Skip to content
Completed2 floorsRERA P51600015818

Type A, Aadinath Park

Deedo IDDP-NSK-P7JS-A

MahaRERA has not published a flat-by-flat record for this tower, and no registered deed names it yet.

All of Aadinath Park
Median saleNot on recordneeds 3 or more sales
Completion9 Mar 2019as registered
Units & parking in Type A
TypeCarpet areaUnitsBooked
ROW HOUSE46.5 m² (501 sq.ft)4Not on record
ROW HOUSE48.2 m² (519 sq.ft)1Not on record
ROW HOUSE48.3 m² (519 sq.ft)1Not on record
SHOP12.2 m² (131 sq.ft)4Not on record
SHOP12.4 m² (133 sq.ft)1Not on record
SHOP12.7 m² (136 sq.ft)1Not on record

Parking: Closed/Covered 0 · Open Space 0 (as declared to MahaRERA)

Construction progress (declared)

Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
As registered with MahaRERA
RERA registration
P51600015818 · registered 27 Mar 2018
Promised completion
9 Mar 2019
Sanctioned habitable floors
2
Deedo ID
DP-NSK-P7JS-A
Questions about Type A

When is Type A due for completion?

The MahaRERA registration promises 9 Mar 2019.

How many floors does Type A have?

2 sanctioned habitable floors, as registered with MahaRERA.

Data through11 Oct 2026SourcesMahaRERA registration and project page · IGR Maharashtra Index IIFloors and units are as registered; a promoter can revise them in later filings. Party names appear only inside an unlocked Index II.Report a problemMethodology