Completed6 floorsRERA P50400013538
Main building, Tulip Tower
Deedo IDDP-WAR-95MP-TULIPMahaRERA has not published a flat-by-flat record for this tower, and no registered deed names it yet.
Median saleNot on recordneeds 3 or more sales
Completion28 Feb 202131 Aug 2019 · revised
Units & parking in Main building
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Residential | 411.1 m² (4,425 sq.ft) | 10 | Not on record |
Parking: Closed/Covered 33 · Open Space 0 (as declared to MahaRERA)
Construction progress (declared)
Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.
- Excavation100%
- Basement (if any)100%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor0%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
- Sanitary Fittings within the flats / premises100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
As registered with MahaRERA
- RERA registration
- P50400013538 · registered 9 Oct 2017
- Promised completion
- 31 Aug 2019
- Revised completion
- 28 Feb 2021
- Sanctioned habitable floors
- 6
- Also named
- Tulip Tower
- Deedo ID
- DP-WAR-95MP-TULIP
Questions about Main building
When is Main building due for completion?
The MahaRERA registration promises 31 Aug 2019, revised to 28 Feb 2021.
How many floors does Main building have?
6 sanctioned habitable floors, as registered with MahaRERA.
Data through9 Oct 2026SourcesMahaRERA registration and project page · IGR Maharashtra Index IIFloors and units are as registered; a promoter can revise them in later filings. Party names appear only inside an unlocked Index II.Report a problemMethodology