My World Plot No 3
Deedo IDDP-AUR-XBN2Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 46% of its units are booked.
Chikalthana, Aurangabad 431210 · by Simar Pride Ventures Llp · 100% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 4 Apr 2018, completion promised 30 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
9 buildings
Open a building to see every flat, floor by floor.
- Building C110 floors · 18 units67% booked
- Building C210 floors · 18 units56% booked
- Building C39 floors · 18 units50% booked
- Building C411 floors · 18 units67% booked
- Building C511 floors · 18 units11% booked
- Building C812 floors
- Building C912 floors
- Club House6 floors · 3 units0% booked
- Commercial Building6 floors · 5 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51500015899
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51500015899 | 4 Apr 2018 | 30 Dec 2026 | 30 Apr 2027 | Simar Pride Ventures LLP | Project page |
Documents388
1 document held by Deedo, 387 filings listed on MahaRERA's project page
Finance
- PAN Cardpdf - simar pride pan card.pdf · uploaded 23 Mar 2018Source
Legal
- Legal Title reportgut no 708 search report dated 16-03-2018.pdf · uploaded 23 Mar 2018Source
- Declaration Form BSimar Pride Plot no3 C1 to C9.pdf · uploaded 23 Mar 2018Source
- OtherNew Doc 2019-09-28 174027_1.pdf · uploaded 30 Sep 2019Source
- Other200311142723_0001 (1).pdf · uploaded 11 Mar 2020Source
- OtherDeclaration by Devloper.pdf · uploaded 21 Dec 2020Source
Migrated
- 1 PAN Cardpdf - simar pride pan card.pdf · uploaded 23 Mar 2018Source
Show all 388 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportgut no 708 search report dated 16-03-2018.pdf · uploaded 23 Mar 2018Source
- 1 Details of encumbrancesEncumbrance Plot No3.pdf · uploaded 23 Mar 2018Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT ORDER 1MB.pdf · uploaded 23 Mar 2018Source
- 1 Building Plan Approval (IOD)1-14.pdf · uploaded 23 Mar 2018Source
- 2 Building Plan Approval (IOD)2-14.pdf · uploaded 23 Mar 2018Source
- 3 Building Plan Approval (IOD)3-14.pdf · uploaded 23 Mar 2018Source
- 4 Building Plan Approval (IOD)4-14.pdf · uploaded 23 Mar 2018Source
- 5 Building Plan Approval (IOD)5-14.pdf · uploaded 23 Mar 2018Source
- 6 Building Plan Approval (IOD)6-14.pdf · uploaded 23 Mar 2018Source
- 7 Building Plan Approval (IOD)7-14.pdf · uploaded 23 Mar 2018Source
- 8 Building Plan Approval (IOD)8-14.pdf · uploaded 23 Mar 2018Source
- 9 Building Plan Approval (IOD)9-14.pdf · uploaded 23 Mar 2018Source
- 10 Building Plan Approval (IOD)10-14.pdf · uploaded 23 Mar 2018Source
- 11 Building Plan Approval (IOD)11-14.pdf · uploaded 23 Mar 2018Source
- 12 Building Plan Approval (IOD)12-14.pdf · uploaded 23 Mar 2018Source
- 13 Building Plan Approval (IOD)13-14.pdf · uploaded 23 Mar 2018Source
- 14 Building Plan Approval (IOD)14-14.pdf · uploaded 23 Mar 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentPLOT NO-1 PERMISSION NO- 1029.pdf · uploaded 23 Mar 2018Source
- 1 Declaration in FORM BSimar Pride Plot no3 C1 to C9.pdf · uploaded 23 Mar 2018Source
- 1 Certificates of CA (Form 3)SIMAR PRIDE- PLOT NO 3 - CA CERTIFICATE C1 TO C9.pdf · uploaded 23 Mar 2018Source
- 1 Proforma of Allotment letterMY WORLD SCAN.pdf · uploaded 23 Mar 2018Source
- 15 Building Plan Approval (IOD)1-12.pdf · uploaded 6 Apr 2018Source
- 16 Building Plan Approval (IOD)2-12.pdf · uploaded 6 Apr 2018Source
- 17 Building Plan Approval (IOD)3-12.pdf · uploaded 6 Apr 2018Source
- 18 Building Plan Approval (IOD)4-12.pdf · uploaded 6 Apr 2018Source
- 19 Building Plan Approval (IOD)5-12.pdf · uploaded 6 Apr 2018Source
- 20 Building Plan Approval (IOD)6-12.pdf · uploaded 6 Apr 2018Source
- 21 Building Plan Approval (IOD)7-12.pdf · uploaded 6 Apr 2018Source
- 22 Building Plan Approval (IOD)8-12.pdf · uploaded 6 Apr 2018Source
- 23 Building Plan Approval (IOD)9-12.pdf · uploaded 6 Apr 2018Source
- 24 Building Plan Approval (IOD)10-12.pdf · uploaded 6 Apr 2018Source
- 25 Building Plan Approval (IOD)11-12.pdf · uploaded 6 Apr 2018Source
- 26 Building Plan Approval (IOD)12-12.pdf · uploaded 6 Apr 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentCC NO 1173.pdf · uploaded 6 Apr 2018Source
- 2 Certificates of CA (Form 3)my world building C1 TO C9.pdf · uploaded 6 Jul 2018Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Simar Pride Ventures LLp Architect s Certificate BUILDING C1 TO C2.pdf · uploaded 27 Nov 2018Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Simar Pride Ventures LLp Architect s Certificate Building C1 to C9.pdf · uploaded 27 Nov 2018Source
- 3 Certificates of CA (Form 3)MY WORLD BUILDING C1 TO C9.pdf · uploaded 13 Dec 2018Source
- 4 Certificates of CA (Form 3)MY WORLD BUILDING C1 TO C9.pdf · uploaded 13 Dec 2018Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EngCerti Simar C-1 to C-9 Dt30-06-18.pdf · uploaded 26 Dec 2018Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng Certi Simar C-1 To C-9 SEPT.pdf · uploaded 26 Dec 2018Source
- 1 Certificates of CA (Form 5)C1 TO C9.pdf · uploaded 8 Jan 2019Source
- 5 Certificates of CA (Form 3)My World Building C1 to C9.pdf · uploaded 2 Mar 2019Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)C-1 TO C-9.pdf · uploaded 5 Mar 2019Source
- 1 Form 2AC-1- TO C-9.pdf · uploaded 5 Mar 2019Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)C-1 TO C-9.pdf · uploaded 6 Mar 2019Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG certificate C1-C9 date 05-04-19.pdf · uploaded 30 Jul 2019Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)C-1 TO C-9 BUILDING MAR-19.pdf · uploaded 1 Aug 2019Source
- 6 Certificates of CA (Form 3)my world building c1 to c9 date 31-03-19.pdf · uploaded 2 Aug 2019Source
- 2 Form 2AC1 TO C-9 MARCH 19.pdf · uploaded 13 Aug 2019Source
- 3 Form 2AJune'19 Form 2A C1 To C9 -My World.pdf · uploaded 13 Aug 2019Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Jun'19 Architect C-1 to C-9.pdf · uploaded 9 Sep 2019Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Jun'19 Engineer C-1 to C-9.pdf · uploaded 9 Sep 2019Source
- 7 Certificates of CA (Form 3)My World Build C1 to C9.pdf · uploaded 17 Sep 2019Source
- 1 OtherNew Doc 2019-09-28 174027_1.pdf · uploaded 30 Sep 2019Source
- 4 Form 2ASept'19 Form 2A C1 To C9 -My World.pdf · uploaded 15 Oct 2019Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sep'19 Engineer C-1 to C-9.pdf · uploaded 4 Dec 2019Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Sep'19 Architect C1 to C9.pdf · uploaded 11 Dec 2019Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sep'19 Engineer C-1 to C-9.pdf · uploaded 11 Dec 2019Source
- 8 Certificates of CA (Form 3)My World Build C-1 to C-9.pdf · uploaded 11 Dec 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 C1 to C9 Mar'19.pdf · uploaded 24 Dec 2019Source
- 5 Form 2ADec'19 Form 2A C1-C9 -My World.pdf · uploaded 15 Jan 2020Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Dec'20 Architect C-1 to C-9.pdf · uploaded 11 Mar 2020Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Dec'20 Engineeers Certificate C-1 to C-9.pdf · uploaded 11 Mar 2020Source
- 2 Other200311142723_0001 (1).pdf · uploaded 11 Mar 2020Source
- 9 Certificates of CA (Form 3)C1-C2 DEC19 MyWorld19.pdf · uploaded 14 Mar 2020Source
- 6 Form 2AMar'20 Form 2A C1-C9 -My World.pdf · uploaded 6 Jun 2020Source
- 27 Building Plan Approval (IOD)HPSC0118.pdf · uploaded 20 Jun 2020Source
- 28 Building Plan Approval (IOD)HPSC0119.pdf · uploaded 20 Jun 2020Source
- 29 Building Plan Approval (IOD)HPSC0120.pdf · uploaded 20 Jun 2020Source
- 30 Building Plan Approval (IOD)HPSC0121.pdf · uploaded 20 Jun 2020Source
- 31 Building Plan Approval (IOD)HPSC0122.pdf · uploaded 20 Jun 2020Source
- 32 Building Plan Approval (IOD)HPSC0123.pdf · uploaded 20 Jun 2020Source
- 33 Building Plan Approval (IOD)HPSC0124.pdf · uploaded 20 Jun 2020Source
- 34 Building Plan Approval (IOD)HPSC0125.pdf · uploaded 20 Jun 2020Source
- 35 Building Plan Approval (IOD)HPSC0126.pdf · uploaded 20 Jun 2020Source
- 36 Building Plan Approval (IOD)HPSC0127.pdf · uploaded 20 Jun 2020Source
- 37 Building Plan Approval (IOD)HPSC0128.pdf · uploaded 20 Jun 2020Source
- 38 Building Plan Approval (IOD)HPSC0129.pdf · uploaded 20 Jun 2020Source
- 39 Building Plan Approval (IOD)HPSC0130.pdf · uploaded 20 Jun 2020Source
- 40 Building Plan Approval (IOD)HPSC0131.pdf · uploaded 20 Jun 2020Source
- 41 Building Plan Approval (IOD)HPSC0132.pdf · uploaded 20 Jun 2020Source
- 42 Building Plan Approval (IOD)HPSC0133.pdf · uploaded 20 Jun 2020Source
- 43 Building Plan Approval (IOD)HPSC0134.pdf · uploaded 20 Jun 2020Source
- 3 Commencement Certificates / NA Order for plotted developmentCommencement Certificate 08-2020 (1).pdf · uploaded 20 Jun 2020Source
- 44 Building Plan Approval (IOD)HPSC0135.pdf · uploaded 25 Jun 2020Source
- 45 Building Plan Approval (IOD)HPSC0136.pdf · uploaded 25 Jun 2020Source
- 46 Building Plan Approval (IOD)HPSC0137.pdf · uploaded 25 Jun 2020Source
- 47 Building Plan Approval (IOD)HPSC0138.pdf · uploaded 25 Jun 2020Source
- 48 Building Plan Approval (IOD)HPSC0139.pdf · uploaded 25 Jun 2020Source
- 49 Building Plan Approval (IOD)HPSC0140.pdf · uploaded 25 Jun 2020Source
- 50 Building Plan Approval (IOD)HPSC0141.pdf · uploaded 25 Jun 2020Source
- 51 Building Plan Approval (IOD)HPSC0142.pdf · uploaded 25 Jun 2020Source
- 52 Building Plan Approval (IOD)HPSC0143.pdf · uploaded 25 Jun 2020Source
- 53 Building Plan Approval (IOD)HPSC0144.pdf · uploaded 25 Jun 2020Source
- 54 Building Plan Approval (IOD)HPSC0145.pdf · uploaded 25 Jun 2020Source
- 55 Building Plan Approval (IOD)HPSC0146.pdf · uploaded 25 Jun 2020Source
- 56 Building Plan Approval (IOD)HPSC0147.pdf · uploaded 25 Jun 2020Source
- 57 Building Plan Approval (IOD)HPSC0148.pdf · uploaded 25 Jun 2020Source
- 58 Building Plan Approval (IOD)HPSC0149.pdf · uploaded 25 Jun 2020Source
- 59 Building Plan Approval (IOD)HPSC0150.pdf · uploaded 25 Jun 2020Source
- 60 Building Plan Approval (IOD)HPSC0151.pdf · uploaded 25 Jun 2020Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Mar'20 Architect C1 to 9.pdf · uploaded 18 Sep 2020Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Mar'20 Engineeers Certificate C1 to C9.pdf · uploaded 18 Sep 2020Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)C1 to C9-Architect Certificate -June'20.pdf · uploaded 3 Nov 2020Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)C1 to C9-Engineers Certificate -June'20.pdf · uploaded 3 Nov 2020Source
- 10 Certificates of CA (Form 3)Form 2A -My world C1 to C9-Sept'20.pdf · uploaded 3 Nov 2020Source
- 3 OtherDeclaration by Devloper.pdf · uploaded 21 Dec 2020Source
- 61 Building Plan Approval (IOD)dwg amllgamention.pdf · uploaded 31 Dec 2020Source
- 7 Form 2AForm 2A -My world C1 to C9-Dec'20.pdf · uploaded 1 Feb 2021Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)C1 to C9-Architect Certificate -Sep'20.pdf · uploaded 11 Feb 2021Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)C1 to C9-Engineers Certificate -Sep'20.pdf · uploaded 11 Feb 2021Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate-C1 to C5 Building-Dec'20.pdf · uploaded 14 Apr 2021Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate-C1 to C5-Dec'20.pdf · uploaded 14 Apr 2021Source
- 8 Form 2AForm 2A-Mar'21 -My world C1 to C9.pdf · uploaded 29 Apr 2021Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)12 ARCHITECT CERTIFICATE C1 TO C5 PLOT 3 - Copy.pdf · uploaded 15 Aug 2021Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)13 ARCHITECT CERTIFICATE C1 TO C5 PLOT 3.pdf · uploaded 15 Aug 2021Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)PLOT 3 C1 TO C5-Mar'21.pdf · uploaded 15 Aug 2021Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)PLOT 3 C1 TO C5 -Jun'21.pdf · uploaded 15 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A-Mar'21 -My world C1 to C9.pdf · uploaded 15 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 My World C1 to C9 Building.pdf · uploaded 15 Aug 2021Source
- 9 Form 2AFORM 2A-C1 to C9-Sep'21-My world.pdf · uploaded 21 Oct 2021Source
- 10 Form 2AForm - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9.pdf · uploaded 2 Feb 2022Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHI C BUILDING.pdf · uploaded 5 Mar 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9.pdf · uploaded 5 May 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)my_world_C1_TO_C9.pdf · uploaded 11 Jul 2022Source
- 1 Disclosure of sold/ booked inventoryDisclosure of SoldUnsold Inventory-My World C1 to C9-Jun'21.pdf · uploaded 14 Jul 2022Source
- 2 Disclosure of sold/ booked inventorycorrigandum My World C1 to C9 Type Building 12-01-2022.pdf · uploaded 14 Jul 2022Source
- 3 Disclosure of sold/ booked inventorycorrigandum My World C1 to C9 Type Building 31-01-2022.pdf · uploaded 14 Jul 2022Source
- 4 Disclosure of sold/ booked inventorycorrigandum My World C1 to C9 Type Building 31-03-2022.pdf · uploaded 14 Jul 2022Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMNT CERTIFICATE C1-C5.pdf · uploaded 19 Jul 2022Source
- 11 Form 2AForm - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9.pdf · uploaded 8 Aug 2022Source
- 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Dec'21 Plot 03 Architect Certificate.pdf · uploaded 9 Aug 2022Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE PLOT 4 C1 TO C5-Sep'21.pdf · uploaded 9 Aug 2022Source
- 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Dec'21 Plot 03 Er Certificate.pdf · uploaded 9 Aug 2022Source
- 5 Disclosure of sold/ booked inventoryDisclosure of SoldUnsold Inventory-My World C1 to C9-Jun'21.pdf · uploaded 11 Nov 2022Source
- 12 Form 2AForm - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9.pdf · uploaded 12 Nov 2022Source
- 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE C1 TO C5 PLOT 3-MAR'22.pdf · uploaded 21 Jan 2023Source
- 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE C1 TO C5 PLOT 3-JUN'22.pdf · uploaded 21 Jan 2023Source
- 11 Certificates of CA (Form 3)C1-C9 PLOT NO 3 MAR20- FORM 3 - CA Cert MY WORLD BUILDING C-1 to C-9.pdf · uploaded 23 Jan 2023Source
- 12 Certificates of CA (Form 3)C1-C9 PLOT NO 3 JUN20- FORM 3 - CA Cert MY WORLD BUILDING C-1 to C-9.pdf · uploaded 23 Jan 2023Source
- 13 Certificates of CA (Form 3)C1-C9 PLOT NO 3 SEP20- FORM 3 - CA Cert MY WORLD BUILDING C-1 to C-9.pdf · uploaded 23 Jan 2023Source
- 14 Certificates of CA (Form 3)C1-C9 PLOT NO 3 DEC20- FORM 3 - CA Cert MY WORLD BUILDING C-1 to C-9.pdf · uploaded 23 Jan 2023Source
- 15 Certificates of CA (Form 3)C1-C9 PLOT NO 3 MAR21- FORM 3 - CA Cert MY WORLD BUILDING C-1 to C-9.pdf · uploaded 23 Jan 2023Source
- 16 Certificates of CA (Form 3)C1-C9 PLOT NO 3 JUN21- FORM 3 - CA Cert MY WORLD BUILDING C-1 to C-9.pdf · uploaded 23 Jan 2023Source
- 17 Certificates of CA (Form 3)C1-C9 PLOT NO 3 SEP21- FORM 3 - CA Cert MY WORLD BUILDING C-1 to C-9.pdf · uploaded 23 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 My World C1 to C9 Building.pdf · uploaded 24 Feb 2023Source
- 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate Plot no3 C1 to C5 MAr'22.pdf · uploaded 8 Oct 2023Source
- 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate Plot no3 C1 to C5 Jun'22.pdf · uploaded 8 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9.pdf · uploaded 8 Oct 2023Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)1 Status of Formation of Legal Entity.pdf · uploaded 8 Oct 2023Source
- 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect-C1 to C5 -Sep'22.pdf · uploaded 22 Oct 2023Source
- 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect-C1 to C5-Dec'22.pdf · uploaded 22 Oct 2023Source
- 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect- C1 to C5 -Mar'23.pdf · uploaded 22 Oct 2023Source
- 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect-C1 to C5 -Jun'23.pdf · uploaded 22 Oct 2023Source
- 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer-C1 to C5-Sep'22.pdf · uploaded 22 Oct 2023Source
- 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer-C1 to C5-Dec'22.pdf · uploaded 22 Oct 2023Source
- 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer-C1 to C5-Mar'23.pdf · uploaded 22 Oct 2023Source
- 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer-C1 to C5-Jun'23.pdf · uploaded 22 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9-Dec'22.pdf · uploaded 26 Oct 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9-Mar'23.pdf · uploaded 26 Oct 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9-Jun'23.pdf · uploaded 26 Oct 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9-Sep'23.pdf · uploaded 26 Oct 2023Source
- 6 Disclosure of sold/ booked inventorycorrigandum My World C1 to C9 Type Building-Jun'22.pdf · uploaded 26 Oct 2023Source
- 7 Disclosure of sold/ booked inventorycorrigandum My World C1 to C9 Type Building-Sep'22.pdf · uploaded 26 Oct 2023Source
- 8 Disclosure of sold/ booked inventorycorrigandum My World C1 to C9 Type Building-Dec'22.pdf · uploaded 26 Oct 2023Source
- 9 Disclosure of sold/ booked inventory231122175915_0001.pdf · uploaded 22 Nov 2023Source
- 10 Disclosure of sold/ booked inventorycorrigandum My World C1 to C9 Type Building-Jun'23.pdf · uploaded 22 Nov 2023Source
- 11 Disclosure of sold/ booked inventorycorrigandum My World C1 to C9 Type Building-Sep'23.pdf · uploaded 22 Nov 2023Source
- 18 Certificates of CA (Form 3)CA Certificate of My World C-1 to C-9 Dt31-12-21_0001.pdf · uploaded 22 Nov 2023Source
- 19 Certificates of CA (Form 3)Form no 3 My World C1 to C9 Dt31 Mar 22_0001.pdf · uploaded 22 Nov 2023Source
- 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE PLOT 3 C1 TO C5-Sep'23.pdf · uploaded 28 Nov 2023Source
- 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE PLOT 3 C1 TO C5-Sep'23.pdf · uploaded 28 Nov 2023Source
- 20 Certificates of CA (Form 3)Form 3-My World Plot No3 C Building-Jun'22.pdf · uploaded 16 Dec 2023Source
- 21 Certificates of CA (Form 3)Form 3-My World Plot No3 C Building-Sep'22.pdf · uploaded 16 Dec 2023Source
- 22 Certificates of CA (Form 3)Form 3-My World Plot No3 C Building-Dec'22.pdf · uploaded 16 Dec 2023Source
- 23 Certificates of CA (Form 3)Form 3-My World Plot N3 C Building-Mar'23.pdf · uploaded 16 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)15899.pdf · uploaded 16 Dec 2023Source
- 13 Form 2AForm - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9.pdf · uploaded 16 Jan 2024Source
- 12 Disclosure of sold/ booked inventorycorrigandum My World C1 to C9 Type Building.pdf · uploaded 30 Jan 2024Source
- 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE PLOT 3 C1 TO C5-Dec'23 (1).pdf · uploaded 22 Feb 2024Source
- 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE PLOT 3 C1 TO C5-Dec'23 (1).pdf · uploaded 24 Feb 2024Source
- 25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE PLOT 3 C1 TO C5-Dec'23.pdf · uploaded 26 Feb 2024Source
- 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Plot No 3 C1 TO C5-Mar'24.pdf · uploaded 27 Apr 2024Source
- 26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Architect Certificate Plot No 3 C1 TO C5-Mar'24.pdf · uploaded 27 Apr 2024Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9-Mar'24.pdf · uploaded 27 Apr 2024Source
- 27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate-One World Mar'24.pdf · uploaded 1 Jun 2024Source
- 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Plot No 3 C1 TO C5-Jun'24.pdf · uploaded 17 Jul 2024Source
- 28 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate Plot No 3 C1 TO C5-Jun'24.pdf · uploaded 17 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9-Jun'24.pdf · uploaded 17 Jul 2024Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Plot No 3 C1 TO C5-Sep'24.pdf · uploaded 19 Oct 2024Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate Plot No 3 C1 TO C5-Sep'24.pdf · uploaded 19 Oct 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9-Sep'24.pdf · uploaded 19 Oct 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Plot No3 C1 TO C5-Dec'24.pdf · uploaded 18 Jan 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate Plot No3 C1 TO C5-Dec'24.pdf · uploaded 18 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9-Dec'24.pdf · uploaded 18 Jan 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Plot No 3 C1 TO C5-Mar'25.pdf · uploaded 3 May 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate Plot No 3 C1 TO C5-Mar'25.pdf · uploaded 3 May 2025Source
- 1 Disclosure of sold/ booked inventorycorrigandum My World C1 to C9 Type Building-Jun'24.pdf · uploaded 3 May 2025Source
- 2 Disclosure of sold/ booked inventorycorrigandum My World C1 to C9 Type Building-Sep'24.pdf · uploaded 3 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9-Marc'25.pdf · uploaded 3 May 2025Source
- Form 11.pdf · uploaded 24 Nov 2025Source
- Form 11.pdf · uploaded 24 Nov 2025Source
- Form 1ARCHITECT CERTIFICATE PLOT 3 C1 TO C5-Dec'23.pdf · uploaded 24 Nov 2025Source
- Form 11.pdf · uploaded 24 Nov 2025Source
- Form 11.pdf · uploaded 24 Nov 2025Source
- Form 11.pdf · uploaded 24 Nov 2025Source
- Form 11.pdf · uploaded 24 Nov 2025Source
- Form 11.pdf · uploaded 24 Nov 2025Source
- Form 1Form 1-Architect Certificate My World Jun'25.pdf · uploaded 24 Nov 2025Source
- Form 1Form 1-Architect Certificate My World Sep'25.pdf · uploaded 24 Nov 2025Source
- Form 22.pdf · uploaded 24 Nov 2025Source
- Form 22.pdf · uploaded 24 Nov 2025Source
- Form 22.pdf · uploaded 24 Nov 2025Source
- Form 2Engineers Certificate Plot no 3 C1 TO C5-Mar'24.pdf · uploaded 24 Nov 2025Source
- Form 22.pdf · uploaded 24 Nov 2025Source
- Form 22.pdf · uploaded 24 Nov 2025Source
- Form 22.pdf · uploaded 24 Nov 2025Source
- Form 22.pdf · uploaded 24 Nov 2025Source
- Form 2Form 2-Engineers Certificate My World Jun'25.pdf · uploaded 24 Nov 2025Source
- Form 2Form 2-ENGINEER'S Certificate My World Sep'25.pdf · uploaded 24 Nov 2025Source
- Form 3CA Certificate Simar Pride Dt-30-06-2023_0001.pdf · uploaded 24 Nov 2025Source
- Form 3CA Certificate Simar Pride Dt-30-09-2023_0001.pdf · uploaded 24 Nov 2025Source
- Form 3CA Certificate Simar Pride Dt-31-12-2023_0001.pdf · uploaded 24 Nov 2025Source
- Form 3CA Certificate Simar Pride Dt-31-03-2024_0001.pdf · uploaded 24 Nov 2025Source
- Form 3CA Certificate Simar Pride Dt-30-06-2024_0001.pdf · uploaded 24 Nov 2025Source
- Form 3CA Certificate Simar Pride Dt-30-09-2024_0_0001.pdf · uploaded 24 Nov 2025Source
- Form 3CA Certificate Simar Pride Dt-31-12-2024_0001.pdf · uploaded 24 Nov 2025Source
- Form 3CA Certificate Simar Pride Dt-31-03-2025_0001.pdf · uploaded 24 Nov 2025Source
- Form 3CA Certificate Simar Pride Dt-30-06-2025_0001.pdf · uploaded 24 Nov 2025Source
- Form 3CA Certificate Simar Pride Dt-30-09-2025_0001.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventoryDiscl.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventoryDiscl.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventoryDiscl.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked Inventorycorrigandum My World C1 to C9 Type Building-Mar'24.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventoryDiscl.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventoryDiscl.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked Inventorycorrigandum My World C1 to C9 Type Building-Dec'24.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked Inventorycorrigandum My World C1 to C9 Type Building-Mar'25.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked Inventorycorrigandum My World C1 to C9 Type Building-Jun'25.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked Inventorycorrigandum My World C1 to C9 Type Building-Sep'25.pdf · uploaded 24 Nov 2025Source
- Others2A.pdf · uploaded 24 Nov 2025Source
- Others2A.pdf · uploaded 24 Nov 2025Source
- Others2A.pdf · uploaded 24 Nov 2025Source
- Others2A.pdf · uploaded 24 Nov 2025Source
- Others2A.pdf · uploaded 24 Nov 2025Source
- Others2A.pdf · uploaded 24 Nov 2025Source
- Others2A.pdf · uploaded 24 Nov 2025Source
- OthersCA Certificate Simar Pride Dt-31-03-2025_0001.pdf · uploaded 24 Nov 2025Source
- OthersForm - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9-Jun'25.pdf · uploaded 24 Nov 2025Source
- OthersForm - 2A - Engineer's Certificate (Quality Assurance)-C1 toC9-Sep'25.pdf · uploaded 24 Nov 2025Source
- Form 5 (FY 2023-2024)23-24.pdf · uploaded 10 Dec 2025Source
- Form 5 (FY 2024-2025)24-25.pdf · uploaded 10 Dec 2025Source
Technical
- DocumentLAYOUT ORDER 1MB.pdf · uploaded 23 Mar 2018Source
- Document1-14.pdf · uploaded 23 Mar 2018Source
- Document2-14.pdf · uploaded 23 Mar 2018Source
- Document3-14.pdf · uploaded 23 Mar 2018Source
- Document4-14.pdf · uploaded 23 Mar 2018Source
- Document5-14.pdf · uploaded 23 Mar 2018Source
- Document6-14.pdf · uploaded 23 Mar 2018Source
- Document7-14.pdf · uploaded 23 Mar 2018Source
- Document8-14.pdf · uploaded 23 Mar 2018Source
- Document9-14.pdf · uploaded 23 Mar 2018Source
- Document10-14.pdf · uploaded 23 Mar 2018Source
- Document11-14.pdf · uploaded 23 Mar 2018Source
- Document12-14.pdf · uploaded 23 Mar 2018Source
- Document13-14.pdf · uploaded 23 Mar 2018Source
- Document14-14.pdf · uploaded 23 Mar 2018Source
- Document1-12.pdf · uploaded 6 Apr 2018Source
- Document2-12.pdf · uploaded 6 Apr 2018Source
- Document3-12.pdf · uploaded 6 Apr 2018Source
- Document4-12.pdf · uploaded 6 Apr 2018Source
- Document5-12.pdf · uploaded 6 Apr 2018Source
- Document6-12.pdf · uploaded 6 Apr 2018Source
- Document7-12.pdf · uploaded 6 Apr 2018Source
- Document8-12.pdf · uploaded 6 Apr 2018Source
- Document9-12.pdf · uploaded 6 Apr 2018Source
- Document10-12.pdf · uploaded 6 Apr 2018Source
- Document11-12.pdf · uploaded 6 Apr 2018Source
- Document12-12.pdf · uploaded 6 Apr 2018Source
- DocumentHPSC0118.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0119.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0120.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0121.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0122.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0123.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0124.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0125.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0126.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0127.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0128.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0129.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0130.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0131.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0132.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0133.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0134.pdf · uploaded 20 Jun 2020Source
- DocumentHPSC0135.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0136.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0137.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0138.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0139.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0140.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0141.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0142.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0143.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0144.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0145.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0146.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0147.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0148.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0149.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0150.pdf · uploaded 25 Jun 2020Source
- DocumentHPSC0151.pdf · uploaded 25 Jun 2020Source
- Documentdwg amllgamention.pdf · uploaded 31 Dec 2020Source
- DocumentHPSCANNER0024.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0025.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0026.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0027.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0028.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0029.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0030.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0031.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0032.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0033.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0034.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0035.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0036.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0037.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0038.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0039.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0040.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0041.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0042.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0043.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0044.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0045.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0046.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0047.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0048.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0049.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0050.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0051.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0052.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0053.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0054.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0055.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0056.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0057.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0058.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0059.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0060.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0061.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0062.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0063.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0064.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0065.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0066.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0067.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0068.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0069.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0070.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0071.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0072.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0073.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0074.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0075.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0076.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0077.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0077.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0078.pdf · uploaded 29 Nov 2025Source
- DocumentHPSCANNER0079.pdf · uploaded 29 Nov 2025Source
Technical (Architect)
- DocumentArchitect Certificate Plot No 3 C1 TO C5-Jun'24.pdf · uploaded 17 Jul 2024Source
- DocumentArchitect Certificate Plot No 3 C1 TO C5-Sep'24.pdf · uploaded 19 Oct 2024Source
- DocumentArchitect Certificate Plot No3 C1 TO C5-Dec'24.pdf · uploaded 18 Jan 2025Source
- DocumentArchitect Certificate Plot No 3 C1 TO C5-Mar'25.pdf · uploaded 3 May 2025Source
Technical (Engineer)
- DocumentEngineers Certificate Plot No 3 C1 TO C5-Jun'24.pdf · uploaded 17 Jul 2024Source
- DocumentEngineers Certificate Plot No 3 C1 TO C5-Sep'24.pdf · uploaded 19 Oct 2024Source
- DocumentEngineers Certificate Plot No3 C1 TO C5-Dec'24.pdf · uploaded 18 Jan 2025Source
- DocumentEngineers Certificate Plot No 3 C1 TO C5-Mar'25.pdf · uploaded 3 May 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 5BHK & more, 5BHK & more, 5BHK & more, 5BHK & more, 3BHK, 4BHK, Business Center, Coffee Shop, Parlour, Showroom98 units in all
- Address
- Plot No 3 Gut No 708 Chikalthana Aurangabad, Jalna Road, ChikalthanaPIN 431210
- Village
- Aurangabad (M Corp.), Aurangabad taluka
- Location
- 19.87181, 75.39638
- Land area for this project
- 9,377 sq m (1,00,929 sq ft)
- Permissible built-up area
- 32,055 sq m (3,45,032 sq ft)
- Sanctioned built-up area
- 32,055 sq m (3,45,032 sq ft)
- Recreational open space
- 1,546 sq m (16,639 sq ft)
- Designated bank account
- 171
- Developed in phases
- Yes
Land as published on MahaRERA's project page
PLOT NO 3 GUT NO 708 CHIKALTHANA AURANGABAD
Boundaries
- North
- 12 Mtr Road
- South
- 12 Mtr Road
- East
- Part Of Gut No 708
- West
- Open Space
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking98 units
45 of 98 units booked (46%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building C1 | 5BHK & more | 219.16 sq m · 2,359 sq ft | 1 | 1 |
| Building C1 | 5BHK & more | 226.35 sq m · 2,436 sq ft | 8 | 3 |
| Building C1 | 5BHK & more | 227.27 sq m · 2,446 sq ft | 9 | 8 |
| Building C2 | 5BHK & more | 218.63 sq m · 2,353 sq ft | 1 | 0 |
| Building C2 | 5BHK & more | 226.25 sq m · 2,435 sq ft | 1 | 0 |
| Building C2 | 5BHK & more | 225.73 sq m · 2,430 sq ft | 3 | 1 |
| Building C2 | 5BHK & more | 225.42 sq m · 2,426 sq ft | 4 | 2 |
| Building C2 | 5BHK & more | 227.27 sq m · 2,446 sq ft | 9 | 7 |
Show all 26 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building C3 | 3BHK | 121.58 sq m · 1,309 sq ft | 9 | 6 |
| Building C3 | 3BHK | 125.42 sq m · 1,350 sq ft | 9 | 3 |
| Building C4 | 4BHK | 160.27 sq m · 1,725 sq ft | 1 | 0 |
| Building C4 | 4BHK | 162.96 sq m · 1,754 sq ft | 1 | 0 |
| Building C4 | 4BHK | 168.92 sq m · 1,818 sq ft | 8 | 5 |
| Building C4 | 4BHK | 171.61 sq m · 1,847 sq ft | 8 | 7 |
| Building C5 | 5BHK & more | 227.31 sq m · 2,447 sq ft | 1 | 0 |
| Building C5 | 5BHK & more | 239.68 sq m · 2,580 sq ft | 1 | 0 |
| Building C5 | 5BHK & more | 247.01 sq m · 2,659 sq ft | 8 | 1 |
| Building C5 | 5BHK & more | 234.64 sq m · 2,526 sq ft | 8 | 1 |
| Building C8 | 5BHK & more | — | 0 | 0 |
| Building C9 | 5BHK & more | — | 0 | 0 |
| Club House | Business Center | 33.12 sq m · 357 sq ft | 1 | 0 |
| Club House | Coffee Shop | 53.37 sq m · 574 sq ft | 1 | 0 |
| Club House | Parlour | 109.62 sq m · 1,180 sq ft | 1 | 0 |
| Commercial Building | Showroom | 28.27 sq m · 304 sq ft | 1 | 0 |
| Commercial Building | Showroom | 37.99 sq m · 409 sq ft | 1 | 0 |
| Commercial Building | Showroom | 38.43 sq m · 414 sq ft | 3 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Akw Associates | — |
| Chartered accountant | CA Sachin Lathi | — |
| Chartered accountant | Narendra Navandar and co | — |
| Engineer | Milind Wadekar | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Chikalthana
- Ananda NilayamRERA PR1040002601767
- Kasliwal NiwaraRERA PR1040002601653
- Shubhlabh HeritageRERA PM1040002600017
- Shri MahalaxmiRERA P51500079267
- Sai ResidencyRERA P51500076975
- Pearl CityRERA P51500066468
- Nabhraj KalpataruRERA P51500054470
- Shivsamarth ResidencyRERA P51500052807
All 25 projects in Chikalthana · Compare My World Plot No 3 with another project