D L Infra

Completed

Nanded Waghala (M Corp.), Nanded 431601 |Promoter: Gautam Suresh Nagda

14 Sep 2017Registered with MahaRERA
3 Sep 2019Promised completion
1Building
1Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
Comm residential1 unit in all
Land area for this project
441 sq m (4,751 sq ft)
Permissible built-up area
741 sq m (7,977 sq ft)
Sanctioned built-up area
491 sq m (5,284 sq ft)
Address
48, 51PIN 431601
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.16784, 77.32670
D L Infra is at latitude 19.16784, longitude 77.32670.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 3 Sep 2019

The latest completion date on record passed 7 years and 1 month ago.

Registered
14 Sep 2017
Promised
3 Sep 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5110001312314 Sep 20173 Sep 2019—Gautam Suresh NagdaProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
D L Infra Kalyan61

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

1 unit registered

Comm residential · 1 unit
TypeCarpet areaUnits
Comm residential317.08 sq m · 3,413 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

D L Infra Kalyan

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
  • Sanitary Fittings within the flats / premises50%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBORE WELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEWERAGE TANK100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWORK IN PROGRESS75%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsWORK NOT STARTED0%
  • Electrical meter room, sub-station, receiving stationWORK IN PROGRESS76%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingWORK IN PROGRESS75%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

11 documents held by Deedo, 15 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Details of encumbrances20170828042134.pdf · uploaded 28 Aug 2017View
  • Copy of Layout Approval (in case of layout)20170828042158.pdf · uploaded 28 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)20170828042240.pdf · uploaded 28 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)20170828042306.pdf · uploaded 28 Aug 2017View
  • Declaration in FORM B20170828042355-ilovepdf-compressed (1).pdf · uploaded 28 Aug 2017View
  • Copy of the legal title report20170828041944 new.pdf · uploaded 28 Aug 2017View
  • Building Plan Approval (IOD)APP.pdf · uploaded 28 Aug 2017View
  • Proforma of Allotment letterLE.pdf · uploaded 28 Aug 2017View
  • Architect’s Certificate on Completion of Project (Form 4)NDEVE.pdf · uploaded 27 Aug 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentNDEVE.pdf · uploaded 27 Aug 2020View

Promoter documents

  • Declaration Form B20170828042355-ilovepdf-compressed (1).pdf · uploaded 28 Aug 2017View
  • Legal Title report20170828041944 new.pdf · uploaded 28 Aug 2017View

Technical documents

  • Layout Approval20170828042158.pdfView
  • Building Plan ApprovalAPP.pdfView

Proforma allotment letter

  • Proforma allotment letterLE.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nanded Waghala (M Corp.), Nanded taluka

Survey, CTS, gat or plot numbers

4851

As published on MahaRERA's project page

48,51

Boundaries

North
14 M Wide Road
South
Plot No 49
East
30 M Wide Road
West
Plot No 61

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Ganesh S More—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology