Yashodhan Vihar

Active

Nanda (Ct), Chandrapur 442917 |Promoter: Pm Infraventures

Residential / Group HousingRERAP50900045831
15 Jun 2022Registered with MahaRERA
31 Dec 2026Promised completion
102Buildings
906Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
102
Unit types
1BHK906 units in all
Land area for this project
38,397 sq m (4,13,298 sq ft)
Permissible built-up area
38,397 sq m (4,13,298 sq ft)
Sanctioned built-up area
38,397 sq m (4,13,298 sq ft)
Recreational open space
8,362 sq m (90,008 sq ft)
Address
Kh No 35/1, 35/3, 55, 56, 57, Nanda Fata, Nanda FataPIN 442917
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.77368, 79.13993
Yashodhan Vihar is at latitude 19.77368, longitude 79.13993.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
15 Jun 2022
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5090004583115 Jun 202231 Dec 2026—Pm InfraventuresProject page

102 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
B-01——
B-02——
B-03——
B-04——
B-05——
B-06——
B-07——
B-08——
B-09——
B1216
B-10——
B10216
B-11——
B11216
B-12——
B12216
B-13——
B13216
B-14——
B14216
B-15——
B15216
B-16——
B16216
B-17——
B17216
B-18——
B18216
B-19——
B19216
B2216
B-20——
B20216
B-21——
B21216
B-22——
B22216
B-23——
B23210
B-24——
B24216
B-25——
B25216
B-26——
B26216
B-27——
B27216
B-28——
B28216
B-29——
B29216
B3216
B-30——
B30216
B-31——
B31216
B-32——
B32216
B-33——
B33216
B-34——
B34216
B-35——
B35216
B-36——
B36216
B-37——
B37216
B-38——
B38216
B-39——
B39216
B4216
B-46——
B46324
B-47——
B47324
B-48——
B48324
B-49——
B49324
B5216
B-50——
B50324
B-51——
B51324
B-52——
B52324
B-53——
B53324
B-54——
B54324
B-55——
B55324
B-56——
B56324
B-57——
B57324
B6216
B7216
B8216
B9216

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

906 units registered

1BHK · 906 units
BuildingTypeCarpet areaUnits
B11BHK29.97 sq m · 323 sq ft16
B101BHK29.97 sq m · 323 sq ft16
B111BHK29.97 sq m · 323 sq ft16
B121BHK29.97 sq m · 323 sq ft16
B131BHK29.97 sq m · 323 sq ft16
B141BHK29.97 sq m · 323 sq ft16
B151BHK29.97 sq m · 323 sq ft16
B161BHK29.97 sq m · 323 sq ft16
B171BHK29.97 sq m · 323 sq ft16
B181BHK29.97 sq m · 323 sq ft16
B191BHK29.97 sq m · 323 sq ft16
B21BHK29.97 sq m · 323 sq ft16
B201BHK29.97 sq m · 323 sq ft16
B211BHK29.97 sq m · 323 sq ft16
B221BHK29.97 sq m · 323 sq ft16
B231BHK29.97 sq m · 323 sq ft10
B241BHK29.97 sq m · 323 sq ft16
B251BHK29.97 sq m · 323 sq ft16
B261BHK29.97 sq m · 323 sq ft16
B271BHK29.97 sq m · 323 sq ft16
B281BHK29.97 sq m · 323 sq ft16
B291BHK29.97 sq m · 323 sq ft16
B31BHK29.97 sq m · 323 sq ft16
B301BHK29.97 sq m · 323 sq ft16
B311BHK29.97 sq m · 323 sq ft16
B321BHK29.97 sq m · 323 sq ft16
B331BHK29.97 sq m · 323 sq ft16
B341BHK29.97 sq m · 323 sq ft16
B351BHK29.97 sq m · 323 sq ft16
B361BHK29.97 sq m · 323 sq ft16
B371BHK29.97 sq m · 323 sq ft16
B381BHK29.97 sq m · 323 sq ft16
B391BHK29.97 sq m · 323 sq ft16
B41BHK29.97 sq m · 323 sq ft16
B461BHK29.97 sq m · 323 sq ft24
B471BHK29.97 sq m · 323 sq ft24
B481BHK29.97 sq m · 323 sq ft24
B491BHK29.97 sq m · 323 sq ft24
B51BHK29.97 sq m · 323 sq ft16
B501BHK29.97 sq m · 323 sq ft24
B511BHK29.97 sq m · 323 sq ft24
B521BHK29.97 sq m · 323 sq ft24
B531BHK29.97 sq m · 323 sq ft24
B541BHK29.97 sq m · 323 sq ft24
B551BHK29.97 sq m · 323 sq ft24
B561BHK29.97 sq m · 323 sq ft24
B571BHK29.97 sq m · 323 sq ft24
B61BHK29.97 sq m · 323 sq ft16
B71BHK29.97 sq m · 323 sq ft16
B81BHK29.97 sq m · 323 sq ft16
B91BHK29.97 sq m · 323 sq ft16

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
B1Closed/Covered00000
B1Open Space000021
B10Closed/Covered00000
B10Open Space000021
B11Closed/Covered00000
B11Open Space000021
B12Closed/Covered00000
B12Open Space000021
B13Closed/Covered00000
B13Open Space000021
B14Closed/Covered00000
B14Open Space000021
B15Closed/Covered00000
B15Open Space000021
B16Closed/Covered00000
B16Open Space000021
B17Closed/Covered00000
B17Open Space000021
B18Closed/Covered00000
B18Open Space000021
B19Closed/Covered00000
B19Open Space000021
B2Closed/Covered00000
B2Open Space000021
B20Closed/Covered00000
B20Open Space000021
B21Closed/Covered00000
B21Open Space000021
B22Closed/Covered00000
B22Open Space000021
B23Closed/Covered00000
B23Open Space000016
B24Closed/Covered00000
B24Open Space000021
B25Closed/Covered00000
B25Open Space000021
B26Closed/Covered00000
B26Open Space000021
B27Closed/Covered00000
B27Open Space000021
B28Closed/Covered00000
B28Open Space000021
B29Closed/Covered00000
B29Open Space000021
B3Closed/Covered00000
B3Open Space000021
B30Closed/Covered00000
B30Open Space000021
B31Closed/Covered00000
B31Open Space000021
B32Closed/Covered00000
B32Open Space000021
B33Closed/Covered00000
B33Open Space000021
B34Closed/Covered00000
B34Open Space000021
B35Closed/Covered00000
B35Open Space000021
B36Closed/Covered00000
B36Open Space000021
B37Closed/Covered00000
B37Open Space000021
B38Closed/Covered00000
B38Open Space000021
B39Closed/Covered00000
B39Open Space000021
B4Closed/Covered00000
B4Open Space000021
B46Closed/Covered00000
B46Open Space000032
B47Closed/Covered00000
B47Open Space000032
B48Closed/Covered00000
B48Open Space000032
B49Closed/Covered00000
B49Open Space000032
B5Closed/Covered00000
B5Open Space000021
B50Closed/Covered00000
B50Open Space000032
B51Closed/Covered00000
B51Open Space000032
B52Closed/Covered00000
B52Open Space000032
B53Closed/Covered00000
B53Open Space000032
B54Closed/Covered00000
B54Open Space000032
B55Closed/Covered00000
B55Open Space000032
B56Closed/Covered00000
B56Open Space000032
B57Closed/Covered00000
B57Open Space000032
B6Closed/Covered00000
B6Open Space000021
B7Closed/Covered00000
B7Open Space000021
B8Closed/Covered00000
B8Open Space000021
B9Closed/Covered00000
B9Open Space000021

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

B1

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B10

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B11

  • Excavation64%
  • Basement (if any)56%
  • Podiums (if any)0%
  • Plinth56%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B12

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B13

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B14

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B15

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B16

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B17

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B18

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B19

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B2

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B20

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B21

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B22

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B23

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B24

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B25

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B26

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B27

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B28

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B29

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B3

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B30

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B31

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B32

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B33

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B34

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B35

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B36

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B37

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B38

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B39

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B4

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B46

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B47

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B48

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B49

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B5

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B50

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B51

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B52

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B53

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B54

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B55

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B56

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B57

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B6

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B7

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B8

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B9

  • Excavation82%
  • Basement (if any)82%
  • Podiums (if any)0%
  • Plinth82%
  • Stilt Floor0%
  • Slabs of Super Structure11%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsAs per Sanction Map10%
  • Water SupplyAs per Sanction Map0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per Sanction Map0%
  • Storm Water DrainsAs per Sanction Map10%
  • Landscaping & Tree PlantingAs per Sanction Map0%
  • Street LightingAs per Sanction Map0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAs per Sanction Map0%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per Sanction Map0%
  • Energy managemcntAs per Sanction Map0%
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceAs per Sanction Map0%
  • Open ParkingAs per Sanction Map0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

45 documents held by Deedo, 51 filings listed on MahaRERA's project page

Titles

Form 1s

Form 2s

Others

Allotment letters

Encumbrance

Form b

Commencement certificates

Registration certificate

Form 5s

Layout plan

Building plans

Document library

  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate May 22.pdf · uploaded 5 Jun 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate May 2022.pdf · uploaded 5 Jun 2022View
  • Copy of the legal title reportTitle Report.pdf · uploaded 5 Jun 2022View
  • Proforma of Allotment letterAllotment letter.pdf · uploaded 5 Jun 2022View
  • Proforma of Allotment letterAgreement to sell - Draft.pdf · uploaded 5 Jun 2022View
  • CERSAI detailsCERSAI_Search_Report_200239407988_For_Asset_Based_Search_09_06_2022_20_09_39_048.pdf · uploaded 5 Jun 2022View
  • Details of encumbrancesLAND FREE OF ENCUMRANCE_0001.pdf · uploaded 9 Jun 2022View
  • Copy of the legal title report1 Details of encumbrances.pdf · uploaded 9 Jun 2022View
  • Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 9 Jun 2022View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan.pdf · uploaded 9 Jun 2022View
  • Building Plan Approval / NA Order for plotted developmentIOA_Letter from MHADA.pdf · uploaded 9 Jun 2022View
  • Declaration in FORM BFORM-B.pdf · uploaded 9 Jun 2022View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 13 Jun 2022View
  • Declaration about Commencement CertificateForm D.pdf · uploaded 13 Jun 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Form Ph-2 Sep 2022_opt.pdf · uploaded 20 Feb 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Form Ph-2 Dec 2022_opt.pdf · uploaded 20 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Phase 2- Form 2- Engineers Certificate- July 22 to Sept 22.pdf · uploaded 1 May 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Phase 2- Form 2- Engineers Certificate- Sept 22 to Dec 22.pdf · uploaded 1 May 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ph2 engg cert jan-mar23 .pdf · uploaded 13 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ph2 engg cert apr-june 23.pdf · uploaded 13 Oct 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM - V CA CERT FY 22-23 PH-II.pdf · uploaded 17 Feb 2024View
  • Proforma of Agreement for saleAgreement to sale draft_compressed.pdf · uploaded 14 Mar 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)3 31 03 2024 906.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2 31 12 23 906.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)1 30 09 23 906.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)5 30 09 2024 906.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)4 30 06 24 906.pdf · uploaded 22 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)6 31 12 24 906.pdf · uploaded 22 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Phase 2 FORM 5.pdf · uploaded 22 Feb 2025View
  • Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto Sept 23.pdf · uploaded 22 Feb 2025View
  • Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto Dec 23.pdf · uploaded 22 Feb 2025View
  • Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto March 24.pdf · uploaded 22 Feb 2025View
  • Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto June 24.pdf · uploaded 22 Feb 2025View
  • Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto Sept 24.pdf · uploaded 22 Feb 2025View
  • Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto Dec 24.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)July to Sept 23- Phase 1- Architects Certificate.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Oct to Dec 23- Phase 1- Architects Certificate (1).pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Oct to Dec 23- Phase 1- Architects Certificate (1).pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)July to Sept 23- Phase 2- Architects Certificate.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Oct to Dec 23- Phase 2- Architects Certificate.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Jan to Mar 24- Phase 2- Form 1- Architects Certificate.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Apr to Jun 24- Phase 2- Architects Certificate.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)July to Sep 24- Phase 2- Architects Certificate.pdf · uploaded 22 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Oct to Dec 24- Phase 2- Architects Certificate.pdf · uploaded 22 Feb 2025View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 5 Jun 2022View
  • Legal Title report1 Details of encumbrances.pdf · uploaded 9 Jun 2022View
  • Declaration Form BFORM-B.pdf · uploaded 9 Jun 2022View

Technical documents

  • Layout ApprovalLayout Plan.pdfView
  • Building Plan ApprovalBuilding Plan.pdfView
  • Building Plan ApprovalIOA_Letter from MHADA.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nanda (CT), Korpana taluka

Survey, CTS, gat or plot numbers

35/3555657Kh No 35/1

As published on MahaRERA's project page

Kh No 35/1, 35/3, 55, 56, 57

Boundaries

North
Kh No 34
South
By Bibi Shiv
East
Kh No 36 37 54
West
Kh No 59 and 29

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAAJ Engineers andConsultants Private Limited—
Chartered accountantCA Girish Atlani—
Chartered accountantHusain Shakir & Co—
EngineerDhiraj Jagyasi—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology