Yashodhan Vihar
ActiveNanda (Ct), Chandrapur 442917 |Promoter: Pm Infraventures
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Active
- Buildings
- 102
- Unit types
- 1BHK906 units in all
- Land area for this project
- 38,397 sq m (4,13,298 sq ft)
- Permissible built-up area
- 38,397 sq m (4,13,298 sq ft)
- Sanctioned built-up area
- 38,397 sq m (4,13,298 sq ft)
- Recreational open space
- 8,362 sq m (90,008 sq ft)
- Address
- Kh No 35/1, 35/3, 55, 56, 57, Nanda Fata, Nanda FataPIN 442917
- Designated bank account
- State Bank Of India
- Litigation declared by promoter
- None declared
- Financial encumbrance declared
- None declared
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2026
- Registered
- 15 Jun 2022
- Promised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P50900045831 | 15 Jun 2022 | 31 Dec 2026 | — | Pm Infraventures | Project page |
102 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| B-01 | — | — |
| B-02 | — | — |
| B-03 | — | — |
| B-04 | — | — |
| B-05 | — | — |
| B-06 | — | — |
| B-07 | — | — |
| B-08 | — | — |
| B-09 | — | — |
| B1 | 2 | 16 |
| B-10 | — | — |
| B10 | 2 | 16 |
| B-11 | — | — |
| B11 | 2 | 16 |
| B-12 | — | — |
| B12 | 2 | 16 |
| B-13 | — | — |
| B13 | 2 | 16 |
| B-14 | — | — |
| B14 | 2 | 16 |
| B-15 | — | — |
| B15 | 2 | 16 |
| B-16 | — | — |
| B16 | 2 | 16 |
| B-17 | — | — |
| B17 | 2 | 16 |
| B-18 | — | — |
| B18 | 2 | 16 |
| B-19 | — | — |
| B19 | 2 | 16 |
| B2 | 2 | 16 |
| B-20 | — | — |
| B20 | 2 | 16 |
| B-21 | — | — |
| B21 | 2 | 16 |
| B-22 | — | — |
| B22 | 2 | 16 |
| B-23 | — | — |
| B23 | 2 | 10 |
| B-24 | — | — |
| B24 | 2 | 16 |
| B-25 | — | — |
| B25 | 2 | 16 |
| B-26 | — | — |
| B26 | 2 | 16 |
| B-27 | — | — |
| B27 | 2 | 16 |
| B-28 | — | — |
| B28 | 2 | 16 |
| B-29 | — | — |
| B29 | 2 | 16 |
| B3 | 2 | 16 |
| B-30 | — | — |
| B30 | 2 | 16 |
| B-31 | — | — |
| B31 | 2 | 16 |
| B-32 | — | — |
| B32 | 2 | 16 |
| B-33 | — | — |
| B33 | 2 | 16 |
| B-34 | — | — |
| B34 | 2 | 16 |
| B-35 | — | — |
| B35 | 2 | 16 |
| B-36 | — | — |
| B36 | 2 | 16 |
| B-37 | — | — |
| B37 | 2 | 16 |
| B-38 | — | — |
| B38 | 2 | 16 |
| B-39 | — | — |
| B39 | 2 | 16 |
| B4 | 2 | 16 |
| B-46 | — | — |
| B46 | 3 | 24 |
| B-47 | — | — |
| B47 | 3 | 24 |
| B-48 | — | — |
| B48 | 3 | 24 |
| B-49 | — | — |
| B49 | 3 | 24 |
| B5 | 2 | 16 |
| B-50 | — | — |
| B50 | 3 | 24 |
| B-51 | — | — |
| B51 | 3 | 24 |
| B-52 | — | — |
| B52 | 3 | 24 |
| B-53 | — | — |
| B53 | 3 | 24 |
| B-54 | — | — |
| B54 | 3 | 24 |
| B-55 | — | — |
| B55 | 3 | 24 |
| B-56 | — | — |
| B56 | 3 | 24 |
| B-57 | — | — |
| B57 | 3 | 24 |
| B6 | 2 | 16 |
| B7 | 2 | 16 |
| B8 | 2 | 16 |
| B9 | 2 | 16 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
906 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| B1 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B10 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B11 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B12 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B13 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B14 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B15 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B16 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B17 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B18 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B19 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B2 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B20 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B21 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B22 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B23 | 1BHK | 29.97 sq m · 323 sq ft | 10 |
| B24 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B25 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B26 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B27 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B28 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B29 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B3 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B30 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B31 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B32 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B33 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B34 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B35 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B36 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B37 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B38 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B39 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B4 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B46 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B47 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B48 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B49 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B5 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B50 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B51 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B52 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B53 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B54 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B55 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B56 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B57 | 1BHK | 29.97 sq m · 323 sq ft | 24 |
| B6 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B7 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B8 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
| B9 | 1BHK | 29.97 sq m · 323 sq ft | 16 |
Parking
| Building | Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|---|
| B1 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B1 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B10 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B10 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B11 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B11 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B12 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B12 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B13 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B13 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B14 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B14 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B15 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B15 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B16 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B16 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B17 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B17 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B18 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B18 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B19 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B19 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B2 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B2 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B20 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B20 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B21 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B21 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B22 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B22 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B23 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B23 | Open Space | 0 | 0 | 0 | 0 | 16 |
| B24 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B24 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B25 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B25 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B26 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B26 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B27 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B27 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B28 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B28 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B29 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B29 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B3 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B3 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B30 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B30 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B31 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B31 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B32 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B32 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B33 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B33 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B34 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B34 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B35 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B35 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B36 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B36 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B37 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B37 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B38 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B38 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B39 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B39 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B4 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B4 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B46 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B46 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B47 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B47 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B48 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B48 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B49 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B49 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B5 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B5 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B50 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B50 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B51 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B51 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B52 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B52 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B53 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B53 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B54 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B54 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B55 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B55 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B56 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B56 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B57 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B57 | Open Space | 0 | 0 | 0 | 0 | 32 |
| B6 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B6 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B7 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B7 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B8 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B8 | Open Space | 0 | 0 | 0 | 0 | 21 |
| B9 | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| B9 | Open Space | 0 | 0 | 0 | 0 | 21 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress
Work completed, as the promoter reported it to MahaRERA (Form 1)
B1
B10
B11
B12
B13
B14
B15
B16
B17
B18
B19
B2
B20
B21
B22
B23
B24
B25
B26
B27
B28
B29
B3
B30
B31
B32
B33
B34
B35
B36
B37
B38
B39
B4
B46
B47
B48
B49
B5
B50
B51
B52
B53
B54
B55
B56
B57
B6
B7
B8
B9
Common areas and amenities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Documents
45 documents held by Deedo, 51 filings listed on MahaRERA's project page
Form 1s
- Form 15 Jun 2022ViewSource
- Form 120 Feb 2023ViewSource
- Form 120 Feb 2023ViewSource
- Form 113 Oct 2023ViewSource
- Form 113 Oct 2023ViewSource
- Form 122 Feb 2025ViewSource
- Form 122 Feb 2025ViewSource
- Form 122 Feb 2025ViewSource
- Form 122 Feb 2025ViewSource
- Form 122 Feb 2025ViewSource
- Form 122 Feb 2025ViewSource
- Form 122 Feb 2025ViewSource
- Form 122 Feb 2025ViewSource
Form 2s
Others
Commencement certificates
Document library
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate May 22.pdf · uploaded 5 Jun 2022View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate May 2022.pdf · uploaded 5 Jun 2022View
- Copy of the legal title reportTitle Report.pdf · uploaded 5 Jun 2022View
- Proforma of Allotment letterAllotment letter.pdf · uploaded 5 Jun 2022View
- Proforma of Allotment letterAgreement to sell - Draft.pdf · uploaded 5 Jun 2022View
- CERSAI detailsCERSAI_Search_Report_200239407988_For_Asset_Based_Search_09_06_2022_20_09_39_048.pdf · uploaded 5 Jun 2022View
- Details of encumbrancesLAND FREE OF ENCUMRANCE_0001.pdf · uploaded 9 Jun 2022View
- Copy of the legal title report1 Details of encumbrances.pdf · uploaded 9 Jun 2022View
- Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 9 Jun 2022View
- Building Plan Approval / NA Order for plotted developmentBuilding Plan.pdf · uploaded 9 Jun 2022View
- Building Plan Approval / NA Order for plotted developmentIOA_Letter from MHADA.pdf · uploaded 9 Jun 2022View
- Declaration in FORM BFORM-B.pdf · uploaded 9 Jun 2022View
- Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 13 Jun 2022View
- Declaration about Commencement CertificateForm D.pdf · uploaded 13 Jun 2022View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Form Ph-2 Sep 2022_opt.pdf · uploaded 20 Feb 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Form Ph-2 Dec 2022_opt.pdf · uploaded 20 Feb 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Phase 2- Form 2- Engineers Certificate- July 22 to Sept 22.pdf · uploaded 1 May 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Phase 2- Form 2- Engineers Certificate- Sept 22 to Dec 22.pdf · uploaded 1 May 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)ph2 engg cert jan-mar23 .pdf · uploaded 13 Oct 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)ph2 engg cert apr-june 23.pdf · uploaded 13 Oct 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM - V CA CERT FY 22-23 PH-II.pdf · uploaded 17 Feb 2024View
- Proforma of Agreement for saleAgreement to sale draft_compressed.pdf · uploaded 14 Mar 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)3 31 03 2024 906.pdf · uploaded 22 Feb 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)2 31 12 23 906.pdf · uploaded 22 Feb 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)1 30 09 23 906.pdf · uploaded 22 Feb 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)5 30 09 2024 906.pdf · uploaded 22 Feb 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)4 30 06 24 906.pdf · uploaded 22 Feb 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)6 31 12 24 906.pdf · uploaded 22 Feb 2025View
- Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Phase 2 FORM 5.pdf · uploaded 22 Feb 2025View
- Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto Sept 23.pdf · uploaded 22 Feb 2025View
- Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto Dec 23.pdf · uploaded 22 Feb 2025View
- Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto March 24.pdf · uploaded 22 Feb 2025View
- Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto June 24.pdf · uploaded 22 Feb 2025View
- Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto Sept 24.pdf · uploaded 22 Feb 2025View
- Disclosure of sold/ booked inventoryDiscloser Sold Booked Inventory 906 - Upto Dec 24.pdf · uploaded 22 Feb 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)July to Sept 23- Phase 1- Architects Certificate.pdf · uploaded 22 Feb 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Oct to Dec 23- Phase 1- Architects Certificate (1).pdf · uploaded 22 Feb 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Oct to Dec 23- Phase 1- Architects Certificate (1).pdf · uploaded 22 Feb 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)July to Sept 23- Phase 2- Architects Certificate.pdf · uploaded 22 Feb 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Oct to Dec 23- Phase 2- Architects Certificate.pdf · uploaded 22 Feb 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Jan to Mar 24- Phase 2- Form 1- Architects Certificate.pdf · uploaded 22 Feb 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Apr to Jun 24- Phase 2- Architects Certificate.pdf · uploaded 22 Feb 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)July to Sep 24- Phase 2- Architects Certificate.pdf · uploaded 22 Feb 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Oct to Dec 24- Phase 2- Architects Certificate.pdf · uploaded 22 Feb 2025View
Promoter documents
Technical documents
Proforma allotment letter
- Proforma allotment letterAllotment letter.pdfView
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Nanda (CT), Korpana taluka
Survey, CTS, gat or plot numbers
As published on MahaRERA's project page
Kh No 35/1, 35/3, 55, 56, 57
Boundaries
- North
- Kh No 34
- South
- By Bibi Shiv
- East
- Kh No 36 37 54
- West
- Kh No 59 and 29
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | AAJ Engineers andConsultants Private Limited | — |
| Chartered accountant | CA Girish Atlani | — |
| Chartered accountant | Husain Shakir & Co | — |
| Engineer | Dhiraj Jagyasi | — |
Source: MahaRERA project page. Contact details are not shown.