Manthan Park
Completion was pushed back 6 years and 6 months, to Mar 2029; no MahaRERA orders on record.
Nanded Waghala (M Corp.), Nanded 431601 · Promoter: United Buildcon
Completion was pushed back 6 years and 6 months, to Mar 2029
- This projectRegistered 17 Sep 2020, completion promised 30 Sep 2022, revised to 31 Mar 2029.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- Bhagyashree6 floors · 40 units
- Pragati6 floors · 40 units
- Vaishanvi7 floors · 47 units
- Yash7 floors · 47 units
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51100026409
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51100026409 | 17 Sep 2020 | 30 Sep 2022 | 31 Mar 2029 | United Buildcon | Project page |
Documents199
2 documents held by Deedo, 197 filings listed on MahaRERA's project page
Finance
- PAN CardD Pan of Firm.pdf · uploaded 27 Jun 2019Source
Legal
- Declaration Form BA Form B.pdf · uploaded 26 Jun 2019Source
- Legal Title reportViksan karar nama orig 1-10.pdf · uploaded 27 Jun 2019Source
- Legal Title reportViksan karar nama orig 11-20.pdf · uploaded 27 Jun 2019Source
- Legal Title reportViksan karar nama orig 21-30.pdf · uploaded 27 Jun 2019Source
- Legal Title reportViksan karar nama orig 31-40.pdf · uploaded 27 Jun 2019Source
Show all 199 documentsShow fewer documents
Legal
- Legal Title reportViksan karar nama orig 41-44.pdf · uploaded 27 Jun 2019Source
- Othersearch report manthan.pdf · uploaded 5 Jul 2019Source
- Legal Title reportsearch report manthan.pdf · uploaded 5 Jul 2019Source
- OtherConsent Letter.pdf · uploaded 13 Mar 2023Source
- Declaration Form BAffidavit Cum Declaration FORM B.pdf · uploaded 13 May 2025Source
- Declaration Form BAffidavit Cum Declaration Society.pdf · uploaded 13 May 2025Source
- Declaration Form BAffidavit Cum Declaration FORM B.pdf · uploaded 13 May 2025Source
- Declaration Form BAffidavit Cum Declaration Society.pdf · uploaded 13 May 2025Source
Migrated
- 1 Details of encumbrancesC encumbrance cert.pdf · uploaded 26 Jun 2019Source
- 1 Building Plan Approval (IOD)13 Building Approval Plan.pdf · uploaded 26 Jun 2019Source
- 1 Declaration in FORM BA Form B.pdf · uploaded 26 Jun 2019Source
- 1 PAN CardD Pan of Firm.pdf · uploaded 27 Jun 2019Source
- 1 Copy of the legal title reportViksan karar nama orig 1-10.pdf · uploaded 27 Jun 2019Source
- 2 Copy of the legal title reportViksan karar nama orig 11-20.pdf · uploaded 27 Jun 2019Source
- 3 Copy of the legal title reportViksan karar nama orig 21-30.pdf · uploaded 27 Jun 2019Source
- 4 Copy of the legal title reportViksan karar nama orig 31-40.pdf · uploaded 27 Jun 2019Source
- 5 Copy of the legal title reportViksan karar nama orig 41-44.pdf · uploaded 27 Jun 2019Source
- 1 Copy of Layout Approval (in case of layout)12 LAYOUT MERGE.pdf · uploaded 27 Jun 2019Source
- 6 Copy of the legal title reportsearch report manthan.pdf · uploaded 5 Jul 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentcommencement letter for manthan.pdf · uploaded 5 Jul 2019Source
- 1 Certificates of CA (Form 3)Final CA certificate page.pdf · uploaded 5 Jul 2019Source
- 1 Othersearch report manthan.pdf · uploaded 5 Jul 2019Source
- 1 Proforma of Allotment letterAllotment Letter and Agreement For Sale.pdf · uploaded 13 Jul 2019Source
- 1 Declaration about Commencement CertificateDeclaration about commencement.pdf · uploaded 4 Mar 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineers Certificate 2020.pdf · uploaded 9 Mar 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineers Certificate 2021.pdf · uploaded 9 Mar 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineers Certificate 2022.pdf · uploaded 9 Mar 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory.pdf · uploaded 13 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)RERA Audit Form 5 2018-19.pdf · uploaded 13 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)RERA Audit Form 5 2019-20.pdf · uploaded 13 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)RERA Audit Form 5 2020-21.pdf · uploaded 13 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)RERA Audit Form 5 2021-22.pdf · uploaded 13 Mar 2023Source
- 2 OtherConsent Letter.pdf · uploaded 13 Mar 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)2018-19.pdf · uploaded 18 May 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2019-2020.pdf · uploaded 18 May 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)2020-2021.pdf · uploaded 18 May 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Dec 2021.pdf · uploaded 18 May 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mar 2022.pdf · uploaded 18 May 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)June 2022.pdf · uploaded 18 May 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sept 2022.pdf · uploaded 18 May 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)2018-2019.pdf · uploaded 18 May 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2019-2020.pdf · uploaded 18 May 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)2020-2021.pdf · uploaded 18 May 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 2021.pdf · uploaded 18 May 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Mar 2022.pdf · uploaded 18 May 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)June 2022.pdf · uploaded 18 May 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sept 2022.pdf · uploaded 18 May 2023Source
- 2 Certificates of CA (Form 3)2018-2019.pdf · uploaded 18 May 2023Source
- 3 Certificates of CA (Form 3)2019-2020.pdf · uploaded 18 May 2023Source
- 4 Certificates of CA (Form 3)2020-2021.pdf · uploaded 18 May 2023Source
- 5 Certificates of CA (Form 3)Dec 2021.pdf · uploaded 18 May 2023Source
- 6 Certificates of CA (Form 3)Mar 2022.pdf · uploaded 18 May 2023Source
- 7 Certificates of CA (Form 3)June 2022.pdf · uploaded 18 May 2023Source
- 8 Certificates of CA (Form 3)Sept 2022.pdf · uploaded 18 May 2023Source
- 1 Certificates of CA (Form 3)FORM-3 DEC22_001_compressed.pdf · uploaded 17 Apr 2025Source
- 2 Certificates of CA (Form 3)FORM-3 MARCH23_001_compressed.pdf · uploaded 17 Apr 2025Source
- 3 Certificates of CA (Form 3)FORM-3 JUN23_001_compressed.pdf · uploaded 17 Apr 2025Source
- 4 Certificates of CA (Form 3)FORM-3 SEP23_001_compressed.pdf · uploaded 17 Apr 2025Source
- 5 Certificates of CA (Form 3)FORM-3 DEC23_001_compressed.pdf · uploaded 17 Apr 2025Source
- 6 Certificates of CA (Form 3)FORM-3 MARCH24_001_compressed.pdf · uploaded 17 Apr 2025Source
- 7 Certificates of CA (Form 3)FORM-3 JUN24_001_compressed.pdf · uploaded 17 Apr 2025Source
- 8 Certificates of CA (Form 3)FORM-3 SEP24_001_compressed.pdf · uploaded 17 Apr 2025Source
- 9 Certificates of CA (Form 3)FORM-3 DEC24_001_compressed.pdf · uploaded 17 Apr 2025Source
- 10 Certificates of CA (Form 3)FORM-3 MARCH25_001_compressed.pdf · uploaded 17 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 23.pdf · uploaded 10 May 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Mar 23.pdf · uploaded 10 May 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 5 22-23.pdf · uploaded 10 May 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 23.pdf · uploaded 10 May 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 23.pdf · uploaded 10 May 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2 Dec 23.pdf · uploaded 10 May 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2 March 24.pdf · uploaded 10 May 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2 June 24.pdf · uploaded 10 May 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 24.pdf · uploaded 10 May 2025Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2 Dec 24.pdf · uploaded 10 May 2025Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 25.pdf · uploaded 10 May 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 22.pdf · uploaded 12 May 2025Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 25.pdf · uploaded 12 May 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 24.pdf · uploaded 12 May 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 24.pdf · uploaded 12 May 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 24.pdf · uploaded 12 May 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 24.pdf · uploaded 12 May 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec23.pdf · uploaded 12 May 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 23.pdf · uploaded 12 May 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 23.pdf · uploaded 12 May 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 23.pdf · uploaded 12 May 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentUB PERMISSION PRAGATI AND BHAGYASHRI.pdf · uploaded 12 May 2025Source
- 1 Building Plan Approval (IOD)block 1_11zon.pdf · uploaded 12 May 2025Source
- 2 Building Plan Approval (IOD)block 2_11zon.pdf · uploaded 12 May 2025Source
- 3 Building Plan Approval (IOD)block 3_11zon.pdf · uploaded 12 May 2025Source
- 4 Building Plan Approval (IOD)block 4_11zon.pdf · uploaded 12 May 2025Source
- 1 Disclosure of sold/ booked inventoryDiscloure Of Sold Inventory.pdf · uploaded 12 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Adobe Scan 12 May 2025.pdf · uploaded 12 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM2A_001.pdf · uploaded 12 May 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM2A_003.pdf · uploaded 12 May 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 22.pdf · uploaded 12 May 2025Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 25.pdf · uploaded 12 May 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 24.pdf · uploaded 12 May 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 24.pdf · uploaded 12 May 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 24.pdf · uploaded 12 May 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 24.pdf · uploaded 12 May 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec23.pdf · uploaded 12 May 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 23.pdf · uploaded 12 May 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 23.pdf · uploaded 12 May 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 23.pdf · uploaded 12 May 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentUB PERMISSION PRAGATI AND BHAGYASHRI.pdf · uploaded 12 May 2025Source
- 1 Building Plan Approval (IOD)block 1_11zon.pdf · uploaded 12 May 2025Source
- 2 Building Plan Approval (IOD)block 2_11zon.pdf · uploaded 12 May 2025Source
- 3 Building Plan Approval (IOD)block 3_11zon.pdf · uploaded 12 May 2025Source
- 4 Building Plan Approval (IOD)block 4_11zon.pdf · uploaded 12 May 2025Source
- 1 Disclosure of sold/ booked inventoryDiscloure Of Sold Inventory.pdf · uploaded 12 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Adobe Scan 12 May 2025.pdf · uploaded 12 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM2A_001.pdf · uploaded 12 May 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM2A_003.pdf · uploaded 12 May 2025Source
- 1 Declaration in FORM BAffidavit Cum Declaration FORM B.pdf · uploaded 13 May 2025Source
- 2 Declaration in FORM BAffidavit Cum Declaration Society.pdf · uploaded 13 May 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure Of Sold-booked Inventory.pdf · uploaded 13 May 2025Source
- 1 Other – TechnicalDeclaration cum Undertaking softcopy.pdf · uploaded 13 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 13 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 23-24.pdf · uploaded 13 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)Form 5 24-25.pdf · uploaded 13 May 2025Source
- 1 Declaration in FORM BAffidavit Cum Declaration FORM B.pdf · uploaded 13 May 2025Source
- 2 Declaration in FORM BAffidavit Cum Declaration Society.pdf · uploaded 13 May 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure Of Sold-booked Inventory.pdf · uploaded 13 May 2025Source
- 1 Other – TechnicalDeclaration cum Undertaking softcopy.pdf · uploaded 13 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 13 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 23-24.pdf · uploaded 13 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)Form 5 24-25.pdf · uploaded 13 May 2025Source
- 1 Building Plan Approval (IOD)B1-B2.pdf · uploaded 16 May 2025Source
- 2 Building Plan Approval (IOD)A1-A2.pdf · uploaded 16 May 2025Source
- Withdrawal Update Form 1Archiects Certificate.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 1Form 1- Architecture Certificate June 25.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 2Engineer Certificate_compressed.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 2Form_2_-_Engineer_Certificate_Jun.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 3Form-3_002.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 3Form 3 Q1 25-26 new_compressed.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 1Form-1 Q2 FY 25-26.pdf · uploaded 23 May 2026Source
- Withdrawal Update Form 1From-1 Q3 FY 25-26.pdf · uploaded 23 May 2026Source
- Withdrawal Update Form 2From-2 Q2 FY25-26.pdf · uploaded 23 May 2026Source
- Withdrawal Update Form 2Form-2 Q3 FY 25-26.pdf · uploaded 23 May 2026Source
- Withdrawal Update Form 3Form 3-_007_compressed.pdf · uploaded 23 May 2026Source
- Withdrawal Update Form 3Form 3 Q3 FY 25-26 Final.pdf · uploaded 23 May 2026Source
- Withdrawal Update Form 1Withdrawal Application Form1 Q1.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 2Withdrawal Application Form2 Q1_compressed.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 3Withdrawal Application Form3 (10).pdf · uploaded 21 Aug 2026Source
Technical
- Document13 Building Approval Plan.pdf · uploaded 26 Jun 2019Source
- Document12 LAYOUT MERGE.pdf · uploaded 27 Jun 2019Source
- Documentblock 1_11zon.pdf · uploaded 12 May 2025Source
- Documentblock 2_11zon.pdf · uploaded 12 May 2025Source
- Documentblock 3_11zon.pdf · uploaded 12 May 2025Source
- Documentblock 4_11zon.pdf · uploaded 12 May 2025Source
- Documentblock 1_11zon.pdf · uploaded 12 May 2025Source
- Documentblock 2_11zon.pdf · uploaded 12 May 2025Source
- Documentblock 3_11zon.pdf · uploaded 12 May 2025Source
- Documentblock 4_11zon.pdf · uploaded 12 May 2025Source
- Other – TechnicalDeclaration cum Undertaking softcopy.pdf · uploaded 13 May 2025Source
- Other – TechnicalDeclaration cum Undertaking softcopy.pdf · uploaded 13 May 2025Source
- DocumentB1-B2.pdf · uploaded 16 May 2025Source
- DocumentA1-A2.pdf · uploaded 16 May 2025Source
Technical (Architect)
- DocumentForm 1 March 23.pdf · uploaded 12 May 2025Source
- DocumentForm 1 Dec 22.pdf · uploaded 12 May 2025Source
- DocumentForm 1 June 23.pdf · uploaded 12 May 2025Source
- DocumentForm 1 Sep 23.pdf · uploaded 12 May 2025Source
- DocumentForm 1 Dec23.pdf · uploaded 12 May 2025Source
- DocumentForm 1 March 24.pdf · uploaded 12 May 2025Source
- DocumentForm 1 June 24.pdf · uploaded 12 May 2025Source
- DocumentForm 1 Sep 24.pdf · uploaded 12 May 2025Source
- DocumentForm 1 Dec 24.pdf · uploaded 12 May 2025Source
- DocumentForm 1 March 25.pdf · uploaded 12 May 2025Source
- DocumentForm 1 March 23.pdf · uploaded 12 May 2025Source
- DocumentForm 1 Dec 22.pdf · uploaded 12 May 2025Source
- DocumentForm 1 June 23.pdf · uploaded 12 May 2025Source
- DocumentForm 1 Sep 23.pdf · uploaded 12 May 2025Source
- DocumentForm 1 Dec23.pdf · uploaded 12 May 2025Source
- DocumentForm 1 March 24.pdf · uploaded 12 May 2025Source
- DocumentForm 1 June 24.pdf · uploaded 12 May 2025Source
- DocumentForm 1 Sep 24.pdf · uploaded 12 May 2025Source
- DocumentForm 1 Dec 24.pdf · uploaded 12 May 2025Source
- DocumentForm 1 March 25.pdf · uploaded 12 May 2025Source
- DocumentWithdrawal Application Form1 Q1.pdf · uploaded 21 Aug 2026Source
Technical (Engineer)
- DocumentForm 2 Dec 23.pdf · uploaded 10 May 2025Source
- DocumentForm 2 Mar 23.pdf · uploaded 10 May 2025Source
- DocumentForm 5 22-23.pdf · uploaded 10 May 2025Source
- DocumentForm 2 June 23.pdf · uploaded 10 May 2025Source
- DocumentForm 2 Sep 23.pdf · uploaded 10 May 2025Source
- DocumentFrom 2 Dec 23.pdf · uploaded 10 May 2025Source
- DocumentFrom 2 March 24.pdf · uploaded 10 May 2025Source
- DocumentFrom 2 June 24.pdf · uploaded 10 May 2025Source
- DocumentForm 2 Sep 24.pdf · uploaded 10 May 2025Source
- DocumentFrom 2 Dec 24.pdf · uploaded 10 May 2025Source
- DocumentForm 2 March 25.pdf · uploaded 10 May 2025Source
- DocumentWithdrawal Application Form2 Q1_compressed.pdf · uploaded 21 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals62/3
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —174 units in all
- Address
- 62/3, Mouje Vazirabad, NandedPIN 431601
- Village
- Nanded Waghala (M Corp.), Nanded taluka
- Location
- 19.15315, 77.31098
- Designated bank account
- 28
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- Other Layout
- South
- Other Layout
- East
- Other Layout
- West
- 9 M Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking174 units
174 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| Bhagyashree | — | — | 40 |
| Pragati | — | — | 40 |
| Vaishanvi | — | — | 47 |
| Yash | — | — | 47 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals8
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ashish S Bhandge | — |
| Architect | satish chitalkar | — |
| Chartered accountant | Atul Dhoot | — |
| Chartered accountant | Mayur Praful Agrawal | — |
| Chartered accountant | sarfaraz naviwala | — |
| Engineer | Satish Chitalkar | — |
| Engineer | Satyanarayan S Dudhmal | — |
| Other | satish chitalkar | — |
Source: MahaRERA project page. Contact details are not shown.