Vaikunth Cluster 3 Tower 2

Deedo IDDP-THN-JF1X

It is due for completion in Jun 2027, with no extension on record; no MahaRERA orders on record; 69% of its units are booked.

Thane (M Corp.), Thane 400608 · by PEPL Developers Pvt Ltd

DeliveryDue Jun 2027No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales69% booked441 of 635 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Jun 2027, with no extension on record

  • This projectRegistered 24 Feb 2020, completion promised 30 Jun 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700024580
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170002458024 Feb 202030 Jun 202730 Jun 2027PEPL Developers Pvt LtdProject page
Documents170

1 document held by Deedo, 169 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan.pdf · uploaded 30 Jan 2020Source

Legal

  • Legal Title reportTitle.pdf · uploaded 30 Jan 2020Source
  • Declaration Form BForm B- Rera.pdf · uploaded 30 Jan 2020Source
  • OtherRevised T2 declaration.pdf · uploaded 31 Jan 2020Source
  • OtherRFR - Vaikunth - Cluster 3 -T2 - Final - 11062020.pdf · uploaded 11 Jun 2020Source

Migrated

  • 1 PAN CardPan.pdf · uploaded 30 Jan 2020Source
  • 1 Copy of the legal title reportTitle.pdf · uploaded 30 Jan 2020Source
Show all 170 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesEncumbrance declaration.pdf · uploaded 30 Jan 2020Source
  • 1 Copy of Layout Approval (in case of layout)CL3 - Proposed Plan Model (1).pdf · uploaded 30 Jan 2020Source
  • 2 Copy of Layout Approval (in case of layout)Layout approval 1042019.pdf · uploaded 30 Jan 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC for Cl 3 1to5 tower upto 1st floor 1.pdf · uploaded 30 Jan 2020Source
  • 2 Commencement Certificates / NA Order for plotted development31-40 3 3.pdf · uploaded 30 Jan 2020Source
  • 3 Commencement Certificates / NA Order for plotted development31-40 4 1.pdf · uploaded 30 Jan 2020Source
  • 4 Commencement Certificates / NA Order for plotted development39.pdf · uploaded 30 Jan 2020Source
  • 5 Commencement Certificates / NA Order for plotted development40.pdf · uploaded 30 Jan 2020Source
  • 1 Declaration in FORM BForm B- Rera.pdf · uploaded 30 Jan 2020Source
  • 1 Proforma of Allotment letterAFS.pdf · uploaded 30 Jan 2020Source
  • 1 Building Plan Approval / NA Order for plotted development10042019 Perm CC- Building plan approval.pdf · uploaded 31 Jan 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cluster 3 T2 CA certificate 1.pdf · uploaded 31 Jan 2020Source
  • 1 OtherRevised T2 declaration.pdf · uploaded 31 Jan 2020Source
  • 2 Proforma of Allotment letterLOA - 17022020.pdf · uploaded 19 Feb 2020Source
  • 2 OtherRFR - Vaikunth - Cluster 3 -T2 - Final - 11062020.pdf · uploaded 11 Jun 2020Source
  • 3 Proforma of Allotment letterRFR - Vaikunth - Cluster 3 -T2 - Final - 11062020 v2.pdf · uploaded 12 Jun 2020Source
  • 1 Details of Restarting of Construction work post lockdownVaikunth Cluster 3 TOWER 2.pdf · uploaded 23 Jul 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)PEPL Cluster 3 - T2.pdf · uploaded 8 Feb 2021Source
  • 2 Details of encumbrancesVAIKUNTH CLUSTER 3 TOWER 2.pdf · uploaded 14 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)VAIKUNTH CLUSTER 3 TOWER 2 FORM 2 A.pdf · uploaded 14 Aug 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)VAIKUNTH CLUSTER 3 TOWER 2 Form 2 CERTIFICATE.pdf · uploaded 15 Aug 2021Source
  • 1 Disclosure of sold/ booked inventoryVAIKUNTH CLUSTER 3 TOWER 2 VIND_compressed.pdf · uploaded 15 Aug 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)30062021_Cluster 3 T2-merged.pdf · uploaded 15 Aug 2021Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)VAIKUNTH CLUSTER 3 TOWER 2 SOCIETY FORM.pdf · uploaded 15 Aug 2021Source
  • 3 Copy of Layout Approval (in case of layout)Approval and Layout.pdf · uploaded 7 Oct 2021Source
  • 4 Copy of Layout Approval (in case of layout)Approval and Layout.pdf · uploaded 7 Oct 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentApproval and Layout.pdf · uploaded 7 Oct 2021Source
  • 6 Commencement Certificates / NA Order for plotted developmentApproval and Layout.pdf · uploaded 7 Oct 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)CLUSTER 3 T2.pdf · uploaded 7 Oct 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)CLUSTER 3 T2.pdf · uploaded 7 Oct 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A DECLARATION-VAIKUNTH CLUSTER 3 TOWER 2.pdf · uploaded 7 Oct 2021Source
  • 2 Disclosure of sold/ booked inventoryVAIKUNTH CLUSTER 3 T2 VIND.pdf · uploaded 7 Oct 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cluster 3 T2.pdf · uploaded 7 Oct 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 DECLARATION-VAIKUNTH CLUSTER 3 TOWER 2.pdf · uploaded 7 Oct 2021Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)VC 3 2.pdf · uploaded 28 Dec 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentAmended Per_CC UDCPR Dec 2021 compress.pdf · uploaded 7 Jan 2022Source
  • 7 Commencement Certificates / NA Order for plotted developmentAmended Per_CC UDCPR Dec 2021 compress.pdf · uploaded 7 Jan 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1 - Cluster 3(T2).pdf · uploaded 7 Jan 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)R1 Form 2Engineer CertificatePiramal Vaikunth CL03T2 CB 31122021.pdf · uploaded 7 Jan 2022Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD C 3 T2 VIND.pdf · uploaded 7 Jan 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)31122021_Cluster 3 T2_Signed RRR.pdf · uploaded 7 Jan 2022Source
  • 3 Details of encumbrancesVAIKUNTH CLUSTER 3 TOWER 2 ENCUMBRANCE .pdf · uploaded 2 Feb 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)CL_3T2.pdf · uploaded 7 Apr 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC CL3 T2.pdf · uploaded 7 Apr 2022Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)CL3_T2.pdf · uploaded 7 Apr 2022Source
  • 4 Disclosure of sold/ booked inventoryDisc Cl3 T2.pdf · uploaded 7 Apr 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CL 3 T2.pdf · uploaded 7 Apr 2022Source
  • 4 Details of encumbrancesEncumbrance Certificate-Vaikunth Cluster 3 Tower2.pdf · uploaded 7 Jul 2022Source
  • 1 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 7 Jul 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_CL_3T2.pdf · uploaded 7 Jul 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)EC_CL_3T2.pdf · uploaded 7 Jul 2022Source
  • 5 Disclosure of sold/ booked inventoryDisc_CL_3T2.pdf · uploaded 7 Jul 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_CL_3T2.pdf · uploaded 7 Jul 2022Source
  • 1 CERSAI detailsCERSAI Certificate_Vaikunth.pdf · uploaded 20 Jul 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Vaikunth Cluster 3 T2_Form 5_FY2021-22.pdf · uploaded 30 Sep 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vaikunth Cluster 3 T2.pdf · uploaded 13 Oct 2022Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Cluster 3 T2.pdf · uploaded 13 Oct 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vaikunth CL3 T2 Form 2.pdf · uploaded 13 Oct 2022Source
  • 6 Disclosure of sold/ booked inventoryVaikunth Cluster 3 T2.pdf · uploaded 13 Oct 2022Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vaikunth CL 3 T2_merged.pdf · uploaded 18 Oct 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Vaikunth -cl-3-T-2.pdf · uploaded 19 Oct 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3 T2.pdf · uploaded 13 Jan 2023Source
  • 7 Disclosure of sold/ booked inventorySold Unsold Inventory Vaikunth CL3 T2.pdf · uploaded 14 Jan 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Vaikunth CL3 T2.pdf · uploaded 16 Jan 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QA_Vaikunth CL-3-T-2.pdf · uploaded 16 Jan 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Vaikunth CL3 T2.pdf · uploaded 16 Jan 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)vaikunth CL 3 T2 2A Mar 23.pdf · uploaded 12 Apr 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)CL 3 T2.pdf · uploaded 14 Apr 2023Source
  • 8 Disclosure of sold/ booked inventoryCL 3 T2.pdf · uploaded 14 Apr 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)CL 3 T2.pdf · uploaded 20 Apr 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CL 3 T2.pdf · uploaded 20 Apr 2023Source
  • 9 Disclosure of sold/ booked inventoryVaikunth Cluster 3 T2.pdf · uploaded 13 Jul 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vaikunth Cluster 3 T2.pdf · uploaded 14 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) (1).pdf · uploaded 14 Jul 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Vaikunth Cluster 3 T2.pdf · uploaded 14 Jul 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3 T2 EC.pdf · uploaded 20 Jul 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vaikunth CL3 T2.pdf · uploaded 20 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Cluster 3 T2.pdf · uploaded 29 Sep 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)CLUSTER 3 T2 QA.pdf · uploaded 16 Oct 2023Source
  • 5 Details of encumbrancesCluster 3 T2.pdf · uploaded 17 Oct 2023Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Cluster 3 T2 AC.pdf · uploaded 17 Oct 2023Source
  • 10 Disclosure of sold/ booked inventoryCluster 3 T2 Sold Unsold.pdf · uploaded 17 Oct 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3 T2 EC.pdf · uploaded 19 Oct 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3T2.pdf · uploaded 20 Oct 2023Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cluster 3 T2 CA.pdf · uploaded 20 Oct 2023Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Cluster 3 T2 AC.pdf · uploaded 16 Jan 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentAme Per _ CC Dec 2023.pdf · uploaded 18 Jan 2024Source
  • 8 Commencement Certificates / NA Order for plotted developmentAme Per _ CC Dec 2023.pdf · uploaded 18 Jan 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3 T2 EC.pdf · uploaded 18 Jan 2024Source
  • 11 Disclosure of sold/ booked inventorySold Unsold Cluster 3T2.pdf · uploaded 18 Jan 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cluster 3 T2 CA.pdf · uploaded 20 Jan 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)CLUSTER 3 T2 AC.pdf · uploaded 15 Apr 2024Source
  • 12 Disclosure of sold/ booked inventoryCLUSTER 3 T2 SOLD UNSOLD.pdf · uploaded 15 Apr 2024Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)CL-3-RERA.pdf · uploaded 18 Apr 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cluster 3 T2 EC.pdf · uploaded 19 Apr 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cluster 3 T2 CA.pdf · uploaded 19 Apr 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vaikunth CL3 T2_Form1_June 24 .pdf · uploaded 4 Jul 2024Source
  • 13 Disclosure of sold/ booked inventoryCluster3 T2 (Vind)_SoldUnsold.pdf · uploaded 4 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Vaikunth C3 T1 Vidya_Vind March.pdf · uploaded 18 Jul 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Vaikunth C3 T2 Vind.pdf · uploaded 18 Jul 2024Source
  • 14 Disclosure of sold/ booked inventoryVaikunth C3 T2 - Vind.pdf · uploaded 18 Jul 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vaikunth_CL3_T2_Form 2_June 24.pdf · uploaded 19 Jul 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)V_CL3_T2_merged_compressed.pdf · uploaded 20 Jul 2024Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vaikunth_CL3 T2_Form 3_June 24_compressed.pdf · uploaded 24 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Cluster 3T2 - PEPL Vaikunth mgt signed.pdf · uploaded 7 Oct 2024Source
  • 2 Disclosure of sold/ booked inventory12 Piramal Vaikunth Cluster 3 T2, Sold Unsold Inventory.pdf · uploaded 17 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Piramal Vaikunth_Cluster 3 T2 Form 1, Sept'2024.pdf · uploaded 18 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Piramal Vaikunth_Cluster 3 T2 Form 1, Sept'2024.pdf · uploaded 18 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Piramal Vaikunth_Cluster 3 T2 Form 3, Sept'2024.pdf · uploaded 18 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Piramal Vaikunth_Cluster 3 T2 Form 2, Sept'2024.pdf · uploaded 18 Oct 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Piramal Vaikunth_Cluster 3 T2 Form 2A, Sept'2024.pdf · uploaded 18 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Piramal Vaikunth Cluster 3 T2 Form 1, December'2024.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vaikunth Cluster 3T2.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Piramal Vaikunth Cl3 T2 Form 2, December'2024.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryPiramal Vaikunth Cluster 3 T2 Sold Unsold Inventory.pdf · uploaded 20 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Piramal Vaikunth Cl3 T2 Form 2A, December'2024.pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1, Cl3T2_17042025171444.PDF · uploaded 17 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold Cl3T2_17042025172942-compressed.pdf · uploaded 17 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form _Cl3T2.pdf · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Cl3T2.pdf · uploaded 19 Apr 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form _Cl3T2 Updated.pdf · uploaded 21 Apr 2025Source
  • Form 1Form 1, Cluster 3 T2.pdf · uploaded 29 Sep 2025Source
  • Form 2Form 2, Cluster 3 T2.pdf · uploaded 29 Sep 2025Source
  • Form 3Form 3, Cluster 3 T2.pdf · uploaded 29 Sep 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold, Cluster 3 T2.pdf · uploaded 29 Sep 2025Source
  • Form 2A (FY 2024-2025)Vaikunth CL3 T2.pdf · uploaded 30 Sep 2025Source
  • Form 5 (FY 2024-2025)Cluster 3 T2.pdf · uploaded 30 Sep 2025Source
  • Form 1Form 1, Cluster 3 T2 - Sept 2025.pdf · uploaded 22 Oct 2025Source
  • Form 2Form 2, Cluster 3 T2 - Sept 2025.pdf · uploaded 22 Oct 2025Source
  • Form 3Form 3, Cluster 3 T2 - Sept 2025 .pdf · uploaded 22 Oct 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory Cluster 3 T2 - Sep'25.pdf · uploaded 22 Oct 2025Source
  • Form 104 Form 1 - Cluster 3 T2.pdf · uploaded 20 Jan 2026Source
  • Form 204 Form 2 - Cluster 3 T2.pdf · uploaded 20 Jan 2026Source
  • Form 304 Form 3 - Cluster 3 T2.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked Inventory04 Sold Unsold - Cluster 3 T2.pdf · uploaded 20 Jan 2026Source
  • Others04 Vaikunth encumbrance Cluster 3 T2.pdf · uploaded 20 Jan 2026Source
  • Form 104 Form 1 - Cluster 3 T2 Mar 26.pdf · uploaded 20 Apr 2026Source
  • Form 204 Form 2 - Cluster 3 T2 Mar 26.pdf · uploaded 20 Apr 2026Source
  • Form 304 Form 3 - Cluster 3 T2 Mar 26.pdf · uploaded 20 Apr 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory - Vind_.pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2025-2026)00 Form 2A Vaikunth Cluster 3 T2.pdf · uploaded 30 Jun 2026Source
  • Withdrawal Update Form 101 Vaikunth Cluster 3 T2 - Form 1 June 2026.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 203 Vaikunth Cluster 3 T2 - Form 3 June 2026.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 303 Vaikunth Cluster 3 T2 - Form 3 June 2026.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2025-2026)Cluster 3 T2.pdf · uploaded 30 Sep 2026Source

Technical

  • DocumentCL3 - Proposed Plan Model (1).pdf · uploaded 30 Jan 2020Source
  • DocumentLayout approval 1042019.pdf · uploaded 30 Jan 2020Source
  • Document10042019 Perm CC- Building plan approval.pdf · uploaded 31 Jan 2020Source
  • DocumentApproval and Layout.pdf · uploaded 7 Oct 2021Source
  • DocumentApproval and Layout.pdf · uploaded 7 Oct 2021Source
  • DocumentApproval and Layout.pdf · uploaded 7 Oct 2021Source
  • DocumentAmended Per_CC UDCPR Dec 2021 compress.pdf · uploaded 7 Jan 2022Source
  • DocumentAme Per _ CC Dec 2023.pdf · uploaded 18 Jan 2024Source
  • DocumentCluster 3 T1 and T2 OC.pdf · uploaded 20 Jul 2026Source

Technical (Architect)

  • DocumentPiramal Vaikunth_Cluster 3 T2 Form 1, Sept'2024.pdf · uploaded 18 Oct 2024Source
  • DocumentPiramal Vaikunth Cluster 3 T2 Form 1, December'2024.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 1, Cl3T2_17042025171444.PDF · uploaded 17 Apr 2025Source
  • Document01 Vaikunth Cluster 3 T2 - Form 1 June 2026.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentPiramal Vaikunth_Cluster 3 T2 Form 2, Sept'2024.pdf · uploaded 18 Oct 2024Source
  • DocumentPiramal Vaikunth Cl3 T2 Form 2, December'2024.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 2_Cl3T2.pdf · uploaded 19 Apr 2025Source
  • Document03 Vaikunth Cluster 3 T2 - Form 3 June 2026.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 100/14a, 100/24 to 30

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK635 units in all
Address
7/1 to 14, 8/1 to 37, 39 to 42, 9/1 to 17, 10/2 to 9, 10/10a, 10/10b, 10/11 to 18, 88/6, 99/13b, 15b, 100/14a, 15b, 16b, 17a, b, 18a, 19b, 20, 100/24 to 30, 100/31a and b, 100/32 and 33, 101/2 and 3, 105/1 to 20, Balkum road, ThanePIN 400608
Village
Thane (M Corp.), Thane taluka
Land area for this project
1,239 sq m (13,336 sq ft)
Permissible built-up area
38,952 sq m (4,19,275 sq ft)
Sanctioned built-up area
38,952 sq m (4,19,275 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

100/14a100/24 to 30100/31a100/3210/10a10/10b10/11 to 18101/210/2 to 9105/1 to 2015b16b17a18a19b2033339 to 427/1 to 148/1 to 3788/69/1 to 1799/13b

Land as published on MahaRERA's project page

7/1 to 14, 8/1 to 37, 39 to 42, 9/1 to 17, 10/2 to 9, 10/10a, 10/10b, 10/11 to 18, 88/6, 99/13b, 15b, 100/14a, 15b, 16b, 17a,b, 18a, 19b, 20, 100/24 to 30, 100/31a and b, 100/32 and 33, 101/2 and 3, 105/1 to 20

Boundaries

North
N58772e309426 N66127e312188
South
N75350e260288 N66943e257131
East
N87870e298690 N92229e287081
West
N42755e281750 N47114e270141

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking635 units

441 of 635 units booked (69%), as the promoter reported to MahaRERA

1BHK · 430 units2BHK · 205 units
TypeCarpet areaUnitsBooked
1BHK30 sq m · 323 sq ft184174
1BHK34 sq m · 366 sq ft8276
1BHK36 sq m · 388 sq ft8264
1BHK43 sq m · 463 sq ft8234
2BHK48 sq m · 517 sq ft16474
2BHK49 sq m · 527 sq ft4119

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals50

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
EngineerKishor Parmar—
Registered real estate agentAlok Pandurang Gujar—
Registered real estate agentAlpa Sanjeev Chande—
Registered real estate agentAmit Sidhani—
Registered real estate agentAnandrao Narayan Bamane—
Registered real estate agentAnand Vilas khanvilkar—
Registered real estate agentAnupam Kumar Tiwari—
Registered real estate agentArjun Kashiram Pawar—
Show all 50 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentAshish Ganesh Mishra—
Registered real estate agentAtul Ankush Kadam—
Registered real estate agentBikram Singh Mali—
Registered real estate agentChander Kumar Randhawa—
Registered real estate agentDarshan Vijaykumar Chavan—
Registered real estate agentDeepak Murli Chotmurad—
Registered real estate agentDeepika Bothra—
Registered real estate agentDinesh Singh Yadav—
Registered real estate agentHimanshu Ganpat Dosi—
Registered real estate agentJayesh Premji Bhanushali—
Registered real estate agentKamal Rajesh Narwani—
Registered real estate agentKetan Pankaj Jain—
Registered real estate agentKhushbu Lalabhai Valand—
Registered real estate agentKinjal Khania—
Registered real estate agentMallesh Rajendra Borate—
Registered real estate agentMamta Gotam Chadiwal—
Registered real estate agentManisha Nair—
Registered real estate agentMohit Gadhyan—
Registered real estate agentMukund M Uke—
Registered real estate agentNavneet Mishra—
Registered real estate agentNazir Nasir Hussain—
Registered real estate agentNitin Maruti Thorat—
Registered real estate agentPrakash Bacchubhai Rot—
Registered real estate agentPranjali Suhas Pawar—
Registered real estate agentPrashant Gautam Bande—
Registered real estate agentRagini Umesh Pandey—
Registered real estate agentRahul Baburao Jadhav—
Registered real estate agentRahul Mahavir Sharma—
Registered real estate agentRavindra Bhoir—
Registered real estate agentSachin Bhandari—
Registered real estate agentSadanand Mahadeo Bamne—
Registered real estate agentSanjay Kumar Jaiswal—
Registered real estate agentSantosh Raosaheb Gurav—
Registered real estate agentSaurabh Gangwar—
Registered real estate agentSayed Amirali Mehboobali—
Registered real estate agentSumit Suresh Kedia—
Registered real estate agentUttam Bhiku Shirke—
Registered real estate agentVasantha Raghuram Shetty—
Registered real estate agentVictor DSouza—
Registered real estate agentVilas Baban Shirgaonkar—
Registered real estate agentVinod Kumar—
Registered real estate agentVivek Kumar Raghwender Singh—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Thane (M Corp.)

All 898 projects in Thane (M Corp.) · Compare Vaikunth Cluster 3 Tower 2 with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology