Deedo IDDP-THN-H2GACompletion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 58% of its units are booked.
Tisgaon, Thane 421306 · by Chaitanya Developers
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2029
- This projectRegistered 5 Oct 2021, completion promised 31 Dec 2028, revised to 30 Apr 2029.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Building No 2 Wing B19 floors · 141 units64% booked
- Building No 3 Wing C2 floors · 14 units0% booked
- Building No 4 Wing D5 floors · 1 unit0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700031076
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700031076 | 5 Oct 2021 | 31 Dec 2028 | 30 Apr 2029 | Chaitanya Developers | Project page |
Documents144
1 document held by Deedo, 143 filings listed on MahaRERA's project page
Legal
Migrated
- 1 Details of encumbrancesNO ENCUMBRANCE CER .pdf · uploaded 24 Sep 2021Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 24 Sep 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentPLAN.pdf · uploaded 24 Sep 2021Source
- 1 Declaration about Commencement Certificatedec of cc Chaitanya.pdf · uploaded 24 Sep 2021Source
- 1 Declaration in FORM BFORM B CHAITANYA DEV.pdf · uploaded 24 Sep 2021Source
Show all 144 documentsShow fewer documents
Migrated
- 1 Proforma of Allotment letterFLAT SALE -RERA- DRAFT.pdf · uploaded 24 Sep 2021Source
- 2 Proforma of Allotment letterLETTER OF ALLOTMENT.pdf · uploaded 24 Sep 2021Source
- 1 Copy of the legal title reportTITLE.pdf · uploaded 28 Sep 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 28 Sep 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate.pdf · uploaded 28 Sep 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CHAITANYA FORM NO 3 (1).pdf · uploaded 28 Sep 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)KRISHNA VANSH.pdf · uploaded 30 Sep 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentKDMC D-1.pdf · uploaded 13 Sep 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Chaitanya dev Engg certificate.pdf · uploaded 13 Sep 2022Source
- 2 Copy of Layout Approval (in case of layout)Binder1-2 (2) (2).pdf · uploaded 2 Dec 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentBinder1-2 (1) (2).pdf · uploaded 2 Dec 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)30-3-21-1.pdf · uploaded 2 Dec 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)30-3-22.pdf · uploaded 2 Dec 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)DRSAN ARCHITECT.pdf · uploaded 8 Dec 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 6 Apr 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kaagaz_20221207_123822821247.pdf · uploaded 6 Apr 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Enginner certificate 30922.pdf · uploaded 6 Apr 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ref_77_59_746_ R-2_2022_CHAITANYA DEVLOPERS BAKELAL_(10-12-2022).pdf · uploaded 6 Apr 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Chaitanya DEC21.pdf · uploaded 6 Apr 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Chaitanya MAR22.pdf · uploaded 6 Apr 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Chaitanya JUNE22.pdf · uploaded 6 Apr 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30th Sep 2022 .pdf · uploaded 6 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5_CHAITANYA DEVELOPERS _KRISHNA VANSH.pdf · uploaded 17 Apr 2023Source
- 2 Details of encumbrancesEncumbrance letter.pdf · uploaded 22 May 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CHAITANYA DEVELOPERS FORM3.pdf · uploaded 29 May 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Chaitanya mar23.pdf · uploaded 7 Jun 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1.pdf · uploaded 4 Aug 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ref_77_59_746_ R-4_2023_CHAITANYA DEVLOPERS BAKELAL_(11-07-2023).pdf · uploaded 4 Aug 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CHAITANYA DEVELOPERS ANNEXURE D.pdf · uploaded 4 Aug 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar Form 1-Chaitanya Developers 21st Nov 23.pdf · uploaded 29 Nov 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM -02 CHAITANYA DEVLOPERS BAKELAL_(09-10-2023).pdf · uploaded 29 Nov 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3 CHAITANYA DEVELOPERS AS ON 30-09-2023.pdf · uploaded 29 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CHAITANYA DEVLOPERS ANNUAL REPORT.pdf · uploaded 2 Mar 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 11 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 11 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 11 Feb 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 11 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 11 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 11 Feb 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 11 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 11 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 11 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 11 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 11 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- 31st Dec 2023.pdf · uploaded 11 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- 31st March 2024.pdf · uploaded 11 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- 30th June 2024.pdf · uploaded 11 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 11 Feb 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 11 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A- 31st March 2023.pdf · uploaded 11 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- 31st March 2024.pdf · uploaded 11 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 15 Feb 2025Source
- Form 1Form 1 oct to dec.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 April to June.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 April to June.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 April to June.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory April to June.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 July to Sep.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 July ot Sep.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 July to Sep.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory July to Sep.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 Oct to dec.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 Oct to dec.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 Oct to dec.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 April to june.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 April to June.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 April to June.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory April to June.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 July to sep.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 July to sep.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 July to Sep.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory July to Sep.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 April to June.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 April to June.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 April to June.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory April to June.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 July to Sep.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 July to Sep.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 July to Sep.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory July to Sep.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory 31 Dec 2024.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Jan to Mar.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 April to June.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 April to June.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 April to June.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory April to June.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 July to Sep.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 July to Sep.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 July to Sep.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory July to Sep.pdf · uploaded 9 Jun 2026Source
- Form 1Form 1 Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Form 2Form 2 Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Form 3Form 3 Oct to Dec.pdf · uploaded 9 Jun 2026Source
- Disclosure of Sold and Booked InventorySold Inventory Oct to Dec.pdf · uploaded 9 Jun 2026Source
Technical
Technical (Architect)
- DocumentAr Form 1-Chaitanya Developers 21st Nov 23.pdf · uploaded 29 Nov 2023Source
- DocumentForm 1.pdf · uploaded 11 Feb 2025Source
- DocumentForm 1.pdf · uploaded 11 Feb 2025Source
- DocumentForm 1.pdf · uploaded 11 Feb 2025Source
- DocumentForm 1.pdf · uploaded 11 Feb 2025Source
- DocumentForm 1.pdf · uploaded 11 Feb 2025Source
Technical (Engineer)
- DocumentFORM -02 CHAITANYA DEVLOPERS BAKELAL_(09-10-2023).pdf · uploaded 29 Nov 2023Source
- DocumentForm 2- 31st Dec 2023.pdf · uploaded 11 Feb 2025Source
- DocumentForm 2- 31st March 2024.pdf · uploaded 11 Feb 2025Source
- DocumentForm 2- 30th June 2024.pdf · uploaded 11 Feb 2025Source
- DocumentForm 2.pdf · uploaded 11 Feb 2025Source
- DocumentForm 2.pdf · uploaded 11 Feb 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel SURVEY NO 44 HISSA NO 1
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Office space, Shop, Other156 units in all
- Address
- Survey No 44 Hissa No 1, Tisgaon, Kalyan EPIN 421306
- Village
- Tisgaon, Kalyan taluka
- Location
- 19.21769, 73.13436
- Land area for this project
- 4,430 sq m (47,684 sq ft)
- Permissible built-up area
- 10,850 sq m (1,16,788 sq ft)
- Sanctioned built-up area
- 10,850 sq m (1,16,788 sq ft)
- Designated bank account
- 108
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NO 44 HISSA NO 1
Boundaries
- North
- 18 M Road
- South
- 30 M Dp Road
- East
- S No 39 H No 3
- West
- S No 44 H No 11
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking156 units
90 of 156 units booked (58%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building No 2 Wing B | 1BHK | 27.91 sq m · 300 sq ft | 36 | 17 |
| Building No 2 Wing B | 1BHK | 28.54 sq m · 307 sq ft | 18 | 13 |
| Building No 2 Wing B | 1BHK | 28.82 sq m · 310 sq ft | 36 | 29 |
| Building No 2 Wing B | 1BHK | 29.36 sq m · 316 sq ft | 15 | 11 |
| Building No 2 Wing B | 2BHK | 43.24 sq m · 465 sq ft | 36 | 20 |
| Building No 3 Wing C | 1BHK | 28.29 sq m · 305 sq ft | 1 | 0 |
| Building No 3 Wing C | 1BHK | 29.25 sq m · 315 sq ft | 1 | 0 |
| Building No 3 Wing C | 1BHK | 29.96 sq m · 322 sq ft | 1 | 0 |
Show all 20 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building No 3 Wing C | 1BHK | 30.56 sq m · 329 sq ft | 1 | 0 |
| Building No 3 Wing C | Office space | 30.9 sq m · 333 sq ft | 1 | 0 |
| Building No 3 Wing C | Office space | 34.6 sq m · 372 sq ft | 1 | 0 |
| Building No 3 Wing C | Office space | 34.64 sq m · 373 sq ft | 1 | 0 |
| Building No 3 Wing C | Office space | 36.73 sq m · 395 sq ft | 1 | 0 |
| Building No 3 Wing C | Office space | 40.04 sq m · 431 sq ft | 1 | 0 |
| Building No 3 Wing C | Office space | 41.08 sq m · 442 sq ft | 1 | 0 |
| Building No 3 Wing C | Office space | 54.38 sq m · 585 sq ft | 1 | 0 |
| Building No 3 Wing C | Shop | 19.21 sq m · 207 sq ft | 1 | 0 |
| Building No 3 Wing C | Shop | 23.44 sq m · 252 sq ft | 1 | 0 |
| Building No 3 Wing C | Shop | 25.44 sq m · 274 sq ft | 1 | 0 |
| Building No 4 Wing D | Other | — | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals2
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Dilip K Tambday | — |
| Engineer | JIYAL N Chaudhari | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Tisgaon
- Siddhivinayak SkylarkRERA PM1330002601307
- Gokul VanraiRERA PM1330002600678
- Sai Leela Galaxy D WingRERA PR1330002500931
- Radha HeightsRERA PM1330002500118
- Madhav HeightRERA P51700079630
- Krishna ArcadeRERA P51700076579
- Rai S GalaxyRERA P51700055364
- Prakash LandmarkRERA P51700055019
All 53 projects in Tisgaon · Compare Krishna Vansh with another project