Promised date passed7 floorsRERA P51500014749
Block E, Himalaya Residency
MahaRERA has not published a flat-by-flat record for this tower, and no registered deed names it yet.
Median saleNot on recordneeds 3 or more sales
Promised completion30 Dec 2024RERA registration
Units & parking in Block E
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| SHOP | 21.3 m² (229 sq.ft) | 6 | Not on record |
| SHOP | 25.3 m² (272 sq.ft) | 6 | Not on record |
| WING E1 1BHK | 35.8 m² (386 sq.ft) | 20 | Not on record |
| WING E2 1BHK | 35.8 m² (386 sq.ft) | 20 | Not on record |
| WING E3 1BHK | 35.8 m² (386 sq.ft) | 20 | Not on record |
Parking: Closed/Covered 15 · Open Space 0 (as declared to MahaRERA)
Construction progress (declared)
Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.
- Excavation50%
- Basement (if any)0%
- Podiums (if any)0%
- Plinth0%
- Stilt Floor0%
- Slabs of Super Structure0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
- Sanitary Fittings within the flats / premises0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
As registered with MahaRERA
- Sanctioned habitable floors
- 7
- Deedo ID
- BLD_010293
Data through10 Oct 2026SourcesMahaRERA registration and project page · IGR Maharashtra Index IIFloors and units are as registered; a promoter can revise them in later filings. Party names appear only inside an unlocked Index II.Methodology