Commercial · 1 building · 304 unitsRERA P51700077852

Times Square

Deedo IDDP-THN-F0HT

Completion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 0% of its units are booked.

Thane (M Corp.), Thane 400604 · by Supper Squarefeet Infraventures Llp

DeliveryExtended 4 moPromised Dec 2029 · now due Apr 2030RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 304 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2030

  • This projectRegistered 7 Nov 2024, completion promised 31 Dec 2029, revised to 30 Apr 2030.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700077852
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000778527 Nov 202431 Dec 202930 Apr 2030Supper Squarefeet Infraventures LLPProject page
Documents161

1 document held by Deedo, 160 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN CARD - TIMES SQUARE.pdf · uploaded 8 Oct 2024Source
  • Other – FinanceSelf Declaration.pdf · uploaded 28 Oct 2024Source

Legal

  • Declaration Form BFORM B PROMOTOR BY DEVELOPER.pdf · uploaded 8 Oct 2024Source
  • Legal Title reportTITLE REPORT.pdf · uploaded 11 Oct 2024Source

Migrated

  • 1 PAN CardPAN CARD - TIMES SQUARE.pdf · uploaded 8 Oct 2024Source
  • 1 a Details of encumbrances concerned to FinanceNo encumbrance to legal and finance.pdf · uploaded 8 Oct 2024Source
  • 1 Copy of Layout Approval (in case of layout)floor plan_1-1.pdf · uploaded 8 Oct 2024Source
Show all 161 documentsShow fewer documents

Migrated

  • 1 Declaration in FORM BFORM B PROMOTOR BY DEVELOPER.pdf · uploaded 8 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect's Certificate.pdf · uploaded 8 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - ENGINEER'S CERTIFICATE.pdf · uploaded 8 Oct 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentcc.pdf · uploaded 8 Oct 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentfloor plan_7-7.pdf · uploaded 8 Oct 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentfloor plan_2-2.pdf · uploaded 8 Oct 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentfloor plan_3-3.pdf · uploaded 8 Oct 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentfloor plan_4-4.pdf · uploaded 8 Oct 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentfloor plan_5-5.pdf · uploaded 8 Oct 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentfloor plan_6-6.pdf · uploaded 8 Oct 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentfloor plan_8-8.pdf · uploaded 8 Oct 2024Source
  • 8 Building Plan Approval / NA Order for plotted developmentfloor plan_9-9.pdf · uploaded 8 Oct 2024Source
  • 9 Building Plan Approval / NA Order for plotted developmentfloor plan_10-end.pdf · uploaded 8 Oct 2024Source
  • 1 Declaration about Commencement CertificateForm D - Decleration about Commencement Certificate.pdf · uploaded 8 Oct 2024Source
  • 1 CERSAI detailsCersai Upload.pdf · uploaded 8 Oct 2024Source
  • 1 b Details of encumbrances concerned to LegalNo encumbrance to legal and finance.pdf · uploaded 8 Oct 2024Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)format bank letterhead.pdf · uploaded 8 Oct 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectDISCLOSURE OF SECURED AND UNSECURED.pdf · uploaded 8 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ca certificate 28-10-2024.pdf · uploaded 10 Oct 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)format promoter letterhead.pdf · uploaded 10 Oct 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDOI 1_DOI 2_DOI 3.pdf · uploaded 10 Oct 2024Source
  • 1 Copy of the legal title reportTITLE REPORT.pdf · uploaded 11 Oct 2024Source
  • 1 Deviation Report with respect to Allotment letterDEVIATION OF ALLOTMENT.pdf · uploaded 11 Oct 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION OF AGREEMENT.pdf · uploaded 11 Oct 2024Source
  • 1 Proforma of Allotment letterALLOTMENT LETTER TIMES SQUARE.pdf · uploaded 12 Oct 2024Source
  • 1 Proforma of Agreement for saleFinal Rera Agreement 14102024.pdf · uploaded 14 Oct 2024Source
  • 1 Other – TechnicalAnnexure A.pdf · uploaded 19 Oct 2024Source
  • 1 Other – FinanceSelf Declaration.pdf · uploaded 28 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 TS.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 TS 31-12-2024_compressed.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 TS.pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 TS.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 TS 31-12-2024_compressed.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 TS.pdf · uploaded 20 Jan 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC letter A 11 and B 17.pdf · uploaded 11 Mar 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentRevised Plan-1.pdf · uploaded 12 Mar 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentRevised Plan-2.pdf · uploaded 12 Mar 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentRevised Plan-3.pdf · uploaded 12 Mar 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentRevised Plan-4.pdf · uploaded 12 Mar 2025Source
  • 5 Building Plan Approval / NA Order for plotted developmentRevised Plan-5.pdf · uploaded 12 Mar 2025Source
  • 6 Building Plan Approval / NA Order for plotted developmentRevised Plan-6.pdf · uploaded 12 Mar 2025Source
  • 7 Building Plan Approval / NA Order for plotted developmentRevised Plan-7.pdf · uploaded 12 Mar 2025Source
  • 8 Building Plan Approval / NA Order for plotted developmentRevised Plan-8.pdf · uploaded 12 Mar 2025Source
  • 9 Building Plan Approval / NA Order for plotted developmentRevised Plan-9.pdf · uploaded 12 Mar 2025Source
  • 10 Building Plan Approval / NA Order for plotted developmentRevised Plan-10.pdf · uploaded 12 Mar 2025Source
  • 11 Building Plan Approval / NA Order for plotted developmentRevised Plan-11.pdf · uploaded 12 Mar 2025Source
  • 12 Building Plan Approval / NA Order for plotted developmentRevised Plan-12.pdf · uploaded 12 Mar 2025Source
  • 13 Building Plan Approval / NA Order for plotted developmentRevised Plan-13.pdf · uploaded 12 Mar 2025Source
  • Form 1FORM 1 TS.pdf · uploaded 9 Jun 2025Source
  • Form 2FORM 2 TS.pdf · uploaded 9 Jun 2025Source
  • Form 3FORM 3 TS 31-12-2024_compressed.pdf · uploaded 9 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold, Unsold 2024.pdf · uploaded 9 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaration Dec 2024.pdf · uploaded 9 Jun 2025Source
  • Form 1Form 1.pdf · uploaded 9 Jun 2025Source
  • Form 2Form 2.pdf · uploaded 9 Jun 2025Source
  • Form 3Form 3.pdf · uploaded 9 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold, Booked & Unsold.pdf · uploaded 9 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaration March 2025.pdf · uploaded 9 Jun 2025Source
  • Withdrawal Update Form 1Form 1 - Architect's Certificate.pdf · uploaded 14 Jun 2025Source
  • Withdrawal Update Form 2Form 2 - ENGINEER'S CERTIFICATE.pdf · uploaded 14 Jun 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 14 Jun 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 1Form 1 Q2.pdf · uploaded 20 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Q2.pdf · uploaded 20 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 20 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 20 Oct 2025Source
  • Withdrawal Update Form 3Form 3 Q2.pdf · uploaded 20 Oct 2025Source
  • Withdrawal Update Form 3Form 3 Q2.pdf · uploaded 20 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Q2.pdf · uploaded 21 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 21 Oct 2025Source
  • Withdrawal Update Form 3Form 3 Q2.pdf · uploaded 21 Oct 2025Source
  • Withdrawal Update Form 1Form 1Q2.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 1Form 1Q2.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 3Form 3Q2.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 3Form 3Q2.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 1Form 1Q2.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 1Form 1Q2.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 1Form 1Q2.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 3Form 3Q2.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 3Form 3Q2.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 3Form 3Q2.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 1Form 1Q2.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 3Form 3Q2.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 1Form 1Q2.pdf · uploaded 7 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Q2.pdf · uploaded 7 Nov 2025Source
  • Withdrawal Update Form 3Form 3Q2.pdf · uploaded 7 Nov 2025Source
  • Form 5 (FY 2024-2025)FORM 5.pdf · uploaded 7 Nov 2025Source
  • Withdrawal Update Form 1FORM 1Q3.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 1FORM 1Q3.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 2FORM 2Q3.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 2FORM 2Q3.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 3FORM 3Q3.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 3FORM 3Q3.pdf · uploaded 16 Jan 2026Source
  • Withdrawal Update Form 1Form 1Q4.pdf · uploaded 4 Apr 2026Source
  • Withdrawal Update Form 2Form 2Q4.pdf · uploaded 4 Apr 2026Source
  • Withdrawal Update Form 3Form 3Q4.pdf · uploaded 4 Apr 2026Source
  • Withdrawal Update Form 1Form 1 Q126.pdf · uploaded 10 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Q126.pdf · uploaded 10 Jul 2026Source
  • Withdrawal Update Form 3Form 3 Q126.pdf · uploaded 10 Jul 2026Source
  • Form 2A (FY 2024-2025)Form 2(A) TS 2025.pdf · uploaded 21 Aug 2026Source
  • Form 2A (FY 2025-2026)Form A(A) TS 2026.pdf · uploaded 21 Aug 2026Source
  • Form 5 (FY 2025-2026)Form 5 - 2025-26 TS.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 1Form 1 Q226.pdf · uploaded 13 Oct 2026Source
  • Withdrawal Update Form 2Form 2 Q226.pdf · uploaded 13 Oct 2026Source
  • Withdrawal Update Form 3Form 3 Q126.pdf · uploaded 13 Oct 2026Source

Technical

  • Documentfloor plan_10-end.pdf · uploaded 8 Oct 2024Source
  • Documentfloor plan_9-9.pdf · uploaded 8 Oct 2024Source
  • Documentfloor plan_8-8.pdf · uploaded 8 Oct 2024Source
  • Documentfloor plan_7-7.pdf · uploaded 8 Oct 2024Source
  • Documentfloor plan_6-6.pdf · uploaded 8 Oct 2024Source
  • Documentfloor plan_5-5.pdf · uploaded 8 Oct 2024Source
  • Documentfloor plan_4-4.pdf · uploaded 8 Oct 2024Source
  • Documentfloor plan_3-3.pdf · uploaded 8 Oct 2024Source
  • Documentfloor plan_2-2.pdf · uploaded 8 Oct 2024Source
  • Documentfloor plan_1-1.pdf · uploaded 8 Oct 2024Source
  • Other – TechnicalAnnexure A.pdf · uploaded 19 Oct 2024Source
  • DocumentRevised Plan-1.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-2.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-3.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-4.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-5.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-6.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-7.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-8.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-9.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-10.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-11.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-12.pdf · uploaded 12 Mar 2025Source
  • DocumentRevised Plan-13.pdf · uploaded 12 Mar 2025Source
  • OthersEC_Supper Square feet infraventures llp.pdf · uploaded 10 Dec 2025Source

Technical (Architect)

  • DocumentFORM 1 TS.pdf · uploaded 20 Jan 2025Source
  • DocumentFORM 1 TS.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 1 Q226.pdf · uploaded 13 Oct 2026Source

Technical (Engineer)

  • DocumentFORM 2 TS.pdf · uploaded 20 Jan 2025Source
  • DocumentFORM 2 TS.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 2 Q226.pdf · uploaded 13 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel B17, PLOT NO A11

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Office space, Rehab office space, Shop304 units in all
Address
Plot No A-11 And B-17, Plot No A-11 & B-17, MIDC, Wagle Industrial Area, Lbs Road, Wagle Estate, Thane West, 400604, Wagle Estate ThanePIN 400604
Village
Thane (M Corp.), Thane taluka
Land area for this project
5,557 sq m (59,815 sq ft)
Permissible built-up area
40,010 sq m (4,30,668 sq ft)
Sanctioned built-up area
39,969 sq m (4,30,222 sq ft)
Recreational open space
0 sq m (0 sq ft)
Designated bank account
220
Developed in phases
No

Survey, CTS, gat or plot numbers

B17PLOT NO A11

Land as published on MahaRERA's project page

PLOT NO A-11 AND B-17

Boundaries

North
High Tension Line
South
Lbs Road
East
PLOT No A-12-1 AND AM 14
West
Plot No Am-22 And Plot No Am 2-4

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking304 units

0 of 304 units booked (0%), as the promoter reported to MahaRERA

Office space · 251 unitsRehab office space · 45 unitsShop · 8 units
TypeCarpet areaUnitsBooked
Office space37.72 sq m · 406 sq ft380
Office space44.12 sq m · 475 sq ft60
Office space45.74 sq m · 492 sq ft10
Office space45.75 sq m · 492 sq ft20
Office space47.96 sq m · 516 sq ft320
Office space48.1 sq m · 518 sq ft140
Office space54.21 sq m · 584 sq ft10
Office space55.78 sq m · 600 sq ft10
Show all 62 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Office space56.18 sq m · 605 sq ft20
Office space58.98 sq m · 635 sq ft10
Office space60.99 sq m · 656 sq ft30
Office space61.7 sq m · 664 sq ft30
Office space63.22 sq m · 680 sq ft50
Office space70.24 sq m · 756 sq ft150
Office space80.71 sq m · 869 sq ft80
Office space82.52 sq m · 888 sq ft10
Office space83.15 sq m · 895 sq ft150
Office space83.37 sq m · 897 sq ft10
Office space84.67 sq m · 911 sq ft10
Office space85.48 sq m · 920 sq ft140
Office space91.57 sq m · 986 sq ft110
Office space97.51 sq m · 1,050 sq ft20
Office space100.56 sq m · 1,082 sq ft20
Office space100.83 sq m · 1,085 sq ft450
Office space102.66 sq m · 1,105 sq ft10
Office space107.29 sq m · 1,155 sq ft20
Office space113.01 sq m · 1,216 sq ft30
Office space125.13 sq m · 1,347 sq ft110
Office space134.14 sq m · 1,444 sq ft30
Office space145.51 sq m · 1,566 sq ft10
Office space157.64 sq m · 1,697 sq ft10
Office space159.88 sq m · 1,721 sq ft20
Office space166.51 sq m · 1,792 sq ft10
Office space175.74 sq m · 1,892 sq ft10
Office space379.39 sq m · 4,084 sq ft10
Rehab office space52.35 sq m · 563 sq ft10
Rehab office space52.48 sq m · 565 sq ft20
Rehab office space55.78 sq m · 600 sq ft10
Rehab office space56.13 sq m · 604 sq ft40
Rehab office space56.18 sq m · 605 sq ft30
Rehab office space84.59 sq m · 911 sq ft20
Rehab office space84.67 sq m · 911 sq ft30
Rehab office space87.06 sq m · 937 sq ft10
Rehab office space110.38 sq m · 1,188 sq ft10
Rehab office space110.41 sq m · 1,188 sq ft10
Rehab office space110.98 sq m · 1,195 sq ft10
Rehab office space111.59 sq m · 1,201 sq ft20
Rehab office space111.7 sq m · 1,202 sq ft30
Rehab office space111.73 sq m · 1,203 sq ft20
Rehab office space112.63 sq m · 1,212 sq ft30
Rehab office space112.9 sq m · 1,215 sq ft120
Rehab office space113.49 sq m · 1,222 sq ft10
Rehab office space113.55 sq m · 1,222 sq ft10
Rehab office space175.78 sq m · 1,892 sq ft10
Shop267.97 sq m · 2,884 sq ft10
Shop342.47 sq m · 3,686 sq ft10
Shop348.4 sq m · 3,750 sq ft10
Shop348.42 sq m · 3,750 sq ft10
Shop354.67 sq m · 3,818 sq ft10
Shop364 sq m · 3,918 sq ft10
Shop381.01 sq m · 4,101 sq ft10
Shop541.07 sq m · 5,824 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals2

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDhruv D Patel—
EngineerKalpesh Prakash Tribhuvan—

Source: MahaRERA project page. Contact details are not shown.