Nashik (M Corp.), Nashik 422006 |Promoter: Amma Builders And Developers

Residential / Group HousingRERAP51600011883
31 Aug 2017Registered with MahaRERA
30 Jun 2018Promised completion
30 Jun 2019Revised completionPushed back 1 year
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
664 sq m (7,147 sq ft)
Permissible built-up area
926 sq m (9,971 sq ft)
Sanctioned built-up area
926 sq m (9,971 sq ft)
Address
7/117PIN 422006
Designated bank account
Bank Of Baroda
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 17.28342, 74.18565
Ozone is at latitude 17.28342, longitude 74.18565.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 7 years and 4 months ago.

Registered
31 Aug 2017
Promised
30 Jun 2018
Revised
30 Jun 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001188331 Aug 201730 Jun 201830 Jun 2019Amma Builders And DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Ozone5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Ozone

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCORPORATION100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMPLETED100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalCOMPLETED100%
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationCOMPLETED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 23 filings listed on MahaRERA's project page

Title report

Commencement certificate

Encumbrance details

Form 1

Form 2

Form B

Registration certificate

Extension certificate

Show all 44 documentsShow fewer documents

Occupancy / completion certificate

  • Occupancy / completion certificate1 Jun 2021ViewSource

Form 4

Other (8)

Layout plan

Building plan

Allotment letter

Document library

  • Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 30 Jul 2017View
  • Copy of the legal title reportTITLE REPORT.pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)Commencement drawing.pdf · uploaded 30 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout plan.pdf · uploaded 30 Jul 2017View
  • Details of encumbrancesDetail of encumbrance.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)From 1.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEERS CERTIFICATE298.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterAL AND ATS.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BFORM B.pdf · uploaded 28 Aug 2017View
  • OtherBuilder clarification of completion.pdf · uploaded 15 May 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOzone Completion 1.pdf · uploaded 1 Jun 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 of architect.pdf · uploaded 1 Jun 2021View
  • Status of Conveyance1 TO 6.pdf · uploaded 5 Sep 2021View
  • Status of Conveyance7 TO 13.pdf · uploaded 5 Sep 2021View
  • Status of Conveyance14 TO 21.pdf · uploaded 5 Sep 2021View
  • Status of Conveyance22 TO 29.pdf · uploaded 5 Sep 2021View
  • Status of Conveyance30 TO 33.pdf · uploaded 5 Sep 2021View

Promoter documents

  • Legal Title reportTITLE REPORT.pdf · uploaded 30 Jul 2017View
  • Declaration Form BFORM B.pdf · uploaded 28 Aug 2017View

Technical documents

  • Building Plan ApprovalCommencement drawing.pdfView
  • Layout ApprovalLayout plan.pdfView

Other legal documents

  • OtherBuilder clarification of completion.pdfView

Proforma allotment letter

  • Proforma allotment letterAL AND ATS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

7/117

As published on MahaRERA's project page

7/117

Boundaries

North
Adj Plot No 2 And 3
South
Adj Plot No 19 And 21
East
Colony Road
West
Adj Plot No 18

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAli Munir Khan—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology