Bokade layout

Completed

Brahmapuri (M Cl), Chandrapur 441206 |Promoter: Mahendra Shrawanji Bokade & Others

19 Dec 2019Registered with MahaRERA
30 Mar 2024Promised completion
30 Mar 2025Revised completionPushed back 1 year
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Completed
Land area for this project
8,319 sq m (89,545 sq ft)
Permissible built-up area
0 sq m (0 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
1,213 sq m (13,057 sq ft)
Address
447, Near gurudev nagar Nagpur Road, BrahmapuriPIN 441206
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 1 year and 7 months ago.

Registered
19 Dec 2019
Promised
30 Mar 2024
Revised
30 Mar 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5090002357119 Dec 201930 Mar 202430 Mar 2025Mahendra Shrawanji Bokade & OthersProject page

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsInternal Road100%
  • Water SupplyBorewell100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsStorm Water Drains100%
  • Landscaping & Tree PlantingTree Plantation100%
  • Street LightingStreet Light100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationTransformer100%
  • Aggregate area of recreational Open SpaceOpen Space100%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

79 documents held by Deedo, 90 filings listed on MahaRERA's project page

Others

Registration certificate

Extension certificate

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 10 Dec 2019View
  • Details of encumbrancesEncumbrances.pdf · uploaded 10 Dec 2019View
  • Copy of Layout Approval (in case of layout)map.pdf · uploaded 10 Dec 2019View
  • Building Plan Approval / NA Order for plotted developmentNA Order - Nagar Parishad.pdf · uploaded 10 Dec 2019View
  • Commencement Certificates / NA Order for plotted developmentNA Order - Nagar Parishad.pdf · uploaded 10 Dec 2019View
  • Declaration in FORM BForm B.pdf · uploaded 10 Dec 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form - 1 Architect.pdf · uploaded 10 Dec 2019View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form - 2.pdf · uploaded 10 Dec 2019View
  • Proforma of Allotment letter7 ATS.pdf · uploaded 17 Dec 2019View
  • Proforma of Allotment letter8 Allotment Letter.pdf · uploaded 17 Dec 2019View
  • Other14 Credai Membership.pdf · uploaded 17 Dec 2019View
  • Other10 NA Permission - 42.pdf · uploaded 17 Dec 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form - 1 Architect.pdf · uploaded 13 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form - 2 Engineer.pdf · uploaded 13 Aug 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31-03-2020.pdf · uploaded 25 May 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 30-06-2020.pdf · uploaded 25 May 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM -1 30-09-2020.pdf · uploaded 25 May 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (31-12-2020).pdf · uploaded 25 May 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (31-03-2021).pdf · uploaded 25 May 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (30-06-2021).pdf · uploaded 25 May 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (30-09-2021).pdf · uploaded 25 May 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (31-12-2021).pdf · uploaded 25 May 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)31-03-2020.pdf · uploaded 25 May 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2 30-06-2020.pdf · uploaded 25 May 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2 30-09-2020.pdf · uploaded 25 May 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 2 (31-12-2020).pdf · uploaded 25 May 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (31-03-2021).pdf · uploaded 25 May 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (30-06-2021).pdf · uploaded 25 May 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (30-09-2021).pdf · uploaded 25 May 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (31-12-2021).pdf · uploaded 25 May 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM-2A 30-3-2020.pdf · uploaded 25 May 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM-2A 3006-2020.pdf · uploaded 25 May 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM -2A 30-03-2020.pdf · uploaded 25 May 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A (30-03-2020).pdf · uploaded 25 May 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A (30-03-2020).pdf · uploaded 25 May 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A (30-03-2020).pdf · uploaded 25 May 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A (30-03-2020).pdf · uploaded 25 May 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - 31-03-22.pdf · uploaded 9 Aug 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 date 31-03-0-2022.pdf · uploaded 9 Aug 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form -2A date 31-03-22.pdf · uploaded 9 Aug 2022View
  • Disclosure of sold/ booked inventory29_31-3-22.pdf · uploaded 9 Aug 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 05-07-2022.pdf · uploaded 9 Aug 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM -2 30-06-2022.pdf · uploaded 9 Aug 2022View
  • Disclosure of sold/ booked inventory29 _30-06-22.pdf · uploaded 9 Aug 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development9 NA Order - Nagar Parishad.pdf · uploaded 22 Sep 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form-1 30-09-22.pdf · uploaded 7 Jun 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31-12-2022.pdf · uploaded 7 Jun 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31-03-2023.pdf · uploaded 7 Jun 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 30-06-2023.pdf · uploaded 7 Jun 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 30-09-2023.pdf · uploaded 7 Jun 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-12-23.pdf · uploaded 7 Jun 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form-1 31-03-2024.pdf · uploaded 7 Jun 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30-9-22.pdf · uploaded 7 Jun 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form-2 31-12-202.pdf · uploaded 7 Jun 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form-2 31-03-23.pdf · uploaded 7 Jun 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form-230-06-2023.pdf · uploaded 7 Jun 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form-2 30-09-2023.pdf · uploaded 7 Jun 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form-2 31-12-2023.pdf · uploaded 7 Jun 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form-2 31 -03-24.pdf · uploaded 7 Jun 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)form -2A date 31-03-22.pdf · uploaded 7 Jun 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)form-2a 31-03-23.pdf · uploaded 7 Jun 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form-2a 31-03-2024.pdf · uploaded 7 Jun 2024View
  • Disclosure of sold/ booked inventorydisclosure of sold 30-09-2022.pdf · uploaded 7 Jun 2024View
  • Disclosure of sold/ booked inventorydisclosure of sold 31-12-2022.pdf · uploaded 7 Jun 2024View
  • Disclosure of sold/ booked inventorydisclosure of sold 31-03-23.pdf · uploaded 7 Jun 2024View
  • Disclosure of sold/ booked inventorydisclosure of sold 30-062023.pdf · uploaded 7 Jun 2024View
  • Disclosure of sold/ booked inventorydisclosure of sold 30-09-23.pdf · uploaded 7 Jun 2024View
  • Disclosure of sold/ booked inventorydisclosure of sold 31-12-2023.pdf · uploaded 7 Jun 2024View
  • Disclosure of sold/ booked inventorydisclosure of sold 31-03-2024.pdf · uploaded 7 Jun 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 31-3-20.pdf · uploaded 7 Jun 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 31-3-21.pdf · uploaded 7 Jun 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form 5 31-3-22.pdf · uploaded 7 Jun 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 31-3-23.pdf · uploaded 7 Jun 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 31-3-24.pdf · uploaded 7 Jun 2024View
  • Declaration in FORM BForm B.pdf · uploaded 7 Jun 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration for Bank.pdf · uploaded 24 Jun 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Form 1.pdf · uploaded 13 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Form 2.pdf · uploaded 13 Jul 2024View
  • Disclosure of sold/ booked inventory11_Annexure 29.pdf · uploaded 13 Jul 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Mahendra Bokade.pdf · uploaded 13 Jul 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 13 Jul 2024View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 13 Jul 2024View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 10 Dec 2019View
  • Declaration Form BForm B.pdf · uploaded 10 Dec 2019View
  • Declaration Form BForm B.pdf · uploaded 7 Jun 2024View

Technical documents

  • Layout Approvalmap.pdfView
  • NA Order for Plotted DevelopmentNA Order - Nagar Parishad.pdfView

Other legal documents

  • Other14 Credai Membership.pdfView
  • Other10 NA Permission - 42.pdfView

Proforma allotment letter

  • Proforma allotment letter8 Allotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Brahmapuri (M Cl), Brahmapuri taluka

Survey, CTS, gat or plot numbers

447

As published on MahaRERA's project page

447

Boundaries

North
Layout of Nandu Pise
South
Boundary of Delanwadi - Brahmapuri
East
Layout of Nandu Pise and Wairkar
West
Layout Of Tushar Raut

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSarang Mendhule—
Chartered accountantAbhinav Welekar—
EngineerLiladhar B Kukade—
OtherNitin Amborkar—

Source: MahaRERA project page. Contact details are not shown.