Vaikunth Cluster 3 Tower 2
Deedo IDDP-THN-JF1XIt is due for completion in Jun 2027, with no extension on record; no MahaRERA orders on record; 69% of its units are booked.
Thane (M Corp.), Thane 400608 · by PEPL Developers Pvt Ltd
Buying a flat here?
See every deed registered on it.
It is due for completion in Jun 2027, with no extension on record
- This projectRegistered 24 Feb 2020, completion promised 30 Jun 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700024580
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700024580 | 24 Feb 2020 | 30 Jun 2027 | 30 Jun 2027 | PEPL Developers Pvt Ltd | Project page |
Documents170
1 document held by Deedo, 169 filings listed on MahaRERA's project page
Finance
- PAN CardPan.pdf · uploaded 30 Jan 2020Source
Legal
Show all 170 documentsShow fewer documents
Migrated
- 1 Details of encumbrancesEncumbrance declaration.pdf · uploaded 30 Jan 2020Source
- 1 Copy of Layout Approval (in case of layout)CL3 - Proposed Plan Model (1).pdf · uploaded 30 Jan 2020Source
- 2 Copy of Layout Approval (in case of layout)Layout approval 1042019.pdf · uploaded 30 Jan 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentCC for Cl 3 1to5 tower upto 1st floor 1.pdf · uploaded 30 Jan 2020Source
- 2 Commencement Certificates / NA Order for plotted development31-40 3 3.pdf · uploaded 30 Jan 2020Source
- 3 Commencement Certificates / NA Order for plotted development31-40 4 1.pdf · uploaded 30 Jan 2020Source
- 4 Commencement Certificates / NA Order for plotted development39.pdf · uploaded 30 Jan 2020Source
- 5 Commencement Certificates / NA Order for plotted development40.pdf · uploaded 30 Jan 2020Source
- 1 Declaration in FORM BForm B- Rera.pdf · uploaded 30 Jan 2020Source
- 1 Proforma of Allotment letterAFS.pdf · uploaded 30 Jan 2020Source
- 1 Building Plan Approval / NA Order for plotted development10042019 Perm CC- Building plan approval.pdf · uploaded 31 Jan 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cluster 3 T2 CA certificate 1.pdf · uploaded 31 Jan 2020Source
- 1 OtherRevised T2 declaration.pdf · uploaded 31 Jan 2020Source
- 2 Proforma of Allotment letterLOA - 17022020.pdf · uploaded 19 Feb 2020Source
- 2 OtherRFR - Vaikunth - Cluster 3 -T2 - Final - 11062020.pdf · uploaded 11 Jun 2020Source
- 3 Proforma of Allotment letterRFR - Vaikunth - Cluster 3 -T2 - Final - 11062020 v2.pdf · uploaded 12 Jun 2020Source
- 1 Details of Restarting of Construction work post lockdownVaikunth Cluster 3 TOWER 2.pdf · uploaded 23 Jul 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)PEPL Cluster 3 - T2.pdf · uploaded 8 Feb 2021Source
- 2 Details of encumbrancesVAIKUNTH CLUSTER 3 TOWER 2.pdf · uploaded 14 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)VAIKUNTH CLUSTER 3 TOWER 2 FORM 2 A.pdf · uploaded 14 Aug 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)VAIKUNTH CLUSTER 3 TOWER 2 Form 2 CERTIFICATE.pdf · uploaded 15 Aug 2021Source
- 1 Disclosure of sold/ booked inventoryVAIKUNTH CLUSTER 3 TOWER 2 VIND_compressed.pdf · uploaded 15 Aug 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)30062021_Cluster 3 T2-merged.pdf · uploaded 15 Aug 2021Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)VAIKUNTH CLUSTER 3 TOWER 2 SOCIETY FORM.pdf · uploaded 15 Aug 2021Source
- 3 Copy of Layout Approval (in case of layout)Approval and Layout.pdf · uploaded 7 Oct 2021Source
- 4 Copy of Layout Approval (in case of layout)Approval and Layout.pdf · uploaded 7 Oct 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentApproval and Layout.pdf · uploaded 7 Oct 2021Source
- 6 Commencement Certificates / NA Order for plotted developmentApproval and Layout.pdf · uploaded 7 Oct 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)CLUSTER 3 T2.pdf · uploaded 7 Oct 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)CLUSTER 3 T2.pdf · uploaded 7 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A DECLARATION-VAIKUNTH CLUSTER 3 TOWER 2.pdf · uploaded 7 Oct 2021Source
- 2 Disclosure of sold/ booked inventoryVAIKUNTH CLUSTER 3 T2 VIND.pdf · uploaded 7 Oct 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cluster 3 T2.pdf · uploaded 7 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 DECLARATION-VAIKUNTH CLUSTER 3 TOWER 2.pdf · uploaded 7 Oct 2021Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)VC 3 2.pdf · uploaded 28 Dec 2021Source
- 3 Building Plan Approval / NA Order for plotted developmentAmended Per_CC UDCPR Dec 2021 compress.pdf · uploaded 7 Jan 2022Source
- 7 Commencement Certificates / NA Order for plotted developmentAmended Per_CC UDCPR Dec 2021 compress.pdf · uploaded 7 Jan 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1 - Cluster 3(T2).pdf · uploaded 7 Jan 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)R1 Form 2Engineer CertificatePiramal Vaikunth CL03T2 CB 31122021.pdf · uploaded 7 Jan 2022Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD C 3 T2 VIND.pdf · uploaded 7 Jan 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)31122021_Cluster 3 T2_Signed RRR.pdf · uploaded 7 Jan 2022Source
- 3 Details of encumbrancesVAIKUNTH CLUSTER 3 TOWER 2 ENCUMBRANCE .pdf · uploaded 2 Feb 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)CL_3T2.pdf · uploaded 7 Apr 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC CL3 T2.pdf · uploaded 7 Apr 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)CL3_T2.pdf · uploaded 7 Apr 2022Source
- 4 Disclosure of sold/ booked inventoryDisc Cl3 T2.pdf · uploaded 7 Apr 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CL 3 T2.pdf · uploaded 7 Apr 2022Source
- 4 Details of encumbrancesEncumbrance Certificate-Vaikunth Cluster 3 Tower2.pdf · uploaded 7 Jul 2022Source
- 1 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 7 Jul 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_CL_3T2.pdf · uploaded 7 Jul 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_CL_3T2.pdf · uploaded 7 Jul 2022Source
- 5 Disclosure of sold/ booked inventoryDisc_CL_3T2.pdf · uploaded 7 Jul 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_CL_3T2.pdf · uploaded 7 Jul 2022Source
- 1 CERSAI detailsCERSAI Certificate_Vaikunth.pdf · uploaded 20 Jul 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Vaikunth Cluster 3 T2_Form 5_FY2021-22.pdf · uploaded 30 Sep 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vaikunth Cluster 3 T2.pdf · uploaded 13 Oct 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Cluster 3 T2.pdf · uploaded 13 Oct 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vaikunth CL3 T2 Form 2.pdf · uploaded 13 Oct 2022Source
- 6 Disclosure of sold/ booked inventoryVaikunth Cluster 3 T2.pdf · uploaded 13 Oct 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vaikunth CL 3 T2_merged.pdf · uploaded 18 Oct 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Vaikunth -cl-3-T-2.pdf · uploaded 19 Oct 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3 T2.pdf · uploaded 13 Jan 2023Source
- 7 Disclosure of sold/ booked inventorySold Unsold Inventory Vaikunth CL3 T2.pdf · uploaded 14 Jan 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Vaikunth CL3 T2.pdf · uploaded 16 Jan 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QA_Vaikunth CL-3-T-2.pdf · uploaded 16 Jan 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Vaikunth CL3 T2.pdf · uploaded 16 Jan 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)vaikunth CL 3 T2 2A Mar 23.pdf · uploaded 12 Apr 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)CL 3 T2.pdf · uploaded 14 Apr 2023Source
- 8 Disclosure of sold/ booked inventoryCL 3 T2.pdf · uploaded 14 Apr 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)CL 3 T2.pdf · uploaded 20 Apr 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CL 3 T2.pdf · uploaded 20 Apr 2023Source
- 9 Disclosure of sold/ booked inventoryVaikunth Cluster 3 T2.pdf · uploaded 13 Jul 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vaikunth Cluster 3 T2.pdf · uploaded 14 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) (1).pdf · uploaded 14 Jul 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Vaikunth Cluster 3 T2.pdf · uploaded 14 Jul 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3 T2 EC.pdf · uploaded 20 Jul 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vaikunth CL3 T2.pdf · uploaded 20 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Cluster 3 T2.pdf · uploaded 29 Sep 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)CLUSTER 3 T2 QA.pdf · uploaded 16 Oct 2023Source
- 5 Details of encumbrancesCluster 3 T2.pdf · uploaded 17 Oct 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Cluster 3 T2 AC.pdf · uploaded 17 Oct 2023Source
- 10 Disclosure of sold/ booked inventoryCluster 3 T2 Sold Unsold.pdf · uploaded 17 Oct 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3 T2 EC.pdf · uploaded 19 Oct 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3T2.pdf · uploaded 20 Oct 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cluster 3 T2 CA.pdf · uploaded 20 Oct 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Cluster 3 T2 AC.pdf · uploaded 16 Jan 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentAme Per _ CC Dec 2023.pdf · uploaded 18 Jan 2024Source
- 8 Commencement Certificates / NA Order for plotted developmentAme Per _ CC Dec 2023.pdf · uploaded 18 Jan 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3 T2 EC.pdf · uploaded 18 Jan 2024Source
- 11 Disclosure of sold/ booked inventorySold Unsold Cluster 3T2.pdf · uploaded 18 Jan 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cluster 3 T2 CA.pdf · uploaded 20 Jan 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)CLUSTER 3 T2 AC.pdf · uploaded 15 Apr 2024Source
- 12 Disclosure of sold/ booked inventoryCLUSTER 3 T2 SOLD UNSOLD.pdf · uploaded 15 Apr 2024Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)CL-3-RERA.pdf · uploaded 18 Apr 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3 T2 EC.pdf · uploaded 19 Apr 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cluster 3 T2 CA.pdf · uploaded 19 Apr 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vaikunth CL3 T2_Form1_June 24 .pdf · uploaded 4 Jul 2024Source
- 13 Disclosure of sold/ booked inventoryCluster3 T2 (Vind)_SoldUnsold.pdf · uploaded 4 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Vaikunth C3 T1 Vidya_Vind March.pdf · uploaded 18 Jul 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Vaikunth C3 T2 Vind.pdf · uploaded 18 Jul 2024Source
- 14 Disclosure of sold/ booked inventoryVaikunth C3 T2 - Vind.pdf · uploaded 18 Jul 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vaikunth_CL3_T2_Form 2_June 24.pdf · uploaded 19 Jul 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)V_CL3_T2_merged_compressed.pdf · uploaded 20 Jul 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vaikunth_CL3 T2_Form 3_June 24_compressed.pdf · uploaded 24 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Cluster 3T2 - PEPL Vaikunth mgt signed.pdf · uploaded 7 Oct 2024Source
- 2 Disclosure of sold/ booked inventory12 Piramal Vaikunth Cluster 3 T2, Sold Unsold Inventory.pdf · uploaded 17 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Piramal Vaikunth_Cluster 3 T2 Form 1, Sept'2024.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Piramal Vaikunth_Cluster 3 T2 Form 1, Sept'2024.pdf · uploaded 18 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Piramal Vaikunth_Cluster 3 T2 Form 3, Sept'2024.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Piramal Vaikunth_Cluster 3 T2 Form 2, Sept'2024.pdf · uploaded 18 Oct 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Piramal Vaikunth_Cluster 3 T2 Form 2A, Sept'2024.pdf · uploaded 18 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Piramal Vaikunth Cluster 3 T2 Form 1, December'2024.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vaikunth Cluster 3T2.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Piramal Vaikunth Cl3 T2 Form 2, December'2024.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryPiramal Vaikunth Cluster 3 T2 Sold Unsold Inventory.pdf · uploaded 20 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Piramal Vaikunth Cl3 T2 Form 2A, December'2024.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1, Cl3T2_17042025171444.PDF · uploaded 17 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold Cl3T2_17042025172942-compressed.pdf · uploaded 17 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form _Cl3T2.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Cl3T2.pdf · uploaded 19 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form _Cl3T2 Updated.pdf · uploaded 21 Apr 2025Source
- Form 1Form 1, Cluster 3 T2.pdf · uploaded 29 Sep 2025Source
- Form 2Form 2, Cluster 3 T2.pdf · uploaded 29 Sep 2025Source
- Form 3Form 3, Cluster 3 T2.pdf · uploaded 29 Sep 2025Source
- Disclosure of Sold and Booked InventorySold Unsold, Cluster 3 T2.pdf · uploaded 29 Sep 2025Source
- Form 2A (FY 2024-2025)Vaikunth CL3 T2.pdf · uploaded 30 Sep 2025Source
- Form 5 (FY 2024-2025)Cluster 3 T2.pdf · uploaded 30 Sep 2025Source
- Form 1Form 1, Cluster 3 T2 - Sept 2025.pdf · uploaded 22 Oct 2025Source
- Form 2Form 2, Cluster 3 T2 - Sept 2025.pdf · uploaded 22 Oct 2025Source
- Form 3Form 3, Cluster 3 T2 - Sept 2025 .pdf · uploaded 22 Oct 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory Cluster 3 T2 - Sep'25.pdf · uploaded 22 Oct 2025Source
- Form 104 Form 1 - Cluster 3 T2.pdf · uploaded 20 Jan 2026Source
- Form 204 Form 2 - Cluster 3 T2.pdf · uploaded 20 Jan 2026Source
- Form 304 Form 3 - Cluster 3 T2.pdf · uploaded 20 Jan 2026Source
- Disclosure of Sold and Booked Inventory04 Sold Unsold - Cluster 3 T2.pdf · uploaded 20 Jan 2026Source
- Others04 Vaikunth encumbrance Cluster 3 T2.pdf · uploaded 20 Jan 2026Source
- Form 104 Form 1 - Cluster 3 T2 Mar 26.pdf · uploaded 20 Apr 2026Source
- Form 204 Form 2 - Cluster 3 T2 Mar 26.pdf · uploaded 20 Apr 2026Source
- Form 304 Form 3 - Cluster 3 T2 Mar 26.pdf · uploaded 20 Apr 2026Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory - Vind_.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2025-2026)00 Form 2A Vaikunth Cluster 3 T2.pdf · uploaded 30 Jun 2026Source
- Withdrawal Update Form 101 Vaikunth Cluster 3 T2 - Form 1 June 2026.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 203 Vaikunth Cluster 3 T2 - Form 3 June 2026.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 303 Vaikunth Cluster 3 T2 - Form 3 June 2026.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)Cluster 3 T2.pdf · uploaded 30 Sep 2026Source
Technical
- DocumentCL3 - Proposed Plan Model (1).pdf · uploaded 30 Jan 2020Source
- DocumentLayout approval 1042019.pdf · uploaded 30 Jan 2020Source
- Document10042019 Perm CC- Building plan approval.pdf · uploaded 31 Jan 2020Source
- DocumentApproval and Layout.pdf · uploaded 7 Oct 2021Source
- DocumentApproval and Layout.pdf · uploaded 7 Oct 2021Source
- DocumentApproval and Layout.pdf · uploaded 7 Oct 2021Source
- DocumentAmended Per_CC UDCPR Dec 2021 compress.pdf · uploaded 7 Jan 2022Source
- DocumentAme Per _ CC Dec 2023.pdf · uploaded 18 Jan 2024Source
- DocumentCluster 3 T1 and T2 OC.pdf · uploaded 20 Jul 2026Source
Technical (Architect)
- DocumentPiramal Vaikunth_Cluster 3 T2 Form 1, Sept'2024.pdf · uploaded 18 Oct 2024Source
- DocumentPiramal Vaikunth Cluster 3 T2 Form 1, December'2024.pdf · uploaded 20 Jan 2025Source
- DocumentForm 1, Cl3T2_17042025171444.PDF · uploaded 17 Apr 2025Source
- Document01 Vaikunth Cluster 3 T2 - Form 1 June 2026.pdf · uploaded 20 Jul 2026Source
Technical (Engineer)
- DocumentPiramal Vaikunth_Cluster 3 T2 Form 2, Sept'2024.pdf · uploaded 18 Oct 2024Source
- DocumentPiramal Vaikunth Cl3 T2 Form 2, December'2024.pdf · uploaded 20 Jan 2025Source
- DocumentForm 2_Cl3T2.pdf · uploaded 19 Apr 2025Source
- Document03 Vaikunth Cluster 3 T2 - Form 3 June 2026.pdf · uploaded 20 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 100/14a, 100/24 to 30
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK635 units in all
- Address
- 7/1 to 14, 8/1 to 37, 39 to 42, 9/1 to 17, 10/2 to 9, 10/10a, 10/10b, 10/11 to 18, 88/6, 99/13b, 15b, 100/14a, 15b, 16b, 17a, b, 18a, 19b, 20, 100/24 to 30, 100/31a and b, 100/32 and 33, 101/2 and 3, 105/1 to 20, Balkum road, ThanePIN 400608
- Village
- Thane (M Corp.), Thane taluka
- Land area for this project
- 1,239 sq m (13,336 sq ft)
- Permissible built-up area
- 38,952 sq m (4,19,275 sq ft)
- Sanctioned built-up area
- 38,952 sq m (4,19,275 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
7/1 to 14, 8/1 to 37, 39 to 42, 9/1 to 17, 10/2 to 9, 10/10a, 10/10b, 10/11 to 18, 88/6, 99/13b, 15b, 100/14a, 15b, 16b, 17a,b, 18a, 19b, 20, 100/24 to 30, 100/31a and b, 100/32 and 33, 101/2 and 3, 105/1 to 20
Boundaries
- North
- N58772e309426 N66127e312188
- South
- N75350e260288 N66943e257131
- East
- N87870e298690 N92229e287081
- West
- N42755e281750 N47114e270141
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking635 units
441 of 635 units booked (69%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 30 sq m · 323 sq ft | 184 | 174 |
| 1BHK | 34 sq m · 366 sq ft | 82 | 76 |
| 1BHK | 36 sq m · 388 sq ft | 82 | 64 |
| 1BHK | 43 sq m · 463 sq ft | 82 | 34 |
| 2BHK | 48 sq m · 517 sq ft | 164 | 74 |
| 2BHK | 49 sq m · 527 sq ft | 41 | 19 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals50
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Engineer | Kishor Parmar | — |
| Registered real estate agent | Alok Pandurang Gujar | — |
| Registered real estate agent | Alpa Sanjeev Chande | — |
| Registered real estate agent | Amit Sidhani | — |
| Registered real estate agent | Anandrao Narayan Bamane | — |
| Registered real estate agent | Anand Vilas khanvilkar | — |
| Registered real estate agent | Anupam Kumar Tiwari | — |
| Registered real estate agent | Arjun Kashiram Pawar | — |
Show all 50 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Ashish Ganesh Mishra | — |
| Registered real estate agent | Atul Ankush Kadam | — |
| Registered real estate agent | Bikram Singh Mali | — |
| Registered real estate agent | Chander Kumar Randhawa | — |
| Registered real estate agent | Darshan Vijaykumar Chavan | — |
| Registered real estate agent | Deepak Murli Chotmurad | — |
| Registered real estate agent | Deepika Bothra | — |
| Registered real estate agent | Dinesh Singh Yadav | — |
| Registered real estate agent | Himanshu Ganpat Dosi | — |
| Registered real estate agent | Jayesh Premji Bhanushali | — |
| Registered real estate agent | Kamal Rajesh Narwani | — |
| Registered real estate agent | Ketan Pankaj Jain | — |
| Registered real estate agent | Khushbu Lalabhai Valand | — |
| Registered real estate agent | Kinjal Khania | — |
| Registered real estate agent | Mallesh Rajendra Borate | — |
| Registered real estate agent | Mamta Gotam Chadiwal | — |
| Registered real estate agent | Manisha Nair | — |
| Registered real estate agent | Mohit Gadhyan | — |
| Registered real estate agent | Mukund M Uke | — |
| Registered real estate agent | Navneet Mishra | — |
| Registered real estate agent | Nazir Nasir Hussain | — |
| Registered real estate agent | Nitin Maruti Thorat | — |
| Registered real estate agent | Prakash Bacchubhai Rot | — |
| Registered real estate agent | Pranjali Suhas Pawar | — |
| Registered real estate agent | Prashant Gautam Bande | — |
| Registered real estate agent | Ragini Umesh Pandey | — |
| Registered real estate agent | Rahul Baburao Jadhav | — |
| Registered real estate agent | Rahul Mahavir Sharma | — |
| Registered real estate agent | Ravindra Bhoir | — |
| Registered real estate agent | Sachin Bhandari | — |
| Registered real estate agent | Sadanand Mahadeo Bamne | — |
| Registered real estate agent | Sanjay Kumar Jaiswal | — |
| Registered real estate agent | Santosh Raosaheb Gurav | — |
| Registered real estate agent | Saurabh Gangwar | — |
| Registered real estate agent | Sayed Amirali Mehboobali | — |
| Registered real estate agent | Sumit Suresh Kedia | — |
| Registered real estate agent | Uttam Bhiku Shirke | — |
| Registered real estate agent | Vasantha Raghuram Shetty | — |
| Registered real estate agent | Victor DSouza | — |
| Registered real estate agent | Vilas Baban Shirgaonkar | — |
| Registered real estate agent | Vinod Kumar | — |
| Registered real estate agent | Vivek Kumar Raghwender Singh | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Thane (M Corp.)
- Metro MilleniaRERA PM1330002602679
- Kalyani Krupa Co.op Hsg Soc LtdRERA PR1330002602399
- Shreeji's Laxmi Jyot CHSLRERA PR1330002602306
- RivantaRERA PM1330002601984
- Shree Gangadhar ChslRERA PM1330002601922
- The Lake CornerRERA PM1330002601899
- Shree AudumbarRERA PR1330002601484
- Shreyas Co-Op Hsg. Soc. Ltd.RERA PR1330002601418
All 898 projects in Thane (M Corp.) · Compare Vaikunth Cluster 3 Tower 2 with another project