Residential / Group Housing · 12 buildings · 1,293 unitsRERA P50500023088

Aadhar Nagari

Deedo IDDP-NGP-CJ8T

Completion was pushed back 4 years and 2 months, to Dec 2027; 1 listing or order with MahaRERA on record; 53% of its units are booked.

Hingna, Nagpur 441108 · by Madhav Infra

DeliveryExtended 4 yrs 2 moPromised Oct 2023 · now due Dec 2027Regulatory1 listing or orderLatest: Regulatory order, 2024Sales53% booked691 of 1,293 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 years and 2 months, to Dec 2027

  • This projectRegistered 29 Nov 2019, completion promised 28 Oct 2023, revised to 31 Dec 2027.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

12 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory record1

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

  • Regulatory order9 Aug 2024Matched by RERA number

    Regulatory order: PROJECT NAME: AADHAR NAGARI (Regulatory Case No. 287 OF 2024) dated 09 Aug 2024.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP50500023088
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050002308829 Nov 201928 Oct 202331 Dec 2027Madhav InfraProject page
Documents336

116 documents held by Deedo, 220 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Other (8)

  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
Show all 336 documentsShow fewer documents

Other (8)

  • OtherDate not statedView
  • OtherDate not statedView

Commencement certificate (3)

  • Commencement certificateDate not statedView
  • Commencement certificateDate not statedView
  • Commencement certificateDate not statedView

Form 1 (61)

  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView

Title report (7)

  • Title reportDate not statedView
  • Title reportDate not statedView
  • Title reportDate not statedView
  • Title reportDate not statedView
  • Title reportDate not statedView
  • Title reportDate not statedView
  • Title reportDate not statedView

Encumbrance details

  • Encumbrance detailsDate not statedView

Layout plan (6)

  • Layout planDate not statedView
  • Layout planDate not statedView
  • Layout planDate not statedView
  • Layout planDate not statedView
  • Layout planDate not statedView
  • Layout planDate not statedView

Building plan (12)

  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView
  • Building planDate not statedView

Form B (5)

  • Form BDate not statedView
  • Form BDate not statedView
  • Form BDate not statedView
  • Form BDate not statedView
  • Form BDate not statedView

Form 2 (11)

  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView

Legal

  • Legal Title reportSEARCH REPORT 2_compressed.pdf · uploaded 8 Sep 2019View
  • Legal Title reportSEARCH REPORT 3_compressed.pdf · uploaded 8 Sep 2019View
  • Legal Title reportSEARCH REPORT 4_compressed.pdf · uploaded 8 Sep 2019View
  • Legal Title reportSEARCH REPORT 5_compressed.pdf · uploaded 8 Sep 2019View
  • Legal Title reportSEARCH REPORT 6_compressed.pdf · uploaded 8 Sep 2019View
  • Legal Title reportSEARCH REPORT 7_compressed.pdf · uploaded 8 Sep 2019View
  • Legal Title reportSEARCH REPORT 8_compressed.pdf · uploaded 8 Sep 2019View
  • Legal Title reportSEARCH REPORT 7_compressed.pdf · uploaded 8 Sep 2019View
  • Declaration Form Bdeclaration.pdf · uploaded 15 Sep 2019View
  • Declaration Form BFORM B.pdf · uploaded 26 Sep 2023View
  • Declaration Form BFORM -B Madhav Infra .pdf · uploaded 2 Nov 2023View
  • Declaration Form BForm B (Affidavit cum Declaration).pdf · uploaded 30 Jul 2024View

Migrated

  • 1 PAN CardDEEPAK NILAWAR PAN CARD.pdf · uploaded 8 Sep 2019View
  • 1 Copy of the legal title reportSEARCH REPORT 2_compressed.pdf · uploaded 8 Sep 2019View
  • 2 Copy of the legal title reportSEARCH REPORT 3_compressed.pdf · uploaded 8 Sep 2019View
  • 3 Copy of the legal title reportSEARCH REPORT 4_compressed.pdf · uploaded 8 Sep 2019View
  • 4 Copy of the legal title reportSEARCH REPORT 5_compressed.pdf · uploaded 8 Sep 2019View
  • 5 Copy of the legal title reportSEARCH REPORT 6_compressed.pdf · uploaded 8 Sep 2019View
  • 6 Copy of the legal title reportSEARCH REPORT 7_compressed.pdf · uploaded 8 Sep 2019View
  • 7 Copy of the legal title reportSEARCH REPORT 8_compressed.pdf · uploaded 8 Sep 2019View
  • 8 Copy of the legal title reportSEARCH REPORT 7_compressed.pdf · uploaded 8 Sep 2019View
  • 1 Copy of Layout Approval (in case of layout)SANCTION LAYOUT PLAN_compressed.pdf · uploaded 14 Sep 2019View
  • 1 Details of encumbrancesEncumbrance certificate.pdf · uploaded 15 Sep 2019View
  • 1 Commencement Certificates / NA Order for plotted developmentSANCTION LETTER_compressed.pdf · uploaded 15 Sep 2019View
  • 1 Declaration in FORM Bdeclaration.pdf · uploaded 15 Sep 2019View
  • 1 Proforma of Allotment letterPROFORMA FOR AGREEMENT TO SALE.pdf · uploaded 15 Sep 2019View
  • 1 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN1.pdf · uploaded 2 Oct 2019View
  • 2 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 2.pdf · uploaded 2 Oct 2019View
  • 3 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 3.pdf · uploaded 2 Oct 2019View
  • 4 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 4.pdf · uploaded 2 Oct 2019View
  • 5 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 5.pdf · uploaded 2 Oct 2019View
  • 6 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 6.pdf · uploaded 2 Oct 2019View
  • 7 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 7.pdf · uploaded 2 Oct 2019View
  • 8 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 8.pdf · uploaded 2 Oct 2019View
  • 9 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 9.pdf · uploaded 2 Oct 2019View
  • 10 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 10.pdf · uploaded 2 Oct 2019View
  • 11 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 11.pdf · uploaded 2 Oct 2019View
  • 12 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 12.pdf · uploaded 2 Oct 2019View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE_compressed (1) (1).pdf · uploaded 24 Oct 2019View
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate_compressed.pdf · uploaded 24 Oct 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FORM NO 3 C.pdf · uploaded 24 Oct 2019View
  • 1 Annual Audit Report of Statutory CA (Form 5)CA CERTIFICATE FORM NO 5.pdf · uploaded 24 Oct 2019View
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)C A CERTIFICATE.pdf · uploaded 6 Sep 2023View
  • 1 Declaration about Commencement CertificateFORMAT-D .pdf · uploaded 26 Sep 2023View
  • 2 Declaration in FORM BFORM B.pdf · uploaded 26 Sep 2023View
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A 2019-20.pdf · uploaded 26 Sep 2023View
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A 2020-21.pdf · uploaded 26 Sep 2023View
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A 2021-22.pdf · uploaded 26 Sep 2023View
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A 2022-23.pdf · uploaded 26 Sep 2023View
  • 2 Declaration about Commencement CertificateSR INFRA Format -D.pdf · uploaded 7 Oct 2023View
  • 3 Declaration about Commencement CertificateSR INFRA Format -D.pdf · uploaded 7 Oct 2023View
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 7 Oct 2023View
  • 1 Disclosure of sold/ booked inventorySold Unsold Aadhar_11zon (1).pdf · uploaded 10 Oct 2023View
  • 3 Declaration in FORM BFORM -B Madhav Infra .pdf · uploaded 2 Nov 2023View
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Aadhar Nagari as on June 2023.pdf · uploaded 2 Nov 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Form 2 December 2019.pdf · uploaded 2 Nov 2023View
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form 2 March 2020.pdf · uploaded 2 Nov 2023View
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form 2 March 2020.pdf · uploaded 2 Nov 2023View
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Form 2 March 2021.pdf · uploaded 2 Nov 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Form 2 December 2021.pdf · uploaded 2 Nov 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Form 2 March 2022.pdf · uploaded 2 Nov 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Form 2 June 2022.pdf · uploaded 2 Nov 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Form 2 September 2022.pdf · uploaded 2 Nov 2023Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Form 2 December 2022.pdf · uploaded 2 Nov 2023Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 Form 2 March 2023.pdf · uploaded 2 Nov 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Aadhar Nagari as on 30th June 2023.pdf · uploaded 2 Nov 2023View
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 Form 3 December 2019_11zon.pdf · uploaded 2 Nov 2023View
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)2 Form 3 March 2020_11zon.pdf · uploaded 2 Nov 2023View
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 Form 3 March 2021_11zon.pdf · uploaded 2 Nov 2023View
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 Form 3 December 2021_11zon.pdf · uploaded 2 Nov 2023View
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)5 Form 3 March 2022_11zon.pdf · uploaded 2 Nov 2023View
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 Form 3 June 2022_11zon.pdf · uploaded 2 Nov 2023View
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)7 Form 3 September 2022_11zon.pdf · uploaded 2 Nov 2023View
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)8 Form 3 December 2022_11zon.pdf · uploaded 2 Nov 2023View
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 Form 3 March 2023_11zon.pdf · uploaded 2 Nov 2023View
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)10 Form 3 June 2023_11zon.pdf · uploaded 2 Nov 2023View
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)11 Form 3 September 2023_11zon.pdf · uploaded 2 Nov 2023View
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - Aadhar Nagari FY 19-20.pdf · uploaded 2 Nov 2023View
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 2019-2020.pdf · uploaded 2 Nov 2023View
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 - Aadhar Nagari FY 20-21.pdf · uploaded 2 Nov 2023View
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 2020-2021.pdf · uploaded 2 Nov 2023View
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 - Aadhar Nagari FY 21-22.pdf · uploaded 2 Nov 2023View
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Aadhar Nagari FY 22-23.pdf · uploaded 2 Nov 2023View
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 2021-2022.pdf · uploaded 2 Nov 2023View
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 2022-2023.pdf · uploaded 2 Nov 2023View
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2 June.pdf · uploaded 3 Nov 2023Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2 Sept.pdf · uploaded 3 Nov 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 2020 Signed.pdf · uploaded 2 Feb 2024View
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 2021 Signed.pdf · uploaded 2 Feb 2024View
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 2022 Signed.pdf · uploaded 2 Feb 2024View
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 2023 Signed.pdf · uploaded 2 Feb 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2023 Signed_compressed.pdf · uploaded 2 Feb 2024Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Aadhar Nagari FY 22-23 New Format.pdf · uploaded 14 Feb 2024View
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Aadhar Nagari as on 31st December 2023 - Copy With Sd.pdf · uploaded 24 Feb 2024View
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Aadhar Nagari as on December 2023 (Signed).pdf · uploaded 27 Feb 2024Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)12 Form 3 December 2023_11zon.pdf · uploaded 27 Feb 2024View
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)June 2022_compressed.pdf · uploaded 28 Feb 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sept 2022_compressed.pdf · uploaded 28 Feb 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Dec 2022_compressed.pdf · uploaded 28 Feb 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)June 2023_compressed.pdf · uploaded 28 Feb 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 as on 31-12-2023.pdf · uploaded 4 Mar 2024Source
  • 4 Declaration in FORM BForm B (Affidavit cum Declaration).pdf · uploaded 30 Jul 2024View
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 23_11zon.pdf · uploaded 30 Jul 2024Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Mar 24.pdf · uploaded 30 Jul 2024View
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 23-24.pdf · uploaded 30 Jul 2024View
  • 1 CERSAI detailsCERSAI Declaration.pdf · uploaded 30 Jul 2024View
  • 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Mar 24_11zon.pdf · uploaded 30 Jul 2024View
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A (1).pdf · uploaded 30 Jul 2024View
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A - Seperate Bank Account Details.pdf · uploaded 30 Jul 2024View
  • 2 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 1 Aug 2024View
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Adobe Scan 05 Aug 2024 (1) (1)_compressed.pdf · uploaded 5 Aug 2024View
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Aadhar Nagari as on June 2024.pdf · uploaded 3 Mar 2025View
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Aadhar Nagari as on Sep 2024.pdf · uploaded 3 Mar 2025View
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Aadhar Nagari as on Dec 2024.pdf · uploaded 3 Mar 2025View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Aadhar Nagari as on June 2024.pdf · uploaded 11 Mar 2025View
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Aadhar Nagari as on Sep 2024.pdf · uploaded 11 Mar 2025View
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Aadhar Nagari as on Dec 2024.pdf · uploaded 11 Mar 2025View
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Aadhar Nagari as on June 2024.pdf · uploaded 11 Mar 2025View
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Aadhar Nagari as on Sep 2024.pdf · uploaded 11 Mar 2025View
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Aadhar Nagari as on Dec 2024.pdf · uploaded 11 Mar 2025View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aadhar Nagari - Form 1 March 2020.pdf · uploaded 10 May 2025View
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aadhar Nagari - Form 1 March 2021.pdf · uploaded 10 May 2025View
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aadhar Nagari - Form 1 March 2022.pdf · uploaded 10 May 2025View
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aadhar Nagari - Form 1 March 2023.pdf · uploaded 10 May 2025View
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aadhar Nagari - Form 1 March 2024.pdf · uploaded 10 May 2025View
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aadhar Nagari - Form 1 June 2024.pdf · uploaded 10 May 2025View
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aadhar Nagari - Form 1 September 2024.pdf · uploaded 10 May 2025View
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aadhar Nagari - Form 1 December 2024.pdf · uploaded 10 May 2025View
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)16 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf · uploaded 10 May 2025View
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 June 2024_11zon.pdf · uploaded 10 May 2025View
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 September 2024_11zon.pdf · uploaded 10 May 2025View
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 December 2024_11zon.pdf · uploaded 10 May 2025View
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)16 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 10 May 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 June 2024.pdf · uploaded 10 May 2025View
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 September 2024.pdf · uploaded 10 May 2025View
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 December 2024.pdf · uploaded 10 May 2025View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Aadhar Nagari - Form 1 March 2025.pdf · uploaded 30 May 2025View
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 March 2020.pdf · uploaded 30 May 2025View
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 March 2021.pdf · uploaded 30 May 2025View
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 March 2022.pdf · uploaded 30 May 2025View
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 March 2023.pdf · uploaded 30 May 2025View
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 March 2024.pdf · uploaded 30 May 2025View
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 June 2024.pdf · uploaded 30 May 2025View
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 September 2024.pdf · uploaded 30 May 2025View
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 December 2024.pdf · uploaded 30 May 2025View
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aadhar Nagari - Form 3 March 2025.pdf · uploaded 30 May 2025View
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 March 2020.pdf · uploaded 30 May 2025View
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 March 2025.pdf · uploaded 30 May 2025View
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 December 2024.pdf · uploaded 30 May 2025View
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 September 2024.pdf · uploaded 30 May 2025View
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 June 2024.pdf · uploaded 30 May 2025View
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 March 2024.pdf · uploaded 30 May 2025View
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 March 2023.pdf · uploaded 30 May 2025View
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 March 2022.pdf · uploaded 30 May 2025View
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aadhar Nagari - Form 2 March 2021.pdf · uploaded 30 May 2025View
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Aadhar Nagari - Form 5 FY 2023-24.pdf · uploaded 30 May 2025View
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Aadhar Nagari - Form 5 FY 2023-24.pdf · uploaded 30 May 2025View
  • Form 1Form 1 - Aadhar Nagari as on June 2025.pdf · uploaded 20 Sep 2025Source
  • Form 2Form 2 - Aadhar Nagari as on June 2025.pdf · uploaded 20 Sep 2025Source
  • Form 3Form 3 - Aadhar Nagari as on June 2025.pdf · uploaded 20 Sep 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Aadhar Nagari as on June 2025.pdf · uploaded 20 Sep 2025Source
  • Form 1Form 1 - Aadhar Nagari as on March 2025.pdf · uploaded 26 Sep 2025Source
  • Form 2Form 2 - Aadhar Nagari as on March 2025.pdf · uploaded 26 Sep 2025Source
  • Form 3Form 3 - Aadhar Nagari as on March 2025.pdf · uploaded 26 Sep 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Aadhar Nagari as on March 2025.pdf · uploaded 26 Sep 2025Source
  • Form 1Form 1 - Aadhar Nagari as on Sep 2025.pdf · uploaded 25 Nov 2025Source
  • Form 2Form 2 - Aadhar Nagari as on Sept 2025.pdf · uploaded 25 Nov 2025Source
  • Form 3Form 3 - Aadhar Nagari as on Sep 2025.pdf · uploaded 25 Nov 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Aadhar Nagari as on Sep 2025.pdf · uploaded 25 Nov 2025Source
  • Form 1Form 1- Aadhar Nagari as on 31st Dec 2025.pdf · uploaded 26 May 2026Source
  • Form 2Form 2 - Aadhar Nagari as on 31st Dec 2025.pdf · uploaded 26 May 2026Source
  • Form 3Form 3- Aadhar Nagari as on 31st Dec 2025.pdf · uploaded 26 May 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Aadhar Nagari as on 31st Dec 2025.pdf · uploaded 26 May 2026Source
  • Form 1Form 1 - Aadhar Nagari as on March 2026.pdf · uploaded 3 Jul 2026Source
  • Form 2Form 2 - Aadhar Nagari as on March 2026.pdf · uploaded 3 Jul 2026Source
  • Form 3Form 3 - Aadhar Nagari as on March 2026.pdf · uploaded 3 Jul 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Aadhar Nagari as on March 2026.pdf · uploaded 3 Jul 2026Source

Technical

  • DocumentSANCTION LAYOUT PLAN_compressed.pdf · uploaded 14 Sep 2019View
  • DocumentBUILDING PLAN1.pdf · uploaded 2 Oct 2019View
  • DocumentBUILDING PLAN 2.pdf · uploaded 2 Oct 2019View
  • DocumentBUILDING PLAN 3.pdf · uploaded 2 Oct 2019View
  • DocumentBUILDING PLAN 4.pdf · uploaded 2 Oct 2019View
  • DocumentBUILDING PLAN 5.pdf · uploaded 2 Oct 2019View
  • DocumentBUILDING PLAN 6.pdf · uploaded 2 Oct 2019View
  • DocumentBUILDING PLAN 7.pdf · uploaded 2 Oct 2019View
  • DocumentBUILDING PLAN 8.pdf · uploaded 2 Oct 2019View
  • DocumentBUILDING PLAN 9.pdf · uploaded 2 Oct 2019View
  • DocumentBUILDING PLAN 10.pdf · uploaded 2 Oct 2019View
  • DocumentBUILDING PLAN 11.pdf · uploaded 2 Oct 2019View
  • DocumentBUILDING PLAN 12.pdf · uploaded 2 Oct 2019View

Technical (Architect)

  • DocumentAdobe Scan 05 Aug 2024 (1) (1)_compressed.pdf · uploaded 5 Aug 2024View
  • DocumentForm 1 - Aadhar Nagari as on June 2024.pdf · uploaded 11 Mar 2025View
  • DocumentForm 1 - Aadhar Nagari as on Sep 2024.pdf · uploaded 11 Mar 2025View
  • DocumentForm 1 - Aadhar Nagari as on Dec 2024.pdf · uploaded 11 Mar 2025View
  • DocumentAadhar Nagari - Form 1 March 2020.pdf · uploaded 10 May 2025View
  • DocumentAadhar Nagari - Form 1 March 2021.pdf · uploaded 10 May 2025View
  • DocumentAadhar Nagari - Form 1 March 2022.pdf · uploaded 10 May 2025View
  • DocumentAadhar Nagari - Form 1 March 2023.pdf · uploaded 10 May 2025View
  • DocumentAadhar Nagari - Form 1 March 2024.pdf · uploaded 10 May 2025View
  • DocumentAadhar Nagari - Form 1 June 2024.pdf · uploaded 10 May 2025View
  • DocumentAadhar Nagari - Form 1 September 2024.pdf · uploaded 10 May 2025View
  • DocumentAadhar Nagari - Form 1 December 2024.pdf · uploaded 10 May 2025View
  • DocumentAadhar Nagari - Form 1 March 2025.pdf · uploaded 30 May 2025View

Technical (Engineer)

  • DocumentForm 2 Mar 24.pdf · uploaded 30 Jul 2024View
  • DocumentForm 2 - Aadhar Nagari as on June 2024.pdf · uploaded 3 Mar 2025View
  • DocumentForm 2 - Aadhar Nagari as on Sep 2024.pdf · uploaded 3 Mar 2025View
  • DocumentForm 2 - Aadhar Nagari as on Dec 2024.pdf · uploaded 3 Mar 2025View
  • Document16 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 10 May 2025Source
  • DocumentAadhar Nagari - Form 2 June 2024.pdf · uploaded 10 May 2025View
  • DocumentAadhar Nagari - Form 2 September 2024.pdf · uploaded 10 May 2025View
  • DocumentAadhar Nagari - Form 2 December 2024.pdf · uploaded 10 May 2025View
  • DocumentAadhar Nagari - Form 2 March 2020.pdf · uploaded 30 May 2025View
  • DocumentAadhar Nagari - Form 2 March 2021.pdf · uploaded 30 May 2025View
  • DocumentAadhar Nagari - Form 2 March 2022.pdf · uploaded 30 May 2025View
  • DocumentAadhar Nagari - Form 2 March 2023.pdf · uploaded 30 May 2025View
  • DocumentAadhar Nagari - Form 2 March 2024.pdf · uploaded 30 May 2025View
  • DocumentAadhar Nagari - Form 2 June 2024.pdf · uploaded 30 May 2025View
  • DocumentAadhar Nagari - Form 2 September 2024.pdf · uploaded 30 May 2025View
  • DocumentAadhar Nagari - Form 2 December 2024.pdf · uploaded 30 May 2025View
  • DocumentAadhar Nagari - Form 2 March 2025.pdf · uploaded 30 May 2025View

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 89/2, 89/3

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, Shop, 1RK, Row House1,293 units in all
Address
89/2, 89/3, 97/1, 97/2, 97/3, 97/4, 85, Wardha Road, KanholiPIN 441108
Village
Hingna, Hingna taluka
Land area for this project
44,609 sq m (4,80,167 sq ft)
Permissible built-up area
44,609 sq m (4,80,167 sq ft)
Sanctioned built-up area
44,609 sq m (4,80,167 sq ft)
Recreational open space
23,640 sq m (2,54,459 sq ft)
Designated bank account
85
Developed in phases
Yes

Survey, CTS, gat or plot numbers

89/289/397/197/297/3

Land as published on MahaRERA's project page

89/2,89/3,97/1,97/2,97/3,97/4,85

Boundaries

North
Another Khasra
South
Another Khasra
East
Another Khasra
West
Another Khasra

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking1,293 units

691 of 1,293 units booked (53%), as the promoter reported to MahaRERA

1BHK · 410 unitsShop · 128 units1RK · 324 unitsRow House · 431 units
BuildingTypeCarpet areaUnitsBooked
Akshra1BHK27.8 sq m · 299 sq ft6010
AkshraShop8.66 sq m · 93 sq ft44
AkshraShop19.15 sq m · 206 sq ft63
AkshraShop26.19 sq m · 282 sq ft10
Gokul1RK20.32 sq m · 219 sq ft4024
Gokul1RK20.36 sq m · 219 sq ft64
Gokul1RK20.64 sq m · 222 sq ft208
Gokul1RK20.95 sq m · 226 sq ft6635
Show all 68 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
GokulShop9.4 sq m · 101 sq ft21
GokulShop10.36 sq m · 112 sq ft11
GokulShop10.57 sq m · 114 sq ft43
GokulShop11.36 sq m · 122 sq ft53
GokulShop13 sq m · 140 sq ft20
GokulShop13.54 sq m · 146 sq ft43
GokulShop14.42 sq m · 155 sq ft21
GokulShop14.66 sq m · 158 sq ft40
GokulShop15.75 sq m · 170 sq ft30
GokulShop15.95 sq m · 172 sq ft10
GokulShop15.98 sq m · 172 sq ft10
Keshav And Riddhisiddhi1BHK27.3 sq m · 294 sq ft600
Keshav And Riddhisiddhi1BHK29.07 sq m · 313 sq ft1100
Keshav And RiddhisiddhiShop8.66 sq m · 93 sq ft42
Keshav And RiddhisiddhiShop19.15 sq m · 206 sq ft62
Keshav And RiddhisiddhiShop26.19 sq m · 282 sq ft10
Keshav And RiddhisiddhiShop29.07 sq m · 313 sq ft40
Mayur1BHK27.3 sq m · 294 sq ft600
MayurShop8.66 sq m · 93 sq ft40
MayurShop19.15 sq m · 206 sq ft60
MayurShop26.19 sq m · 282 sq ft10
Radhey1BHK27.3 sq m · 294 sq ft600
RadheyShop8.66 sq m · 93 sq ft40
RadheyShop19.15 sq m · 206 sq ft60
RadheyShop26.19 sq m · 282 sq ft10
Row HouseRow House20.33 sq m · 219 sq ft1515
Row HouseRow House20.69 sq m · 223 sq ft114114
Row HouseRow House20.74 sq m · 223 sq ft1212
Row HouseRow House22.31 sq m · 240 sq ft3534
Row HouseRow House24.23 sq m · 261 sq ft2221
Row HouseRow House24.34 sq m · 262 sq ft132132
Row HouseRow House26.5 sq m · 285 sq ft99
Row HouseRow House28.18 sq m · 303 sq ft6262
Row HouseRow House33.52 sq m · 361 sq ft146
Row HouseRow House35.96 sq m · 387 sq ft1412
Row HouseRow House52.63 sq m · 567 sq ft10
Row HouseRow House57.34 sq m · 617 sq ft10
Vasu1BHK27.3 sq m · 294 sq ft600
VasuShop8.66 sq m · 93 sq ft40
VasuShop19.15 sq m · 206 sq ft60
VasuShop26.19 sq m · 282 sq ft10
Ved1RK27.8 sq m · 299 sq ft6045
VedShop8.66 sq m · 93 sq ft44
VedShop19.15 sq m · 206 sq ft65
VedShop26.19 sq m · 282 sq ft10
Vrundavan1RK20.32 sq m · 219 sq ft4024
Vrundavan1RK20.36 sq m · 219 sq ft64
Vrundavan1RK20.64 sq m · 222 sq ft2015
Vrundavan1RK20.95 sq m · 226 sq ft6647
VrundavanShop9.4 sq m · 101 sq ft22
VrundavanShop10.36 sq m · 112 sq ft11
VrundavanShop10.57 sq m · 114 sq ft44
VrundavanShop11.36 sq m · 122 sq ft55
VrundavanShop13 sq m · 140 sq ft21
VrundavanShop13.54 sq m · 146 sq ft43
VrundavanShop14.42 sq m · 155 sq ft21
VrundavanShop14.66 sq m · 158 sq ft44
VrundavanShop15.75 sq m · 170 sq ft33
VrundavanShop15.95 sq m · 172 sq ft11
VrundavanShop15.98 sq m · 172 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Other projects in Hingna

All 56 projects in Hingna · Compare Aadhar Nagari with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Report a problemMethodology