Deedo IDDP-NGP-4GMRMahaRERA shows it completed; no MahaRERA orders on record; 94% of its units are booked.
Pipla, Nagpur 440034 · by Luxora Infrastructure Private Limited · 46% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 19 Aug 2020, completion promised 30 Mar 2024.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP50500026092
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P50500026092 | 19 Aug 2020 | 30 Mar 2024 | 30 Mar 2024 | Luxora Infrastructure Private Limited | Project page |
Documents159
56 documents held by Deedo, 103 filings listed on MahaRERA's project page
Show all 159 documentsShow fewer documents
Layout plan (23)
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
Encumbrance details
- Encumbrance detailsDate not statedView
Form 1 (23)
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
Legal
- OtherDisclosure_Aspen.pdf · uploaded 21 Jul 2020View
- Declaration Form BForm_B_Aspen.pdf · uploaded 21 Jul 2020Source
- Legal Title reportAspen and Birch Legal Title compressed.pdf · uploaded 12 Aug 2020Source
- Legal Title reportAspen_Birch_Diamond Leaf Title PDF_compressed.pdf · uploaded 9 Sep 2020View
- Legal Title reportApen Birch Title Certificate Revised__compressed_11_Nov_2020.pdf · uploaded 11 Nov 2020View
Migrated
- 1 PAN CardLIPL PAN_Aspen.pdf · uploaded 21 Jul 2020Source
- 1 Details of encumbrancesEncumbrance Aspen.pdf · uploaded 21 Jul 2020View
- 1 Copy of Layout Approval (in case of layout)Annexure_Layout Approval for Aspen.pdf · uploaded 21 Jul 2020View
- 2 Copy of Layout Approval (in case of layout)IOD_ Aspen_Compressed.pdf · uploaded 21 Jul 2020View
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_Aspen.pdf · uploaded 21 Jul 2020Source
- 1 Declaration in FORM BForm_B_Aspen.pdf · uploaded 21 Jul 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aspen Engineer's Certificate_compressed.pdf · uploaded 21 Jul 2020View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE- ASPEN compressed.pdf · uploaded 21 Jul 2020Source
- 1 OtherDisclosure_Aspen.pdf · uploaded 21 Jul 2020View
- 1 Proforma of Allotment letterFSA_TH_Value_Homes_24_July_2020_final.pdf · uploaded 24 Jul 2020View
- 1 Copy of the legal title reportAspen and Birch Legal Title compressed.pdf · uploaded 12 Aug 2020Source
- 1 Building Plan Approval / NA Order for plotted development2-BHK_Bldgno-12-13-14_GF-1st-2nd-3rd-Siteplan-Sec-Ele-compressed 1.pdf · uploaded 12 Aug 2020View
- 2 Building Plan Approval / NA Order for plotted development2-BHK_Bldgno-12-13-14_4th-5th-6th-7th-Park-Areacal-Siteplan-compressed.pdf · uploaded 12 Aug 2020View
- 2 Copy of the legal title reportAspen_Birch_Diamond Leaf Title PDF_compressed.pdf · uploaded 9 Sep 2020View
- 2 Commencement Certificates / NA Order for plotted developmentJul_2020_Final Approval for Township from Collector_CC_Aspen_compressed.pdf · uploaded 12 Sep 2020Source
- 3 Copy of the legal title reportApen Birch Title Certificate Revised__compressed_11_Nov_2020.pdf · uploaded 11 Nov 2020View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Aspen 31-03-21_compressed.pdf · uploaded 4 Aug 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen 31-03-21_compressed.pdf · uploaded 4 Aug 2021View
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert_Aspen_Mar_21.pdf · uploaded 20 Aug 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert_sep 21_Aspen_compressed.pdf · uploaded 11 Nov 2021View
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aspen Sep 21_compressed.pdf · uploaded 2 Dec 2021View
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Sep_21.pdf · uploaded 2 Dec 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aspen_compressed.pdf · uploaded 11 May 2022View
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Aspen_Mar_22.pdf · uploaded 18 May 2022View
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen_dec_21.pdf · uploaded 4 Jul 2022View
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Final_signed.pdf · uploaded 4 Jul 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Aspen_Sep_22.pdf · uploaded 8 Nov 2022View
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QA_Cert_Aspen Project_Sep_2022.pdf · uploaded 8 Nov 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate_Aspen.pdf · uploaded 21 Feb 2023View
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aspen_001.pdf · uploaded 1 Mar 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen_Jun_22.pdf · uploaded 7 Mar 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cert_Aspen_Sep_22.pdf · uploaded 7 Mar 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aspen 30-09-20_compressed.pdf · uploaded 4 Apr 2023View
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aspen 31-12-20_compressed.pdf · uploaded 4 Apr 2023View
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Aspen_Jun_2021_compressed.pdf · uploaded 4 Apr 2023View
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Aspen_Jun_2022_compressed.pdf · uploaded 4 Apr 2023View
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)aspen 30-09-20_compressed.pdf · uploaded 4 Apr 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aspen 31-12-20_compressed.pdf · uploaded 4 Apr 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen_Jun_2021_compressed.pdf · uploaded 4 Apr 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_ASPEN_Sep_22.pdf · uploaded 4 Apr 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen _Sep_20.pdf · uploaded 17 May 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Dec_20.pdf · uploaded 17 May 2023View
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Jun_21.pdf · uploaded 17 May 2023View
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Mar_22.pdf · uploaded 17 May 2023View
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Jun_22.pdf · uploaded 18 May 2023View
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_ASPEN_Sep_22.pdf · uploaded 18 May 2023View
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Dec_22.pdf · uploaded 19 May 2023View
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QA cert- Aspen march-22.pdf · uploaded 7 Jun 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QA_Cert_Aspen_Mar_22.pdf · uploaded 20 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)QA_Cert_Aspen_Mar_23.pdf · uploaded 20 Jun 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC Aspen_Mar_23.pdf · uploaded 21 Jun 2023View
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Mar_23.pdf · uploaded 10 Aug 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen_Dec_22.pdf · uploaded 29 Aug 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng_Aspen_Mar_23.pdf · uploaded 3 Oct 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_ASPEN_Jun_23.pdf · uploaded 6 Oct 2023View
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Jun_23.pdf · uploaded 25 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Aspen Form 5_FY 20-21.pdf · uploaded 5 Dec 2023View
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Aspen Form 5_FY 21-22.pdf · uploaded 5 Dec 2023View
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Aspen_Form-5 ( FY 22-23).pdf · uploaded 5 Dec 2023View
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Aspen_Sep_23.pdf · uploaded 18 Dec 2023View
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Engg_Cert_Aspen_Jun_23.pdf · uploaded 18 Dec 2023View
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen_Mar_23.pdf · uploaded 18 Dec 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen_Jun_23.pdf · uploaded 18 Dec 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen_Sep_23.pdf · uploaded 18 Dec 2023Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Sep_23.pdf · uploaded 20 Dec 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert_ASPEN_Dec 23.pdf · uploaded 26 Feb 2024View
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Aspen_Dec_23.pdf · uploaded 26 Feb 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Dec_23.pdf · uploaded 20 Mar 2024View
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Aspen_Mar_24.pdf · uploaded 15 May 2024View
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QA_Cert_Aspen_Mar_24.pdf · uploaded 15 May 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen_Mar_24.pdf · uploaded 27 May 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Mar_24.pdf · uploaded 4 Jun 2024View
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Aspen_Jun_24.pdf · uploaded 5 Aug 2024View
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen_Jun_24.pdf · uploaded 5 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Aspen_Sep_24.pdf · uploaded 31 Oct 2024View
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen_Sep_24.pdf · uploaded 31 Oct 2024View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Jun_24.pdf · uploaded 16 Nov 2024View
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Aspen_Form 5 (FY 23-24).pdf · uploaded 2 Dec 2024View
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Sep_24.pdf · uploaded 4 Dec 2024View
- 2 Architect’s Certificate on Completion of Project (Form 4)Form 4_Architect Certificate (Vista 3C).pdf · uploaded 26 Dec 2024View
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentVista 3C OC.pdf · uploaded 26 Dec 2024View
- 3 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentAspen OC.pdf · uploaded 26 Dec 2024View
- 4 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCover Letter_Change of Authority_Aspen.pdf · uploaded 26 Dec 2024View
- 1 Architect’s Certificate on Completion of Project (Form 4)Form 4_Architect Certificate (Aspen).pdf · uploaded 27 Jan 2025View
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentAspen_Declaration.pdf · uploaded 27 Jan 2025View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_ Aspen_Dec_24.pdf · uploaded 7 Feb 2025View
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Aspen_Dec_24.pdf · uploaded 7 Feb 2025View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Aspen_Dec_24.pdf · uploaded 3 Mar 2025View
Technical
- DocumentAnnexure_Layout Approval for Aspen.pdf · uploaded 21 Jul 2020View
- DocumentIOD_ Aspen_Compressed.pdf · uploaded 21 Jul 2020View
- Document2-BHK_Bldgno-12-13-14_GF-1st-2nd-3rd-Siteplan-Sec-Ele-compressed 1.pdf · uploaded 12 Aug 2020View
- Document2-BHK_Bldgno-12-13-14_4th-5th-6th-7th-Park-Areacal-Siteplan-compressed.pdf · uploaded 12 Aug 2020View
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Kh No 56 2 pt, Kh No 66 1 2 pt
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK93 units in all
- Address
- Kh No 66 1 2 pt, Kh No 67, Kh No 56 2 pt, Kharsoli, MauzaPIN 440034
- Village
- Pipla, Nagpur (Rural) taluka
- Land area for this project
- 3,234 sq m (34,809 sq ft)
- Permissible built-up area
- 5,724 sq m (61,616 sq ft)
- Sanctioned built-up area
- 5,325 sq m (57,314 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Kh No 66 1 2 pt,Kh No 67,Kh No 56 2 pt
Boundaries
- North
- Kh No 66 1 2 pt and Kh no 67
- South
- Kh No 66 1 2 pt and Kh No 56 2 pt
- East
- Kh No 67 and Kh No 56 2 pt
- West
- 15 mt wide internal road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking93 units
87 of 93 units booked (94%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 45.95 sq m · 495 sq ft | 93 | 87 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals1
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Engineer | Jeevan Ramkrishna Kute | — |