Raj Residency H

Completed

Nanded Waghala (M Corp.), Nanded 431605 |Promoter: Mr Sanjay Balaprasad Biyani

Residential / Group HousingRERAP51100006613
14 Aug 2017Registered with MahaRERA
22 Oct 2018Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential0 units in all
Land area for this project
951 sq m (10,237 sq ft)
Permissible built-up area
1,715 sq m (18,461 sq ft)
Sanctioned built-up area
1,105 sq m (11,895 sq ft)
Address
Cts No 10282PIN 431605
Designated bank account
The Shamrao Vithal Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.27155, 72.96377
Raj Residency H is at latitude 19.27155, longitude 72.96377.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 22 Oct 2018

The latest completion date on record passed 8 years ago.

Registered
14 Aug 2017
Promised
22 Oct 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5110000661314 Aug 201722 Oct 2018—Mr Sanjay Balaprasad BiyaniProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Raj Residency H60

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Residential · 0 units
TypeCarpet areaUnits
Residential1,035.33 sq m · 11,144 sq ft0

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Raj Residency H

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure80%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBORE WEEL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEWERAGE LINE100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWORK IN PROGRESS25%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsWORK NOT STARTED0%
  • Electrical meter room, sub-station, receiving stationWORK IN PROGRESS0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • STAIR CASE PASSAGEWORK IN PROGRESS50%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

13 documents held by Deedo, 16 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title report007.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)007.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)imagetopdf(8).pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)007.pdf · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentUntitled-11.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM Bimagetopdf(10).pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterUntitled-11.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesUntitled-14.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)007.pdf · uploaded 31 Jul 2017View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentRAJ H.pdf · uploaded 14 Jan 2020View
  • Architect’s Certificate on Completion of Project (Form 4)RAJ H.pdf · uploaded 14 Jan 2020View

Promoter documents

  • Legal Title report007.pdf · uploaded 31 Jul 2017View
  • Declaration Form Bimagetopdf(10).pdf · uploaded 31 Jul 2017View

Technical documents

  • Building Plan Approval007.pdfView
  • Layout Approval007.pdfView

Proforma allotment letter

  • Proforma allotment letterUntitled-11.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nanded Waghala (M Corp.), Nanded taluka

Survey, CTS, gat or plot numbers

10282CTS NO 10282

As published on MahaRERA's project page

CTS NO 10282

Boundaries

North
Nandigram Socity
South
14 110
East
Road
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Ganesh More—
EngineerPankaj Zaware—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology