Khamla Heights
Deedo IDDP-NGP-R876MahaRERA shows it completed; no MahaRERA orders on record; 10% of its units are booked.
Khamla, Nagpur 440024 · by Govind Urban Credit Co-Op Society Ltd
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 7 Feb 2020, completion promised 30 Dec 2023.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP50500024351
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P50500024351 | 7 Feb 2020 | 30 Dec 2023 | 30 Dec 2023 | M/S Govind Urban Credit Co-Op Society Ltd | Project page |
Documents171
61 documents held by Deedo, 110 filings listed on MahaRERA's project page
Show all 171 documentsShow fewer documents
Other (8)
- OtherDate not statedView
Commencement certificate (2)
Form 1 (26)
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
Title report
- Title reportDate not statedView
Encumbrance details
- Encumbrance detailsDate not statedView
Layout plan (15)
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
- Layout planDate not statedView
Building plan
- Building planDate not statedView
Form B
- Form BDate not statedView
Form 2 (5)
Legal
- OtherGOVIND SOCIETY REGISTRATION.pdf · uploaded 2 Jan 2020View
- OtherGOVIND THARAV.pdf · uploaded 2 Jan 2020View
- Declaration Form BGOVIND form b.pdf · uploaded 2 Jan 2020View
- Legal Title reportTITLE REPORT GOVIND URBAN - FINAL.pdf · uploaded 14 Jan 2020View
- OtherNEW DOD_compressed.pdf · uploaded 16 May 2023View
Migrated
- 1 PAN Cardgovind id proof.pdf · uploaded 2 Jan 2020View
- 1 Building Plan Approval / NA Order for plotted developmentMAP 1 NEW-min.pdf · uploaded 2 Jan 2020View
- 1 Declaration in FORM BGOVIND form b.pdf · uploaded 2 Jan 2020View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)govind architect certificate.pdf · uploaded 2 Jan 2020View
- 1 OtherGOVIND SOCIETY REGISTRATION.pdf · uploaded 2 Jan 2020View
- 2 OtherGOVIND THARAV.pdf · uploaded 2 Jan 2020View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA FORM 3 FINAL.pdf · uploaded 8 Jan 2020View
- 1 Copy of the legal title reportTITLE REPORT GOVIND URBAN - FINAL.pdf · uploaded 14 Jan 2020View
- 1 Proforma of Allotment letterAGREEMENT-RERA--GOVIND URBAN CREDIT SOCIETY-MOUZA-KHAMLA.pdf · uploaded 15 Jan 2020View
- 2 Proforma of Allotment letterALLOTMENT LETTER FINAL.pdf · uploaded 15 Jan 2020Source
- 1 Copy of Layout Approval (in case of layout)MAP 1 NEW-min.pdf · uploaded 28 Jan 2020View
- 2 Copy of Layout Approval (in case of layout)MAP2-min.pdf · uploaded 28 Jan 2020View
- 2 Building Plan Approval / NA Order for plotted developmentMAP2-min.pdf · uploaded 28 Jan 2020View
- 1 Commencement Certificates / NA Order for plotted developmentgovind building permit.pdf · uploaded 28 Jan 2020View
- 2 PAN CardABHIJIT SIR PDF.pdf · uploaded 31 Jan 2020View
- 1 Details of encumbrancesno encum new 1.pdf · uploaded 31 Jan 2020View
- 3 Building Plan Approval / NA Order for plotted developmentREVISED SENCTION PLAN_compressed (1).pdf · uploaded 16 May 2023View
- 1 Declaration about Commencement CertificateREVISED comencment certi.pdf · uploaded 16 May 2023View
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 MARCH 2020_000136_compressed.pdf · uploaded 16 May 2023View
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 JUNE 2020_000135_compressed.pdf · uploaded 16 May 2023View
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 SEPTEMBER 2020_000147_compressed.pdf · uploaded 16 May 2023View
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 DECEMBER 2020_000146_compressed.pdf · uploaded 16 May 2023View
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 MARCH 2021_000145_compressed.pdf · uploaded 16 May 2023View
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 JUNE 2021_000144_compressed.pdf · uploaded 16 May 2023View
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 SEPTEMBER 2021_000143_compressed.pdf · uploaded 16 May 2023View
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)8 DECEMBER2021_000142_compressed.pdf · uploaded 16 May 2023View
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)9 MARCH 2022_000141_compressed.pdf · uploaded 16 May 2023View
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 JUNE 2022_compressed.pdf · uploaded 16 May 2023View
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 JUNE 2022_compressed.pdf · uploaded 16 May 2023View
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)12 DECEMBER 2022_000137_compressed.pdf · uploaded 16 May 2023View
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)13 MARCH 2023_000148_compressed.pdf · uploaded 16 May 2023View
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 MARCH 2020_000136_compressed.pdf · uploaded 16 May 2023View
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)2 JUNE 2020_000135_compressed.pdf · uploaded 16 May 2023View
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 SEPTEMBER 2020_000147_compressed.pdf · uploaded 16 May 2023View
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 DECEMBER 2020_000146_compressed.pdf · uploaded 16 May 2023View
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)5 MARCH 2021_000145_compressed.pdf · uploaded 16 May 2023View
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 JUNE 2021_000144_compressed.pdf · uploaded 16 May 2023View
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)7 SEPTEMBER 2021_000143_compressed.pdf · uploaded 16 May 2023View
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 FORM-3 (31-MARCH-2020).pdf · uploaded 16 May 2023View
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)2 FORM-3 (30-JUNE-2020).pdf · uploaded 16 May 2023View
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 FORM-3 (30-SEPTEMBER-2020).pdf · uploaded 16 May 2023View
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 FORM-3 (31-DECEMBER-2020).pdf · uploaded 16 May 2023View
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)5 FORM-3 (31-MARCH-2021).pdf · uploaded 16 May 2023View
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 FORM-3 (30-JUNE-2021).pdf · uploaded 16 May 2023View
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)7 FORM-3 (30-SEPTEMBER-2021).pdf · uploaded 16 May 2023View
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)8 FORM-3 (31-DECEMBER-2021).pdf · uploaded 16 May 2023View
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 FORM-3 (31-MARCH-2022).pdf · uploaded 16 May 2023Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)10 FORM-3 (30-JUNE-2022).pdf · uploaded 16 May 2023Source
- 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)11 FORM-3 (30-SEPTEMBER-2022).pdf · uploaded 16 May 2023Source
- 20 CA Certificate on Project Cost & Fund withdrawal (Form 3)12 FORM-3 (31-DECEMBER-2022).pdf · uploaded 16 May 2023Source
- 21 CA Certificate on Project Cost & Fund withdrawal (Form 3)13 FORM-3 (31-MARCH-2023).pdf · uploaded 16 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)2019-20.pdf · uploaded 16 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)2020-21.pdf · uploaded 16 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)2021-22.pdf · uploaded 16 May 2023Source
- 3 OtherNEW DOD_compressed.pdf · uploaded 16 May 2023View
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 FORM 2 AS ON 31-03-2020.pdf · uploaded 22 May 2023View
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 FORM 2 AS ON 30-06-2020.pdf · uploaded 22 May 2023View
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 FORM 2 AS ON 30-09-2020.pdf · uploaded 22 May 2023View
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 FORM 2 AS ON 31-12-2020.pdf · uploaded 22 May 2023View
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 FORM 2 AS ON 31-03-2021.pdf · uploaded 22 May 2023View
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 FORM 2 AS ON 30-06-2021.pdf · uploaded 22 May 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 FORM 2 AS ON 30-09-2021.pdf · uploaded 22 May 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 FORM 2 AS ON 31-12-2021.pdf · uploaded 22 May 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 FORM 2 AS ON 31-03-2022.pdf · uploaded 22 May 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)10 FORM 2 AS ON 30-06-2022.pdf · uploaded 22 May 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)11 FORM 2 AS ON 30-09-2022.pdf · uploaded 22 May 2023View
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)12 FORM 2 AS ON 31-03-2023.pdf · uploaded 22 May 2023View
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)13 FORM 2 AS ON 31-12-2022.pdf · uploaded 22 May 2023View
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)1 2019-2020.pdf · uploaded 22 May 2023View
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2 2020-2021.pdf · uploaded 22 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)3 2021-2022.pdf · uploaded 22 May 2023View
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)2022-23.pdf · uploaded 3 Oct 2023Source
- 22 CA Certificate on Project Cost & Fund withdrawal (Form 3)muskan mam_compressed.pdf · uploaded 29 Feb 2024Source
- 23 CA Certificate on Project Cost & Fund withdrawal (Form 3)pdf scan date 30 sep 23.pdf · uploaded 29 Feb 2024Source
- 24 CA Certificate on Project Cost & Fund withdrawal (Form 3)GOVIND DEC 2023.pdf · uploaded 29 Feb 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FEOM 1 DEC 24.pdf · uploaded 7 Feb 2025View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 FORM 3 DEC 24.pdf · uploaded 7 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 DEC 24 .pdf · uploaded 7 Feb 2025View
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FOEM 5 .pdf · uploaded 10 Feb 2025View
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 MARCH 24.pdf · uploaded 13 Feb 2025View
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FOEM 1 JUNE 24.pdf · uploaded 13 Feb 2025View
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SEP 24.pdf · uploaded 13 Feb 2025View
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)GOVIN URBAN CREDIT_MARCH 2024.pdf · uploaded 13 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)GOVIND URBAN CREDIT_JULY_2024.pdf · uploaded 13 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)GOVIND URBAN CREDIT_SEP 2024.pdf · uploaded 13 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 MARCH 24.pdf · uploaded 13 Feb 2025View
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 JUNE 24.pdf · uploaded 13 Feb 2025View
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SEP 24.pdf · uploaded 13 Feb 2025View
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM-2A.pdf · uploaded 11 Mar 2025View
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCert_FO_479768_383RZiKCSign.pdf · uploaded 31 Mar 2025View
Technical
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 2040
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 3BHK, Office space, Shop42 units in all
- Address
- 2040, Sahakar Nagar Road, KhamlaPIN 440024
- Village
- Nagpur (M Corp.), Nagpur (Urban) taluka
- Land area for this project
- 1,133 sq m (12,190 sq ft)
- Permissible built-up area
- 4,769 sq m (51,333 sq ft)
- Sanctioned built-up area
- 4,769 sq m (51,333 sq ft)
- Designated bank account
- 85
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
2040
Boundaries
- North
- Pracharya Arun Kalode Vidyalaya
- South
- City Survey No 38
- East
- Layout Of Lahirikrupa Co-Op Hsg Society Limited
- West
- Khamla Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking42 units
4 of 42 units booked (10%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 3BHK | 86.65 sq m · 933 sq ft | 8 | 0 |
| 3BHK | 86.78 sq m · 934 sq ft | 8 | 0 |
| 3BHK | 90.78 sq m · 977 sq ft | 16 | 0 |
| Office space | 104.3 sq m · 1,123 sq ft | 2 | 0 |
| Office space | 114.23 sq m · 1,230 sq ft | 2 | 0 |
| Shop | 27.11 sq m · 292 sq ft | 1 | 1 |
| Shop | 30.39 sq m · 327 sq ft | 2 | 2 |
| Shop | 31.3 sq m · 337 sq ft | 2 | 1 |
| Shop | 31.64 sq m · 341 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Madhav Associates | — |
| Chartered accountant | Ram Yadav Bonde | — |
| Engineer | Kamlesh Hedau | — |
| Other | Ashutosh vijay Talloo | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Khamla
- Vivek ApartmentRERA PR1190002602318
- Shri Ameya ApartmentsRERA PR1190002602310
- Sayalee ApartmentRERA PR1190002601108
- Shrinivas ApartmentsRERA PR1190002600586
- Shiv-Sudha LifestyleRERA PR1190002503025
- Shreekrishna HemprabhaRERA PR1190002502981
- Sukh SagarRERA PR1190002502631
- Riddhi Siddhi - IIIRERA PR1190002501512
All 19 projects in Khamla · Compare Khamla Heights with another project