Olive Arcade

Completed

Nashik (M Corp.), Nashik 422011 |Promoter: Smb Developers & Contractors

Residential / Group HousingRERAP51600004778
9 Aug 2017Registered with MahaRERA
31 Aug 2019Promised completion
1Building
1Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential1 unit in all
Land area for this project
900 sq m (9,688 sq ft)
Permissible built-up area
1,808 sq m (19,460 sq ft)
Sanctioned built-up area
1,808 sq m (19,460 sq ft)
Address
Survey No-842/3/2, Plot No-2PIN 422011
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.96749, 79.29383
Olive Arcade is at latitude 19.96749, longitude 79.29383.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Aug 2019

The latest completion date on record passed 7 years and 2 months ago.

Registered
9 Aug 2017
Promised
31 Aug 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P516000047789 Aug 201731 Aug 2019—Smb Developers & ContractorsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Olive Arcade101

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

1 unit registered

Residential · 1 unit
TypeCarpet areaUnits
Residential1,821.3 sq m · 19,604 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000013
Open Space000014

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Olive Arcade

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply00%
  • Sewerage (Chamber, Lines, Septic Tank , STP)00%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting00%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirements00%
  • Electrical meter room, sub-station, receiving station00%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking00%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 17 filings listed on MahaRERA's project page

Title report

Commencement certificate

Form B

Allotment letter (2)

Encumbrance details

Form 1

Form 2

Show all 31 documentsShow fewer documents

Registration certificate

Form 5

Occupancy / completion certificate

  • Occupancy / completion certificate2 Nov 2021ViewSource

Other (2)

Layout plan

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 27 Jul 2017View
  • Proforma of Allotment letterAgreement.pdf · uploaded 27 Jul 2017View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 27 Jul 2017View
  • Declaration in FORM BAFFIDAVIT-SMB-min.pdf · uploaded 27 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 27 Jul 2017View
  • Building Plan Approval (IOD)Plan.pdf · uploaded 27 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 28 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 28 Jul 2017View
  • Details of encumbrancesNO LOANSMB.pdf · uploaded 28 Jul 2017View
  • Copy of Layout Approval (in case of layout)Plan.pdf · uploaded 28 Jul 2017View
  • Certificates of CA (Form 5)SMB Form 5 RERA 31032018.pdf · uploaded 12 Dec 2018View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentSMB completion certf.pdf · uploaded 2 Nov 2021View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 27 Jul 2017View
  • Declaration Form BAFFIDAVIT-SMB-min.pdf · uploaded 27 Jul 2017View

Technical documents

  • Layout ApprovalPlan.pdfView
  • Building Plan ApprovalPlan.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

PLOT NO2SURVEY NO842/3/2

As published on MahaRERA's project page

SURVEY NO-842/3/2,PLOT NO-2

Boundaries

North
Road
South
Open Land
East
Open Land
West
Open Land

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPankaj Jadhav—
EngineerPrasanna Bhore—
OtherBhavesh Pokar—
OtherMehul Shankarlal Patel—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology