Completed6 floorsRERA P50400013538

Main building, Tulip Tower

Deedo IDDP-WAR-95MP-TULIP

MahaRERA has not published a flat-by-flat record for this tower, and no registered deed names it yet.

All of Tulip Tower
Median saleNot on recordneeds 3 or more sales
Completion28 Feb 202131 Aug 2019 · revised
Units & parking in Main building
TypeCarpet areaUnitsBooked
Residential411.1 m² (4,425 sq.ft)10Not on record

Parking: Closed/Covered 33 · Open Space 0 (as declared to MahaRERA)

Construction progress (declared)

Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
As registered with MahaRERA
RERA registration
P50400013538 · registered 9 Oct 2017
Promised completion
31 Aug 2019
Revised completion
28 Feb 2021
Sanctioned habitable floors
6
Also named
Tulip Tower
Deedo ID
DP-WAR-95MP-TULIP
Questions about Main building

When is Main building due for completion?

The MahaRERA registration promises 31 Aug 2019, revised to 28 Feb 2021.

How many floors does Main building have?

6 sanctioned habitable floors, as registered with MahaRERA.

Data through9 Oct 2026SourcesMahaRERA registration and project page · IGR Maharashtra Index IIFloors and units are as registered; a promoter can revise them in later filings. Party names appear only inside an unlocked Index II.Report a problemMethodology