Ganesh Nagar Part 2

Completed

Deoli (M Cl), Wardha 442101 |Promoter: Manish Sharadkumar Tiwari

3 Dec 2021Registered with MahaRERA
31 Dec 2023Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Completed
Buildings
1
Land area for this project
13,167 sq m (1,41,724 sq ft)
Permissible built-up area
13,167 sq m (1,41,724 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
2,339 sq m (25,172 sq ft)
Address
194/2, Survey No 194/2 Mauja Deoli Tahsil Deoli Wardha, DeoliPIN 442101
Designated bank account
Bank Of Baroda
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Ganesh Nagar Part 2 is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2023

The latest completion date on record passed 2 years and 10 months ago.

Registered
3 Dec 2021
Promised
31 Dec 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P504000320523 Dec 202131 Dec 2023—Manish Sharadkumar TiwariProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P50400032052)——

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsCOMPLETE100%
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsCONCRETE OPEN DRAIN AND HUME PIPES100%
  • Landscaping & Tree PlantingCOMPLETE100%
  • Street LightingPRECAST POLES AND OVERHEAD CABLES AND LIGHTS100%
Show all 18 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETE100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationCOMPLETE100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • COMPOUND WALL TO AMENITY OPEN SPACECOMPLETE100%
  • CORNER POOLCOMPLETE100%
  • PLOT STONESPRECAST COPNCRETE SMALL PLOTS STONES100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 21 filings listed on MahaRERA's project page

Title report (2)

Encumbrance details

Commencement certificate (2)

Form B

Other (3)

Show all 37 documentsShow fewer documents

Other (3)

Allotment letter (2)

Registration certificate

Occupancy / completion certificate

  • Occupancy / completion certificate16 Jun 2022ViewSource

Form 4

Form 5

Layout plan

Document library

  • Copy of the legal title reportFORMAT A_SEARCH 1.pdf · uploaded 25 Nov 2021View
  • Copy of the legal title reportFORMAT A_SEARCH 2.pdf · uploaded 25 Nov 2021View
  • Details of encumbrancesDECLARATION_ENCUMBRANCE.pdf · uploaded 25 Nov 2021View
  • Copy of Layout Approval (in case of layout)SANCTION MAP.pdf · uploaded 25 Nov 2021View
  • Building Plan Approval / NA Order for plotted developmentNA ORDER.pdf · uploaded 25 Nov 2021View
  • Commencement Certificates / NA Order for plotted developmentNA ORDER.pdf · uploaded 25 Nov 2021View
  • Declaration about Commencement CertificateFORMAT D_COMMENCMENT.pdf · uploaded 25 Nov 2021View
  • Declaration in FORM BFORM B.pdf · uploaded 25 Nov 2021View
  • Proforma of Allotment letterAgreement to Sale_Format.pdf · uploaded 25 Nov 2021View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 25 Nov 2021View
  • Disclosure of sold/ booked inventoryBOOK SOLD.pdf · uploaded 25 Nov 2021View
  • CERSAI detailsCERSAI_DECLARATION.pdf · uploaded 25 Nov 2021View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 16 Jun 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION CERTIFICATE.pdf · uploaded 16 Jun 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5_21-22.pdf · uploaded 21 Feb 2023View

Promoter documents

  • Legal Title reportFORMAT A_SEARCH 1.pdf · uploaded 25 Nov 2021View
  • Legal Title reportFORMAT A_SEARCH 2.pdf · uploaded 25 Nov 2021View
  • Declaration Form BFORM B.pdf · uploaded 25 Nov 2021View

Technical documents

  • Layout ApprovalSANCTION MAP.pdfView
  • NA Order for Plotted DevelopmentNA ORDER.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Deoli (M Cl), Deoli taluka

Survey, CTS, gat or plot numbers

194/2

As published on MahaRERA's project page

194/2

Boundaries

North
Agri Land Manish Tiwari
South
Agri Land Golhar
East
Agri Land Charde
West
Agri Land Pooja Shukla

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRohit Rathi—
Chartered accountantDarshan Wakhariya—
EngineerSanjay Kakde—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology