uploaded 30 Nov 2019Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2.pdf · uploaded 30 Nov 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ananpurna Enterpirces - Thaker Vida26.pdf · uploaded 30 Nov 2019Source
- 1 Proforma of Allotment letterVIDA RERA AGREEMENT TO SALE DRAFT.pdf · uploaded 30 Nov 2019Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)N M Thakker Thakker Vida26.pdf · uploaded 9 Dec 2019Source
- 1 OtherCertificate.pdf · uploaded 9 Dec 2019Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 14 Aug 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 14 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 14 Aug 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-ANNAPURNA.pdf · uploaded 15 Aug 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-NMT.pdf · uploaded 15 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5-ANNAPURNA.pdf · uploaded 17 Aug 2021Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5-NMT.pdf · uploaded 17 Aug 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 7 Oct 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 7 Oct 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 7 Oct 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 7 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 7 Oct 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 7 Oct 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Annapurna.pdf · uploaded 7 Oct 2021Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 NMT.pdf · uploaded 7 Oct 2021Source
- 3 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Annapurna.pdf · uploaded 7 Oct 2021Source
- 4 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 NMT.pdf · uploaded 7 Oct 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mar 20.pdf · uploaded 7 Feb 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Jun 20.pdf · uploaded 7 Feb 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sept 20.pdf · uploaded 7 Feb 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Dec 20.pdf · uploaded 7 Feb 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mar 21.pdf · uploaded 7 Feb 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Dec 21.pdf · uploaded 7 Feb 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mar 22.pdf · uploaded 7 Feb 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sept 22.pdf · uploaded 7 Feb 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Dec 22.pdf · uploaded 7 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)VIDA26_MAR_2020_c.pdf · uploaded 7 Feb 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)VIDA26_JUN_2020_c.pdf · uploaded 7 Feb 2023Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)VIDA26_SEP_2020_c.pdf · uploaded 7 Feb 2023Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)VIDA26_DEC_2020_c.pdf · uploaded 7 Feb 2023Source
- 7 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)VIDA26_MAR_2021_c.pdf · uploaded 7 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)VIDA26_DEC_2021_c.pdf · uploaded 7 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)VIDA26_MAR_2022_c.pdf · uploaded 7 Feb 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA 26-DEC-2019.pdf · uploaded 14 Feb 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)DEC-2019.pdf · uploaded 14 Feb 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)MAR-2020.pdf · uploaded 14 Feb 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA 26-MAR-2020.pdf · uploaded 14 Feb 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA 26-JUN-2020.pdf · uploaded 14 Feb 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)JUNE-2020.pdf · uploaded 14 Feb 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)SEPT-2020.pdf · uploaded 14 Feb 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA 26-SEPT-2020.pdf · uploaded 14 Feb 2023Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA 26-DEC-2020.pdf · uploaded 14 Feb 2023Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)DEC-2020.pdf · uploaded 14 Feb 2023Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)MAR-2021.pdf · uploaded 14 Feb 2023Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA 26-MAR-2021.pdf · uploaded 14 Feb 2023Source
- 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA 26-DEC-2021.pdf · uploaded 14 Feb 2023Source
- 20 CA Certificate on Project Cost & Fund withdrawal (Form 3)DEC-2021.pdf · uploaded 14 Feb 2023Source
- 21 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA-56-MAR-2022.pdf · uploaded 14 Feb 2023Source
- 22 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA 56-MAR-2022.pdf · uploaded 14 Feb 2023Source
- 23 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA 56-JUN-2022.pdf · uploaded 14 Feb 2023Source
- 24 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA-Form 3-JUN-2022.pdf · uploaded 14 Feb 2023Source
- 25 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA-Form 3-SEPT-2022.pdf · uploaded 14 Feb 2023Source
- 26 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA 56-SEPT-2022.pdf · uploaded 14 Feb 2023Source
- 27 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA 56-DEC-2022.pdf · uploaded 14 Feb 2023Source
- 28 CA Certificate on Project Cost & Fund withdrawal (Form 3)VIDA-Form 3-DEC-2022.pdf · uploaded 14 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5-MAR-2020.pdf · uploaded 14 Feb 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5.pdf · uploaded 14 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5-MAR-2022.pdf · uploaded 14 Feb 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5-JULY-2022.pdf · uploaded 14 Feb 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Jun 22.pdf · uploaded 15 Feb 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)DEC-2019.pdf · uploaded 15 Feb 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)MAR-2020.pdf · uploaded 15 Feb 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)JUN-2020.pdf · uploaded 15 Feb 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)SEP-2020.pdf · uploaded 15 Feb 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)DEC-2020.pdf · uploaded 15 Feb 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)MAR-2021.pdf · uploaded 15 Feb 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)DEC-2021.pdf · uploaded 15 Feb 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)JUN-2022.pdf · uploaded 15 Feb 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)SEP-2022.pdf · uploaded 15 Feb 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)DEC-2022.pdf · uploaded 15 Feb 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Annapurna-VIDA-26-Form -2-Engineer Certificate- March-2022.pdf · uploaded 15 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Annapurna-Engi Cetificate-Form 2A-DEC-2019.pdf · uploaded 15 Feb 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)VIDA-26-Annapurna-Form 2A-Engineer Certificate-Dec-2022.pdf · uploaded 15 Feb 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)VIDA-26-Annapurna-Form 2A-Engineer Certificate-SEPT-2022.pdf · uploaded 15 Feb 2023Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Vida-26-Form 2A-Engineer Certificate-June-2022.pdf · uploaded 16 Feb 2023Source
- 1 Declaration about Commencement CertificateS No 655-Nashik-Declaration about commencemnt certificate VIDA 56.pdf · uploaded 15 Mar 2023Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD DISCLOSURE ANNAPURNA ENTERPRISES.pdf · uploaded 15 Mar 2023Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD DISCLOSURE NM THAKKAR.pdf · uploaded 15 Mar 2023Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 13 Jun 2023Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.pdf · uploaded 13 Jun 2023Source
- 29 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3.pdf · uploaded 13 Jun 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)June-23.pdf · uploaded 31 Aug 2023Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)June-23.pdf · uploaded 31 Aug 2023Source
- 30 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3 - Vida - 56.pdf · uploaded 31 Aug 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 VIDA ANNAPURNA.pdf · uploaded 27 Sep 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 VIDA THAKKER N M.pdf · uploaded 27 Sep 2023Source
- 31 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VIDA CONSO 2023 09 30.pdf · uploaded 21 Nov 2023Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vida 26 - Form 1 - Architect Certificate.pdf · uploaded 7 Dec 2023Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)SEP-2023.pdf · uploaded 7 Dec 2023Source
- 32 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VIDA CONSO 2023 12 31.pdf · uploaded 16 Jan 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)SNo655 Plot No389Architects Certificate DEC.pdf · uploaded 31 Jan 2024Source
- 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)DEC-2023.pdf · uploaded 14 Feb 2024Source
- 33 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VIDA CONSO 2024 03 31.pdf · uploaded 21 May 2024Source
- 20 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 VIDA 2024 03 31_compressed.pdf · uploaded 3 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2-Form No 2A-Certificate No P51600023370 vida.pdf · uploaded 3 Jun 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vida 56-Aslam Kadri Architect Certificate -.pdf · uploaded 22 Jul 2024Source
- 21 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 30-6-2024.pdf · uploaded 22 Jul 2024Source
- 34 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 30 6 2024.pdf · uploaded 22 Jul 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VIDA CONSO 2024 09 30.pdf · uploaded 16 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 30 9 24 VIDA.pdf · uploaded 16 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VIDA CONSO 2024 12 31.pdf · uploaded 28 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 VIDA 2024 12 31.pdf · uploaded 8 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 VIDA 2024 12 31.pdf · uploaded 8 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 03 VIDA 2025 03 31.pdf · uploaded 19 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 VIDA ANNAPURNA 2024 03 31.pdf · uploaded 19 Apr 2025Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 VIDA THAKKER N M 2024 03 31.pdf · uploaded 19 Apr 2025Source
- Form 5 (FY 2024-2025)Form 5 Final.pdf · uploaded 27 Nov 2025Source
- Form 1Form 1.pdf · uploaded 4 Dec 2025Source
- Form 2Form 2.pdf · uploaded 4 Dec 2025Source
- Form 3Form 3.pdf · uploaded 4 Dec 2025Source
- Disclosure of Sold and Booked InventoryVida 56-sold unsold.pdf · uploaded 4 Dec 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 4 Dec 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 4 Dec 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 4 Dec 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 4 Dec 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 4 Dec 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 4 Dec 2025Source
- Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 4 Dec 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 10 Mar 2026Source
- Withdrawal Update Form 2form 2.pdf · uploaded 10 Mar 2026Source
- Withdrawal Update Form 3Form 3_final.pdf · uploaded 10 Mar 2026Source
- Withdrawal Update Form 1Form 1_11zon.pdf · uploaded 12 May 2026Source
- Withdrawal Update Form 2Form 2_11zon.pdf · uploaded 12 May 2026Source
- Withdrawal Update Form 3Form 3 _11zon.pdf · uploaded 12 May 2026Source
- Form 2A (FY 2025-2026)Vida-56-Form2A-Engineering Certificate-dtd-31-03-2026.pdf · uploaded 6 Jul 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 30 Jul 2026Source
Technical
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 655/1/1/5PLUS6/9/3PLUS4/C
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK57 units in all
- Address
- 655/1/1/5PLUS6/9/3PLUS4/C, Gangapur Road, Pandit ColonyPIN 422005
- Village
- Nashik (M Corp.), Nashik taluka
- Land area for this project
- 2,535 sq m (27,281 sq ft)
- Permissible built-up area
- 8,110 sq m (87,300 sq ft)
- Sanctioned built-up area
- 8,110 sq m (87,300 sq ft)
- Designated bank account
- 88
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
655/1/1/5PLUS6/9/3PLUS4/C
Boundaries
- North
- Plot 1 Oblic 7
- South
- S No 656
- East
- Plot 10 Plus 4 B
- West
- Plot 3 B Plus A
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking57 units
6 of 57 units booked (11%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building A | 2BHK | 81.72 sq m · 880 sq ft | 14 | 3 |
| Building A | 3BHK | 32.56 sq m · 350 sq ft | 1 | 0 |
| Building A | 3BHK | 115.9 sq m · 1,248 sq ft | 11 | 0 |
| Building A | 3BHK | 130.98 sq m · 1,410 sq ft | 14 | 3 |
| Building B | 2BHK | 81.72 sq m · 880 sq ft | 1 | 0 |
| Building B | 3BHK | 98.42 sq m · 1,059 sq ft | 1 | 0 |
| Building B | 3BHK | 115.9 sq m · 1,248 sq ft | 2 | 0 |
| Building B | 3BHK | 130.98 sq m · 1,410 sq ft | 13 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Morphosis Architects | — |
| Architect | Morphosis Arch Morphosis Architects Old | — |
| Chartered accountant | Anand Rathi & Associates | — |
| Engineer | Prashant Patil | — |
| Engineer | Sunil Ghodke | — |
| Other | Self | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Nashik (M Corp.)
- Mangalam HeightsRERA PR1220002602677
- Raghunandan ParkRERA PR1220002602623
- Shree Dattaraaj LandmarkRERA PM1220002602483
- Shree Laxmi NarayanRERA PR1220002602337
- Padmashree ParkRERA PR1220002601963
- Samruddhi SquareRERA PR1220002601479
- Premsagar Co-Op Hsg SocietyRERA PR1220002601431
- AagamRERA PR1220002601358