Aaditya Premium 4

Completed

Jamtha, Nagpur 441108 |Promoter: Shree Mahalakshmi Builders

18 Aug 2017Registered with MahaRERA
30 Mar 2024Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Completed
Buildings
1
Land area for this project
12,100 sq m (1,30,243 sq ft)
Permissible built-up area
0 sq m (0 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
1,211 sq m (13,038 sq ft)
Address
Kh No 12/4, Jamtha, JamthaPIN 441108
Designated bank account
Yes Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.01660, 79.02984
Aaditya Premium 4 is at latitude 21.01660, longitude 79.02984.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2024

The latest completion date on record passed 2 years and 7 months ago.

Registered
18 Aug 2017
Promised
30 Mar 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050000806218 Aug 201730 Mar 2024—Shree Mahalakshmi BuildersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P50500008062)——

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsAs per Architect Certificate attached15%
  • Water SupplyAs per Architect Certificate attached0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per Architect Certificate attached0%
  • Storm Water DrainsAs per Architect Certificate attached0%
  • Landscaping & Tree PlantingAs per Architect Certificate attached0%
  • Street LightingAs per Architect Certificate attached0%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAs per Architect Certificate attached0%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceAs per Architect Certificate attached0%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 30 filings listed on MahaRERA's project page

Commencement certificate

Form B

Form 1

Form 2

Form 2A (3)

Other (5)

Show all 47 documentsShow fewer documents

Other (5)

Occupancy / completion certificate

  • Occupancy / completion certificate14 Aug 2021ViewSource

Form 4

Registration certificate

Layout plan

Allotment letter

Document library

  • Declaration in FORM B6 FORM B MAHALAXMI.pdf · uploaded 31 Jul 2017View
  • Details of encumbrances3 ENCUMBRANCES MAHALAXMI.pdf · uploaded 31 Jul 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)7Architect Certificate.pdf · uploaded 31 Jul 2017View
  • Copy of the legal title report2 712 LEGAL TITLE REPORT MAHALAXMI.pdf · uploaded 31 Jul 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Shri Mahalaxmi.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)4 LAYOUT PLAN MAHALAXMI.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)4 LAYOUT PLAN MAHALAXMI.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letter5 AGREEMENT TO SALE MAHALAXMI.pdf · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted development13COMMENSMENT NA ORDER.pdf · uploaded 31 Jul 2017View
  • OtherDeclaration.pdf · uploaded 12 Dec 2017View
  • Copy of Layout Approval (in case of layout)FINAL NA ORDER_MAP-ilovepdf-compressed.pdf · uploaded 9 Jun 2018Source
  • OtherDeclaration New.pdf · uploaded 9 Jun 2018View
  • OtherAudit Report-11-21.pdf · uploaded 19 Feb 2019View
  • OtherITR.pdf · uploaded 19 Feb 2019Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A June 2019.pdf · uploaded 14 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Sept 2019.pdf · uploaded 14 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Dec 2019.pdf · uploaded 14 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentComplition Certificate 12_4.pdf · uploaded 14 Aug 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Form - 4 ARCHITECT'S CERTIFICATE.pdf · uploaded 14 Aug 2021View
  • Disclosure of sold/ booked inventorySold Booked Unsold Plot.pdf · uploaded 14 Aug 2021View

Promoter documents

  • Declaration Form B6 FORM B MAHALAXMI.pdf · uploaded 31 Jul 2017View
  • Legal Title report2 712 LEGAL TITLE REPORT MAHALAXMI.pdf · uploaded 31 Jul 2017Source

Technical documents

  • NA Order for Plotted Development4 LAYOUT PLAN MAHALAXMI.pdfView
  • Layout Approval4 LAYOUT PLAN MAHALAXMI.pdfView
  • Layout ApprovalFINAL NA ORDER_MAP-ilovepdf-compressed.pdfSource

Other legal documents

  • OtherDeclaration New.pdfView
  • OtherAudit Report-11-21.pdfView
  • OtherITR.pdfSource
  • OtherDeclaration.pdfView

Proforma allotment letter

  • Proforma allotment letter5 AGREEMENT TO SALE MAHALAXMI.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jamtha, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

Kh No 12/4

As published on MahaRERA's project page

Kh No 12/4

Boundaries

North
Kh No 12 5
South
Kh No 12 6 Road
East
Kh No 12 3
West
Kh No 12 1

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectUmesh M Lamge—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology