Others · 6 buildings · 272 unitsRERA P51500014749

Himalaya Residency

Deedo IDDP-AUR-MNCW

Its promised completion date, Dec 2024, has passed and MahaRERA does not show it completed; no MahaRERA orders on record.

Devlai, Aurangabad 431010 · by Majid Khan Rahim Khan Abdul

Delivery1 yr 11 mo past duePromised Dec 2024 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has read

Buying a flat here?

See every deed registered on it.

Its promised completion date, Dec 2024, has passed and MahaRERA does not show it completed

  • This projectRegistered 2 Jan 2018, completion promised 30 Dec 2024, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

6 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page. Construction % is the average of the developer's own declared activity progress to MahaRERA, not an inspection.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51500014749
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P515000147492 Jan 201830 Dec 2024—Majid Khan Rahim Khan AbdulProject page
Documents23

9 documents held by Deedo, 14 filings listed on MahaRERA's project page

Title report

Form B

Registration certificate

Other (2)

Layout plan

Building plan (2)

Show all 23 documentsShow fewer documents

Allotment letter

Document library

  • Copy of Layout Approval (in case of layout)Layout2.pdf · uploaded 17 Nov 2017View
  • Building Plan Approval (IOD)AMC Commencement Certificate.pdf · uploaded 17 Nov 2017View
  • Commencement Certificates / NA Order for plotted developmentAMC Commencement Certificate.pdf · uploaded 17 Nov 2017View
  • Building Plan Approval (IOD)Layout.pdf · uploaded 17 Nov 2017View
  • Copy of the legal title reportLegal Search.pdf · uploaded 27 Dec 2017View
  • Details of encumbrancesLegal Search.pdf · uploaded 27 Dec 2017View
  • Proforma of Allotment letterATS.pdf · uploaded 27 Dec 2017View
  • Declaration in FORM BForm B.pdf · uploaded 27 Dec 2017View

Promoter documents

  • Legal Title reportLegal Search.pdf · uploaded 27 Dec 2017View
  • Declaration Form BForm B.pdf · uploaded 27 Dec 2017View

Technical documents

  • Layout ApprovalLayout2.pdfView
  • Building Plan ApprovalAMC Commencement Certificate.pdfView
  • Building Plan ApprovalLayout.pdfView

Proforma allotment letter

  • Proforma allotment letterATS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Gut No 138

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Lapsed
Unit types
2 BHK, Studio apartment, Shop, WING C1 1BHK, WING C2 1 BHK, WING C3 1BHK, WING D1 1 BHK, WING D2 1 BHK, WING E1 1BHK, WING E2 1BHK, WING E3 1BHK, 1 BHK272 units in all
Address
Gut No 138, Beed By Pass, Beed By Pass DevlaiPIN 431010
Village
Devlai, Aurangabad taluka
Land area for this project
8,165 sq m (87,883 sq ft)
Permissible built-up area
15,179 sq m (1,63,384 sq ft)
Sanctioned built-up area
8,579 sq m (92,343 sq ft)
Recreational open space
820 sq m (8,828 sq ft)
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Survey, CTS, gat or plot numbers

Gut No 138

Land as published on MahaRERA's project page

Gut No 138

Boundaries

North
Gut No 134
South
Gut No 138 Part
East
15 M Wide road and Gut No 139
West
30 Mt Wide Road and Gut no 138 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking272 units · 59 parking spaces

272 units registered

2 BHK · 2 unitsStudio apartment · 30 unitsShop · 32 unitsWING C1 1BHK · 20 unitsWING C2 1 BHK · 20 unitsWING C3 1BHK · 20 unitsWING D1 1 BHK · 20 unitsWING D2 1 BHK · 20 unitsWING E1 1BHK · 20 unitsWING E2 1BHK · 20 unitsWING E3 1BHK · 20 units1 BHK · 48 units
BuildingTypeCarpet areaUnits
Block A2 BHK78.72 sq m · 847 sq ft2
Block BStudio apartment27.77 sq m · 299 sq ft5
Block BStudio apartment29.91 sq m · 322 sq ft15
Block BStudio apartment30.33 sq m · 326 sq ft10
Block CShop21.25 sq m · 229 sq ft6
Block CShop25.3 sq m · 272 sq ft6
Block CWING C1 1BHK35.84 sq m · 386 sq ft20
Block CWING C2 1 BHK35.84 sq m · 386 sq ft20
Show all 20 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnits
Block CWING C3 1BHK35.84 sq m · 386 sq ft20
Block DShop21.25 sq m · 229 sq ft4
Block DShop25.3 sq m · 272 sq ft4
Block DWING D1 1 BHK35.84 sq m · 386 sq ft20
Block DWING D2 1 BHK35.84 sq m · 386 sq ft20
Block EShop21.25 sq m · 229 sq ft6
Block EShop25.3 sq m · 272 sq ft6
Block EWING E1 1BHK35.84 sq m · 386 sq ft20
Block EWING E2 1BHK35.84 sq m · 386 sq ft20
Block EWING E3 1BHK35.84 sq m · 386 sq ft20
MHADA F Building1 BHK32.04 sq m · 345 sq ft24
MHADA F Building1 BHK32.49 sq m · 350 sq ft24

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Block AClosed/Covered00001
Block AOpen Space00000
Block BClosed/Covered00008
Block BOpen Space00000
Block CClosed/Covered000015
Block COpen Space00000
Block DClosed/Covered000010
Block DOpen Space00000
Show all 12 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Block EClosed/Covered000015
Block EOpen Space00000
MHADA F BuildingClosed/Covered000010
MHADA F BuildingOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress7 buildings and areas

Work completed, as the promoter reported it to MahaRERA (Form 1)

Block A

  • Excavation50%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block B

  • Excavation50%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block C

  • Excavation50%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Show all 7 buildings and common areasShow fewer buildings and common areas

Block D

  • Excavation50%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Block E

  • Excavation50%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

MHADA F Building

  • Excavation50%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsPROJECT INTERNAL ROAD0%
  • Water SupplyFROM BOARWELL0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)DRAINAGE LINE AND SEPTIC TANK0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingFOR OPEN SPACE AREA ONLY0%
  • Street LightingINTERNAL PROJECT ROADS ONLY0%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING AS PER NORMS0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAS PER REQUIRED BY FIRE DEPARTMENT0%
  • Electrical meter room, sub-station, receiving stationAS PER REQUIRED BY MSEB0%
  • Aggregate area of recreational Open SpaceGARDEN DEVELOPMENT AND CHILDREN PLAY AREA0%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Professionals1

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPranay Chndratreya—

Source: MahaRERA project page. Contact details are not shown.