Dem Phoenix
Deedo IDDP-MSB-N2P0MahaRERA shows it completed; no MahaRERA orders on record; 86% of its units are booked.
Malad, Mumbai Suburban 400097 · by Dem Buildwell
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 27 Dec 2022, completion promised 31 Jul 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51800048376
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800048376 | 27 Dec 2022 | 31 Jul 2026 | 31 Jul 2026 | Dem Buildwell | Project page |
Documents199
1 document held by Deedo, 198 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD.pdf · uploaded 4 Nov 2022Source
Legal
Show all 199 documentsShow fewer documents
Migrated
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate sale portion.pdf · uploaded 8 Nov 2022Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 9 Nov 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentIOD Copy_1.pdf · uploaded 9 Nov 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentIOD Copy_2.pdf · uploaded 9 Nov 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentIOD Building 7_1.pdf · uploaded 9 Nov 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentIOD Building 7_2.pdf · uploaded 9 Nov 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentIOD Building 7_3.pdf · uploaded 9 Nov 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentIOD Building 7_4.pdf · uploaded 9 Nov 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentIOD Building 7_5.pdf · uploaded 9 Nov 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentIOD Building 7_6.pdf · uploaded 9 Nov 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentIOD Building 7_7.pdf · uploaded 9 Nov 2022Source
- 10 Building Plan Approval / NA Order for plotted developmentIOD Building 7_8.pdf · uploaded 9 Nov 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 9 Nov 2022Source
- 1 Declaration about Commencement Certificatecomencement certificate.pdf · uploaded 10 Nov 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Phoenix_compressed.pdf · uploaded 10 Nov 2022Source
- 1 Proforma of Agreement for saleSale Agreement.pdf · uploaded 10 Nov 2022Source
- 1 Proforma of Allotment letterAllotment letter.pdf · uploaded 10 Nov 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of separate bank account details.pdf · uploaded 10 Nov 2022Source
- 1 Deviation Report with respect to Allotment letterAllotment letter deviation.pdf · uploaded 10 Nov 2022Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION CERTIFICATE.pdf · uploaded 10 Nov 2022Source
- 1 a Details of encumbrances concerned to Financeno financial encumbrance.pdf · uploaded 16 Nov 2022Source
- 1 b Details of encumbrances concerned to Legalno financial encumbrance.pdf · uploaded 16 Nov 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200252336062_For_Asset_Based_Search_16_11_2022_14_34_59_769.pdf · uploaded 16 Nov 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate.pdf · uploaded 16 Nov 2022Source
- 2 a Details of encumbrances concerned to FinanceNo Legal Encumbrance.pdf · uploaded 8 Dec 2022Source
- 2 b Details of encumbrances concerned to LegalNo Legal Encumbrance.pdf · uploaded 8 Dec 2022Source
- 1 Other – LegalNo Legal Encumbrance.pdf · uploaded 8 Dec 2022Source
- 1 Declaration in FORM BForm B Declaration Buildwell.pdf · uploaded 15 Dec 2022Source
- 11 Building Plan Approval / NA Order for plotted developmentAmended IOA malad ganesh prasad.pdf · uploaded 6 Jan 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentBinder1_Part1_compressed.pdf · uploaded 6 Jan 2023Source
- 13 Building Plan Approval / NA Order for plotted developmentBinder1_Part2_compressed.pdf · uploaded 6 Jan 2023Source
- 14 Building Plan Approval / NA Order for plotted developmentBinder1_Part3_compressed.pdf · uploaded 6 Jan 2023Source
- 15 Building Plan Approval / NA Order for plotted developmentBinder1_Part4_compressed.pdf · uploaded 6 Jan 2023Source
- 16 Building Plan Approval / NA Order for plotted developmentBinder1_Part5_compressed.pdf · uploaded 6 Jan 2023Source
- 17 Building Plan Approval / NA Order for plotted developmentBinder1_Part6_compressed.pdf · uploaded 6 Jan 2023Source
- 18 Building Plan Approval / NA Order for plotted developmentBinder1_Part7_compressed.pdf · uploaded 6 Jan 2023Source
- 19 Building Plan Approval / NA Order for plotted developmentBinder1_Part8_compressed.pdf · uploaded 6 Jan 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC_Amended.pdf · uploaded 6 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE -A.pdf · uploaded 13 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNED FORM 3_compressed.pdf · uploaded 1 Feb 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure of inventory.pdf · uploaded 15 Mar 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Phoenix Architect 31323.pdf · uploaded 18 May 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate_rehab 31323.pdf · uploaded 18 May 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate_sale 31323.pdf · uploaded 18 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Phoenix Quality Assurance_compressed.pdf · uploaded 18 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Phoenix Quality Assurance_compressed.pdf · uploaded 15 Jul 2023Source
- 2 Disclosure of sold/ booked inventoryBook Sold 310323_compressed 1.pdf · uploaded 15 Jul 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate 310323_compressed.pdf · uploaded 15 Jul 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Area Certificate.pdf · uploaded 18 Sep 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)signed engineer certificate Rehab.pdf · uploaded 18 Sep 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)signed engineer certificate sale.pdf · uploaded 18 Sep 2023Source
- 3 Disclosure of sold/ booked inventoryBook Sold Buildwell 30623.pdf · uploaded 18 Sep 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Buildwell 30623.pdf · uploaded 18 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Buildwell 2022 23.pdf · uploaded 18 Sep 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Area Certificate 30092023.pdf · uploaded 20 Dec 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate rehab 30923.pdf · uploaded 20 Dec 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate sale 30923.pdf · uploaded 20 Dec 2023Source
- 4 Disclosure of sold/ booked inventory30923 Buildwell Book Unsold c.pdf · uploaded 20 Dec 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Form 3 Dem Buildwell 30923 c.pdf · uploaded 20 Dec 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Area Certificate 31122023.pdf · uploaded 10 Apr 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate rehab 311223.pdf · uploaded 10 Apr 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate sale 301223.pdf · uploaded 10 Apr 2024Source
- 5 Disclosure of sold/ booked inventorySold-Booked Inventory Phoenix 31223.pdf · uploaded 10 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 DEM Phoenix 311223compressed.pdf · uploaded 10 Apr 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Area Certificate 31324 Phoenix.pdf · uploaded 29 Jun 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate_rehab 31324.pdf · uploaded 29 Jun 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate_sale 31324.pdf · uploaded 29 Jun 2024Source
- 6 Disclosure of sold/ booked inventoryDisclosure Of Sold Booked Inventory.pdf · uploaded 29 Jun 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 DEM Phornix Mar 2024.pdf · uploaded 3 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Area Certificate Siddhi 30062024 c.pdf · uploaded 28 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Phoenix Architect Area Certificate 3062024 c.pdf · uploaded 28 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 DEM Buildwell 30624 c.pdf · uploaded 28 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate rehab 30624.pdf · uploaded 28 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate sale 30624.pdf · uploaded 28 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryBuildwell Disclosure Of Sold.pdf · uploaded 28 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Engineers Certificate on Quality Assurance.pdf · uploaded 28 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Buildwell.pdf · uploaded 5 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentS36C-622010215520.pdf · uploaded 6 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentPart 1.pdf · uploaded 6 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentPart 2.pdf · uploaded 6 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Phoenix Architect Area Certificate 30092024.pdf · uploaded 2 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30924.pdf · uploaded 2 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate rehab 30924.pdf · uploaded 2 Dec 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate sale 30924.pdf · uploaded 2 Dec 2024Source
- 2 Disclosure of sold/ booked inventoryBook Sold 300924.pdf · uploaded 2 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate - Dem Phoenix.pdf · uploaded 10 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Buildwell 311224.pdf · uploaded 10 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate rehab 311224.pdf · uploaded 10 Mar 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate sale 311224.pdf · uploaded 10 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryDem phoenix Book Sold311224.pdf · uploaded 10 Mar 2025Source
- Form 5 (FY 2022-2023)Form 5 Buildwell 2022 23.pdf · uploaded 9 Jul 2025Source
- Form 5 (FY 2023-2024)Form 5 Buildwell.pdf · uploaded 9 Jul 2025Source
- Form 1Architect Area Certificate 31323.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate_sale 31323.pdf · uploaded 8 Sep 2025Source
- Form 3Form 3 CA Certificate 310323.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryBook Sold 310323.pdf · uploaded 8 Sep 2025Source
- Form 1Architect Area Certificate.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer certificate sale.pdf · uploaded 8 Sep 2025Source
- Form 3Form 3 Buildwell 30623.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryBook Sold Buildwell 30623.pdf · uploaded 8 Sep 2025Source
- Form 1Architect Area Certificate 30092023.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate sale 30923.pdf · uploaded 8 Sep 2025Source
- Form 3CA Form 3 Dem Buildwell 30923.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked Inventory30923 Buildwell Book Unsold.pdf · uploaded 8 Sep 2025Source
- Form 1Architect Area Certificate 31122023.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate sale 301223.pdf · uploaded 8 Sep 2025Source
- Form 3Form 3 DEM Phoenix 311223.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventorySold-Booked Inventory Phoenix 31223.pdf · uploaded 8 Sep 2025Source
- Form 1Architect Area Certificate 31324 Phoenix.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate_sale 31324.pdf · uploaded 8 Sep 2025Source
- Form 3Form 3 DEM Phoenix Mar 2024.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Of Sold Booked Inventory.pdf · uploaded 8 Sep 2025Source
- Form 1Phoenix Architect Area Certificate 3062024 c.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate sale 30624.pdf · uploaded 8 Sep 2025Source
- Form 3Form 3 DEM Buildwell 30624 c.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryBuildwell Disclosure Of Sold.pdf · uploaded 8 Sep 2025Source
- Form 1Phoenix Architect Area Certificate 30092024.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate sale 30924.pdf · uploaded 8 Sep 2025Source
- Form 3Form 3 30924.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryBook Sold 300924.pdf · uploaded 8 Sep 2025Source
- Form 1Architect certificate - Dem Phoenix.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate sale 311224.pdf · uploaded 8 Sep 2025Source
- Form 3Form 3 Buildwell 311224.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryDem phoenix Book Sold311224.pdf · uploaded 8 Sep 2025Source
- Form 1Phoenix Architect Area Certificate 31325.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate sale 31325.pdf · uploaded 8 Sep 2025Source
- Form 3FORM 3 Phoenix 31325.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryBook Sold 31325.pdf · uploaded 8 Sep 2025Source
- Form 1Architect Area Certificate 31323.pdf · uploaded 8 Sep 2025Source
- Form 2Engineer Certificate_sale 31323.pdf · uploaded 8 Sep 2025Source
- Form 3Form 3 CA Certificate 310323.pdf · uploaded 8 Sep 2025Source
- Disclosure of Sold and Booked InventoryBook Sold 310323.pdf · uploaded 8 Sep 2025Source
- Form 5 (FY 2024-2025)Form 5 Dem Buildwell.pdf · uploaded 23 Sep 2025Source
- Form 2A (FY 2022-2023)Form 2A 23.pdf · uploaded 29 Sep 2025Source
- Form 2A (FY 2023-2024)Form 2A 24.pdf · uploaded 29 Sep 2025Source
- Form 2A (FY 2024-2025)Form 2A 25.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 1Form1 Phoenix 30625.pdf · uploaded 1 Oct 2025Source
- Withdrawal Update Form 2Form2 Phoenix 30625.pdf · uploaded 1 Oct 2025Source
- Withdrawal Update Form 3Form3 Phoenix 30625.pdf · uploaded 1 Oct 2025Source
- Form 2A (FY 2025-2026)Form 2A 26.pdf · uploaded 1 Oct 2025Source
- Withdrawal Update Form 1Form1 Phoenix.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 2Form2 Phoenix.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 3Form3 Phoenix 30625.pdf · uploaded 7 Jan 2026Source
- Withdrawal Update Form 1Form1 Phoenix.pdf · uploaded 7 Mar 2026Source
- Withdrawal Update Form 2Form2 Phoenix.pdf · uploaded 7 Mar 2026Source
- Withdrawal Update Form 3Form 3 Phoenix.pdf · uploaded 7 Mar 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 30 Jul 2026Source
- Occupational CertificateDEM Phoenix OC.pdf · uploaded 30 Jul 2026Source
- Occupational CertificateFull OC A Wing with Plans.pdf · uploaded 30 Jul 2026Source
- Occupational CertificateFull OC B Wing with Plans.pdf · uploaded 30 Jul 2026Source
Technical
- DocumentLAYOUT.pdf · uploaded 9 Nov 2022Source
- DocumentIOD Copy_1.pdf · uploaded 9 Nov 2022Source
- DocumentIOD Copy_2.pdf · uploaded 9 Nov 2022Source
- DocumentIOD Building 7_1.pdf · uploaded 9 Nov 2022Source
- DocumentIOD Building 7_2.pdf · uploaded 9 Nov 2022Source
- DocumentIOD Building 7_3.pdf · uploaded 9 Nov 2022Source
- DocumentIOD Building 7_4.pdf · uploaded 9 Nov 2022Source
- DocumentIOD Building 7_5.pdf · uploaded 9 Nov 2022Source
- DocumentIOD Building 7_6.pdf · uploaded 9 Nov 2022Source
- DocumentIOD Building 7_7.pdf · uploaded 9 Nov 2022Source
- DocumentIOD Building 7_8.pdf · uploaded 9 Nov 2022Source
- DocumentAmended IOA malad ganesh prasad.pdf · uploaded 6 Jan 2023Source
- DocumentBinder1_Part1_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentBinder1_Part2_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentBinder1_Part3_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentBinder1_Part4_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentBinder1_Part5_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentBinder1_Part6_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentBinder1_Part7_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentBinder1_Part8_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentS36C-622010215520.pdf · uploaded 6 Nov 2024Source
- DocumentPart 1.pdf · uploaded 6 Nov 2024Source
- DocumentPart 2.pdf · uploaded 6 Nov 2024Source
- DocumentPhoenix Full CC .pdf · uploaded 29 Oct 2025Source
Technical (Architect)
- DocumentArchitect Area Certificate Siddhi 30062024 c.pdf · uploaded 28 Oct 2024Source
- DocumentPhoenix Architect Area Certificate 3062024 c.pdf · uploaded 28 Oct 2024Source
- DocumentPhoenix Architect Area Certificate 30092024.pdf · uploaded 2 Dec 2024Source
- DocumentArchitect certificate - Dem Phoenix.pdf · uploaded 10 Mar 2025Source
- DocumentForm 1.pdf · uploaded 8 Jun 2026Source
Technical (Engineer)
- DocumentEngineer Certificate rehab 30624.pdf · uploaded 28 Oct 2024Source
- DocumentEngineer Certificate sale 30624.pdf · uploaded 28 Oct 2024Source
- DocumentEngineer Certificate rehab 30924.pdf · uploaded 2 Dec 2024Source
- DocumentEngineer Certificate sale 30924.pdf · uploaded 2 Dec 2024Source
- DocumentEngineer Certificate rehab 311224.pdf · uploaded 10 Mar 2025Source
- DocumentEngineer Certificate sale 311224.pdf · uploaded 10 Mar 2025Source
- DocumentForm 2.pdf · uploaded 8 Jun 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 118I pt
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Office space, Shop198 units in all
- Address
- 118I pt, 13.4 M Wide DP Road, Tanaji Nagar, Kurar, Malad EPIN 400097
- Village
- Malad, Borivali taluka
- Location
- 19.19104, 72.86079
- Land area for this project
- 1,093 sq m (11,768 sq ft)
- Permissible built-up area
- 8,727 sq m (93,939 sq ft)
- Sanctioned built-up area
- 8,533 sq m (91,851 sq ft)
- Designated bank account
- 109
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
118I pt
Boundaries
- North
- 118I pt
- South
- 118h
- East
- 118e
- West
- 118h
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking198 units
170 of 198 units booked (86%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Dem Phoenix-Wing A | 1BHK | 27.88 sq m · 300 sq ft | 90 | 90 |
| Dem Phoenix-Wing A | 1BHK | 29.64 sq m · 319 sq ft | 8 | 7 |
| Dem Phoenix-Wing A | 1BHK | 29.73 sq m · 320 sq ft | 4 | 4 |
| Dem Phoenix-Wing A | 1BHK | 29.91 sq m · 322 sq ft | 8 | 7 |
| Dem Phoenix-Wing B | 1BHK | 35.12 sq m · 378 sq ft | 20 | 20 |
| Dem Phoenix-Wing B | 2BHK | 48.31 sq m · 520 sq ft | 23 | 11 |
| Dem Phoenix-Wing B | 2BHK | 49.98 sq m · 538 sq ft | 23 | 15 |
| Dem Phoenix-Wing B | 2BHK | 52.95 sq m · 570 sq ft | 20 | 16 |
| Dem Phoenix-Wing B | Office space | 36.32 sq m · 391 sq ft | 1 | 0 |
| Dem Phoenix-Wing B | Shop | 188.22 sq m · 2,026 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Shri Arun Gurav | — |
| Chartered accountant | Amit Kothari & Associates LLP | — |
| Chartered accountant | Bavaliya & Associates | — |
| Engineer | Anil Tippa | — |
| Engineer | Gireesh Rajadhyaksha | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Malad
- Shiv Dham Co Operative Housing Society LtdRERA PR1180002602539
- Laxmi SaffronRERA PM1180002602507
- Palace SapphireRERA PR1180002602499
- Ambit IconiaRERA PR1180002602244
- Kush IconRERA PC1180002602227
- Florence ResidencyRERA PR1180002602069
- Namo Whispering BlissRERA PM1180002602118
- Santosh Prerna Co-Operative Housing Society LimitedRERA PR1180002601791
All 139 projects in Malad · Compare Dem Phoenix with another project