Godrej Emerald Thane
Deedo IDDP-THN-6NQYMahaRERA shows it completed; no MahaRERA orders on record; 93% of its units are booked.
Ghodbunder, Thane 400615 · by Godrej Greenview Housing Private Limited
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 5 Jul 2017, completion promised 30 Jun 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
7 buildings
Open a building to see every flat, floor by floor.
- Building Number 327 floors · 157 units100% booked
- Building Number 427 floors · 157 units97% booked
- Building Number 527 floors · 157 units100% booked
- Building Number 627 floors · 157 units100% booked
- Building Number 727 floors · 157 units100% booked
- Vista - Building Number 1 - Juniper31 floors · 172 units84% booked
- Vista - Building Number 2 - Fern31 floors · 240 units80% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700000120
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700000120 | 5 Jul 2017 | 30 Jun 2026 | 30 Jun 2026 | Godrej Greenview Housing Private Limited | Project page |
Documents338
2 documents held by Deedo, 336 filings listed on MahaRERA's project page
Show all 338 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportTitle Certificate.pdf · uploaded 28 Jun 2017Source
- 1 Details of encumbrancesGGHPL - Non encumbrance Final.pdf · uploaded 28 Jun 2017Source
- 1 Copy of Layout Approval (in case of layout)DP Layout - Low res - Revised.pdf · uploaded 28 Jun 2017Source
- 2 Copy of Layout Approval (in case of layout)CFO Layout - Low res.pdf · uploaded 28 Jun 2017Source
- 3 Copy of Layout Approval (in case of layout)MOU.pdf · uploaded 28 Jun 2017Source
- 1 Building Plan Approval (IOD)DP - Page 1.pdf · uploaded 28 Jun 2017Source
- 2 Building Plan Approval (IOD)DP - Page 2.pdf · uploaded 28 Jun 2017Source
- 3 Building Plan Approval (IOD)DP - Page 3.pdf · uploaded 28 Jun 2017Source
- 1 Declaration in FORM BForm B - GGHPL.pdf · uploaded 28 Jun 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Godrej Emerald - Architect Cert.pdf · uploaded 28 Jun 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Godrej Emerald - Engineer Cert.pdf · uploaded 28 Jun 2017Source
- 1 Certificates of CA (Form 3)CA Certificate Full 1.pdf · uploaded 28 Jun 2017Source
- 2 Certificates of CA (Form 3)CA Certificate Full 2.pdf · uploaded 28 Jun 2017Source
- 3 Certificates of CA (Form 3)CA Certificate Full 3.pdf · uploaded 28 Jun 2017Source
- 4 Certificates of CA (Form 3)CA Certificate Full 4.pdf · uploaded 28 Jun 2017Source
- 1 Proforma of Allotment letterAFS Allotment combined v3.pdf · uploaded 28 Jun 2017Source
- 4 Copy of Layout Approval (in case of layout)MOU_196.pdf · uploaded 6 Oct 2017Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Godrej Emerald - Arch Cert July 2017.pdf · uploaded 6 Oct 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentCC clear copy.pdf · uploaded 1 Dec 2017Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Certificate_Upto 31st Dec 17 .pdf · uploaded 3 Jan 2018Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate for upload.pdf · uploaded 3 Apr 2018Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Certificate Feb18.pdf · uploaded 3 Apr 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentAmended DP CC.pdf · uploaded 18 Sep 2018Source
- 1 Certificates of CA (Form 5)Form V - March 31, 2018.pdf · uploaded 30 Sep 2018Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Society formation.pdf · uploaded 9 Jun 2019Source
- 2 Certificates of CA (Form 5)Signed Form V - Emerald - Upload.pdf · uploaded 30 Sep 2019Source
- 3 Certificates of CA (Form 5)Emerald Final set Mar-20.pdf · uploaded 30 Sep 2020Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Emerald - Form 2A.pdf · uploaded 12 Jul 2021Source
- 1 Declaration about Commencement CertificateEmerald - CC Declaration 14072021 upload.pdf · uploaded 23 Jul 2021Source
- 1 Disclosure of sold/ booked inventoryEmerald - Inventory status 14072021 Part1.pdf · uploaded 23 Jul 2021Source
- 2 Disclosure of sold/ booked inventoryEmerald - Inventory status 14072021 Part2.pdf · uploaded 23 Jul 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Signed Form V - Emerald - Upload.pdf · uploaded 28 Jul 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Emerald Final set Mar-20.pdf · uploaded 28 Jul 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 FY2020-21_compressed.pdf · uploaded 29 Sep 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Godrej_Emerald_Form_5.pdf · uploaded 30 Sep 2022Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)Emerald Society Registration Certificate.pdf · uploaded 20 Dec 2022Source
- 5 Copy of Layout Approval (in case of layout)Jan22 Layout.pdf · uploaded 7 Jun 2023Source
- 4 Building Plan Approval (IOD)Amended DP-CC Emerald.pdf · uploaded 7 Jun 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentAmended DP-CC Emerald.pdf · uploaded 7 Jun 2023Source
- 1 Proforma of Agreement for saleGodrej Emerald Tower 1 2 01062023.pdf · uploaded 7 Jun 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentEmerald OC certificate.pdf · uploaded 7 Jun 2023Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Cert Emerald RERA June 2023_upload.pdf · uploaded 21 Sep 2023Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Cert EMERALD_CERTIFICATE JUNE' 23-Final_upload.pdf · uploaded 21 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5_Godrej emerald Thane_FY 2022-23.pdf · uploaded 21 Sep 2023Source
- 5 Certificates of CA (Form 3)CA certificate_Jun23_compressed (1).pdf · uploaded 5 Oct 2023Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Cert_Sep23_upload.pdf · uploaded 27 Oct 2023Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Cert_Sep23_upload.pdf · uploaded 27 Oct 2023Source
- 3 Disclosure of sold/ booked inventoryEmerald_Inventory Disclosure_Sep23_compressed_upload.pdf · uploaded 27 Oct 2023Source
- 6 Certificates of CA (Form 3)CA Cert_Sep23_compressed_upload.pdf · uploaded 27 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)RERA -Q-4_Mar 2020 end.pdf · uploaded 21 Dec 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)RERA -Q-3_Dec 2019 end.pdf · uploaded 21 Dec 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)RERA -Q-2_Sep 2019 end.pdf · uploaded 21 Dec 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)RERA -Q-1_June 2019 end.pdf · uploaded 21 Dec 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)RERA -Q-1_June 2021 end.pdf · uploaded 21 Dec 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)RERA -Q-2_Sep 2021 end.pdf · uploaded 21 Dec 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A FY23.pdf · uploaded 21 Dec 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)RERA -Q-1_June 2020 end.pdf · uploaded 12 Jan 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)RERA -Q-2_Sep 2020_upload.pdf · uploaded 12 Jan 2024Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)RERA -Q-3_Dec 2020_upload.pdf · uploaded 12 Jan 2024Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)RERA -Q-4_Mar 2021_upload.pdf · uploaded 12 Jan 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Annual 2A _ 2021-2022_upload.pdf · uploaded 12 Jan 2024Source
- 4 Commencement Certificates / NA Order for plotted developmentAmended DP CC.pdf · uploaded 14 Jan 2024Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2017 09 Sep 17.pdf · uploaded 14 Jan 2024Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2017 12 Dec 17.pdf · uploaded 14 Jan 2024Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2018 03 Mar 18.pdf · uploaded 14 Jan 2024Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2018 06 Jun 18.pdf · uploaded 14 Jan 2024Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2018 09 Sep 18.pdf · uploaded 14 Jan 2024Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2018 12 Dec 18.pdf · uploaded 14 Jan 2024Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2019 03 Mar 19.pdf · uploaded 14 Jan 2024Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2019 06 Jun 19.pdf · uploaded 14 Jan 2024Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2019 09 Sep 19.pdf · uploaded 14 Jan 2024Source
- 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2019 12 Dec 19.pdf · uploaded 14 Jan 2024Source
- 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2020 03 Mar 20.pdf · uploaded 14 Jan 2024Source
- 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2020 06 Jun 20.pdf · uploaded 14 Jan 2024Source
- 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2020 09 Sep 20.pdf · uploaded 14 Jan 2024Source
- 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2020 12 Dec 20.pdf · uploaded 14 Jan 2024Source
- 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2021 03 Mar 21.pdf · uploaded 14 Jan 2024Source
- 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2021 06 Jun 21.pdf · uploaded 14 Jan 2024Source
- 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2021 09 Sep 21.pdf · uploaded 14 Jan 2024Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2017 09 Sep 17.pdf · uploaded 14 Jan 2024Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2018 03 Mar 18_upload.pdf · uploaded 14 Jan 2024Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2018 06 Jun 18.pdf · uploaded 14 Jan 2024Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2018 09 Sep 18.pdf · uploaded 14 Jan 2024Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2018 12 Dec 18_upload.PDF · uploaded 14 Jan 2024Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2019 03 Mar 19.pdf · uploaded 14 Jan 2024Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2019 07 Jul 19.pdf · uploaded 14 Jan 2024Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2021 06 Jun 21.pdf · uploaded 14 Jan 2024Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2021 09 Sep 21.pdf · uploaded 14 Jan 2024Source
- 7 Certificates of CA (Form 3)2017 07 Jul 17_compressed.pdf · uploaded 14 Jan 2024Source
- 8 Certificates of CA (Form 3)2017 09 Sep 17_compressed.pdf · uploaded 14 Jan 2024Source
- 9 Certificates of CA (Form 3)2017 12 Dec 17.pdf · uploaded 14 Jan 2024Source
- 10 Certificates of CA (Form 3)2018 03 Mar 18_compressed_upload.pdf · uploaded 14 Jan 2024Source
- 11 Certificates of CA (Form 3)2018 06 Jun 18_compressed_upload.pdf · uploaded 14 Jan 2024Source
- 12 Certificates of CA (Form 3)2018 09 Sep 18.pdf · uploaded 14 Jan 2024Source
- 13 Certificates of CA (Form 3)2018 12 Dec 18.pdf · uploaded 14 Jan 2024Source
- 14 Certificates of CA (Form 3)2019 03 Mar 19.pdf · uploaded 14 Jan 2024Source
- 15 Certificates of CA (Form 3)2019 06 Jun 19.pdf · uploaded 14 Jan 2024Source
- 16 Certificates of CA (Form 3)2019 12 Dec 19.pdf · uploaded 14 Jan 2024Source
- 17 Certificates of CA (Form 3)2020 06 Jun 20_inc.pdf · uploaded 14 Jan 2024Source
- 18 Certificates of CA (Form 3)2020 09 Sep 20_inc.pdf · uploaded 14 Jan 2024Source
- 19 Certificates of CA (Form 3)2020 12 Dec 20_inc.pdf · uploaded 14 Jan 2024Source
- 20 Certificates of CA (Form 3)2021 03 Mar 21_inc.pdf · uploaded 14 Jan 2024Source
- 21 Certificates of CA (Form 3)2021 06 Jun 21_inc_compressed (1).pdf · uploaded 14 Jan 2024Source
- 22 Certificates of CA (Form 3)2021 09 Sep 21_inc.pdf · uploaded 14 Jan 2024Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2020 03 Mar 20.pdf · uploaded 15 Jan 2024Source
- 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2020 06 Jun 20.pdf · uploaded 15 Jan 2024Source
- 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2020 09 Sep 20.pdf · uploaded 15 Jan 2024Source
- 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2020 12 Dec 20.PDF · uploaded 15 Jan 2024Source
- 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2021 03 Mar 21.PDF · uploaded 15 Jan 2024Source
- 2 Declaration about Commencement CertificateCC declaration_Emerald_till 27th_Jan22_scan.pdf · uploaded 17 Jan 2024Source
- 3 Declaration about Commencement CertificateCC declaration_29-30_upload.pdf · uploaded 17 Jan 2024Source
- 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2021 12 Dec 21_compressed.pdf · uploaded 17 Jan 2024Source
- 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2022 03 Mar 22_compressed.pdf · uploaded 17 Jan 2024Source
- 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2022 06 Jun 22_compressed.pdf · uploaded 17 Jan 2024Source
- 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2022 09 Sep 22_compressed.pdf · uploaded 17 Jan 2024Source
- 27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2022 12 Dec 22_compressed.pdf · uploaded 17 Jan 2024Source
- 28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2023 03 Mar 23_compressed.pdf · uploaded 17 Jan 2024Source
- 29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Cert Dec 23_signed.pdf · uploaded 17 Jan 2024Source
- 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2021 12 Dec 21.pdf · uploaded 17 Jan 2024Source
- 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2022 03 Mar 22_scan.pdf · uploaded 17 Jan 2024Source
- 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2022 06 Jun 22_scan.pdf · uploaded 17 Jan 2024Source
- 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2022 09 Sep 22_scan.pdf · uploaded 17 Jan 2024Source
- 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2022 12 Dec 22_scan.pdf · uploaded 17 Jan 2024Source
- 25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2023 03 Mar 23_scan.pdf · uploaded 17 Jan 2024Source
- 26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2019 08 Aug 19.pdf · uploaded 17 Jan 2024Source
- 27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2020 01 Jan 20.pdf · uploaded 17 Jan 2024Source
- 28 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Cert Dec 23_signed.pdf · uploaded 17 Jan 2024Source
- 23 Certificates of CA (Form 3)2021 12 Dec 21_compressed.pdf · uploaded 17 Jan 2024Source
- 24 Certificates of CA (Form 3)2022 03 Mar 22_signed_compressed.pdf · uploaded 17 Jan 2024Source
- 25 Certificates of CA (Form 3)2022 06 Jun 22_signed_compressed.pdf · uploaded 17 Jan 2024Source
- 26 Certificates of CA (Form 3)2022 09 Sep 22_signed_compressed.pdf · uploaded 17 Jan 2024Source
- 27 Certificates of CA (Form 3)2022 12 Dec 22_signed_compressed.pdf · uploaded 17 Jan 2024Source
- 28 Certificates of CA (Form 3)2023 03 Mar 23_signed_compressed.pdf · uploaded 17 Jan 2024Source
- 29 Certificates of CA (Form 3)2023 06 Jun 23_signed_compressed.pdf · uploaded 17 Jan 2024Source
- 30 Certificates of CA (Form 3)2020 03 Mar 20.pdf · uploaded 17 Jan 2024Source
- 31 Certificates of CA (Form 3)2019 10 Oct 19.pdf · uploaded 17 Jan 2024Source
- 32 Certificates of CA (Form 3)2019 09 Sep 19_compressed_upload.pdf · uploaded 17 Jan 2024Source
- 33 Certificates of CA (Form 3)CA Cert Dec 23_compressed.pdf · uploaded 17 Jan 2024Source
- 4 Disclosure of sold/ booked inventorySold Inventory Disclosure_upload.pdf · uploaded 23 Jan 2024Source
- 6 Copy of Layout Approval (in case of layout)MYSCAN_20220303_0003.PDF · uploaded 21 Feb 2024Source
- 7 Copy of Layout Approval (in case of layout)MYSCAN_20220303_0004.PDF · uploaded 21 Feb 2024Source
- 5 Building Plan Approval (IOD)MYSCAN_20220303_0002.PDF · uploaded 21 Feb 2024Source
- 6 Building Plan Approval (IOD)MYSCAN_20220303_0003.PDF · uploaded 21 Feb 2024Source
- 7 Building Plan Approval (IOD)MYSCAN_20220303_0004.PDF · uploaded 21 Feb 2024Source
- 8 Building Plan Approval (IOD)MYSCAN_20220303_0005.PDF · uploaded 21 Feb 2024Source
- 9 Building Plan Approval (IOD)MYSCAN_20220303_0006.PDF · uploaded 21 Feb 2024Source
- 10 Building Plan Approval (IOD)MYSCAN_20220303_0007_compressed.pdf · uploaded 21 Feb 2024Source
- 11 Building Plan Approval (IOD)MYSCAN_20220303_0008.PDF · uploaded 21 Feb 2024Source
- 12 Building Plan Approval (IOD)MYSCAN_20220303_0009_compressed.pdf · uploaded 21 Feb 2024Source
- 13 Building Plan Approval (IOD)MYSCAN_20220303_0010_compressed.pdf · uploaded 21 Feb 2024Source
- 14 Building Plan Approval (IOD)MYSCAN_20220303_0011_compressed.pdf · uploaded 21 Feb 2024Source
- 15 Building Plan Approval (IOD)MYSCAN_20220303_0012_compressed.pdf · uploaded 21 Feb 2024Source
- 16 Building Plan Approval (IOD)MYSCAN_20220303_0013_compressed.pdf · uploaded 21 Feb 2024Source
- 17 Building Plan Approval (IOD)MYSCAN_20220303_0014_compressed.pdf · uploaded 21 Feb 2024Source
- 18 Building Plan Approval (IOD)MYSCAN_20220303_0015_compressed.pdf · uploaded 21 Feb 2024Source
- 19 Building Plan Approval (IOD)MYSCAN_20220303_0016_compressed.pdf · uploaded 21 Feb 2024Source
- 20 Building Plan Approval (IOD)MYSCAN_20220303_0017_compressed.pdf · uploaded 21 Feb 2024Source
- 21 Building Plan Approval (IOD)MYSCAN_20220303_0018_compressed.pdf · uploaded 21 Feb 2024Source
- 22 Building Plan Approval (IOD)MYSCAN_20220303_0019_compressed.pdf · uploaded 21 Feb 2024Source
- 23 Building Plan Approval (IOD)MYSCAN_20220303_0020.PDF · uploaded 21 Feb 2024Source
- 24 Building Plan Approval (IOD)MYSCAN_20220303_0021_compressed.pdf · uploaded 21 Feb 2024Source
- 25 Building Plan Approval (IOD)MYSCAN_20220303_0022_compressed.pdf · uploaded 21 Feb 2024Source
- 26 Building Plan Approval (IOD)MYSCAN_20220303_0023.PDF · uploaded 21 Feb 2024Source
- 27 Building Plan Approval (IOD)MYSCAN_20220303_0024.PDF · uploaded 21 Feb 2024Source
- 28 Building Plan Approval (IOD)1 Sheet-1_compressed.pdf · uploaded 9 Mar 2024Source
- 29 Building Plan Approval (IOD)2 HPSC0101_compressed.pdf · uploaded 9 Mar 2024Source
- 30 Building Plan Approval (IOD)3 HPSC0102_compressed.pdf · uploaded 9 Mar 2024Source
- 31 Building Plan Approval (IOD)4 HPSC0103_compressed (1).pdf · uploaded 9 Mar 2024Source
- 32 Building Plan Approval (IOD)5 HPSC0105_compressed.pdf · uploaded 9 Mar 2024Source
- 33 Building Plan Approval (IOD)6 HPSC0106_compressed.pdf · uploaded 9 Mar 2024Source
- 1 Home Buyer /Allottee Grievance Redressal CellHome Buyer Allottee Grievance Redressal Cell Godrej Emerald.pdf · uploaded 26 Mar 2024Source
- 30 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Certificate March 2024_signed.pdf · uploaded 19 Apr 2024Source
- 29 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Certificate March 2024_signed.pdf · uploaded 19 Apr 2024Source
- 5 Disclosure of sold/ booked inventorySold inventory disclosure_signed.pdf · uploaded 25 Apr 2024Source
- 34 Certificates of CA (Form 3)CA certificate_signed_compressed.pdf · uploaded 25 Apr 2024Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development11 CLUB HOUSE OC 26-04-2024.pdf · uploaded 29 Apr 2024Source
- 1 Other – Legal17042024 Non Encumbrance Certificate_upload.pdf · uploaded 2 May 2024Source
- 2 Details of encumbrancesEncumbarance Details Emerald.pdf · uploaded 14 May 2024Source
- 1 Other – FinanceEncumbarance Details Emerald.pdf · uploaded 14 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A_Emerald_FY24_signed.pdf · uploaded 17 Jun 2024Source
- 31 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Cert_Jun24_signed.pdf · uploaded 15 Jul 2024Source
- 30 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Cert_full fig_Jun24_signed.pdf · uploaded 19 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryEmerald_inventory disc_signed.pdf · uploaded 19 Jul 2024Source
- 35 Certificates of CA (Form 3)CA_Emerald_Jun24_signed_compressed.pdf · uploaded 19 Jul 2024Source
- Form 5 (FY 2023-2024)Form 5_Emerald_signed.pdf · uploaded 30 Sep 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Godrej Emerald Form 5 FY 2023 24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Godrej Emerald Form 5 FY 2023 24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Godrej Emerald Form 5 FY 2023 24.pdf · uploaded 6 Oct 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- 1 Certificates of CA (Form 3)Form 3_Emerald_Sep 24_signed_comp.pdf · uploaded 26 Oct 2024Source
- 1 Disclosure of sold/ booked inventorySold Inventory Disclosure Emerald_signed.pdf · uploaded 26 Oct 2024Source
- 1 Certificates of CA (Form 3)Form 3_Emerald_Sep 24_signed_comp.pdf · uploaded 26 Oct 2024Source
- 1 Disclosure of sold/ booked inventorySold Inventory Disclosure Emerald_signed.pdf · uploaded 26 Oct 2024Source
- 2 Certificates of CA (Form 3)Form 3_Emerald_Sep 24_signed_comp.pdf · uploaded 26 Oct 2024Source
- 2 Disclosure of sold/ booked inventorySold Inventory Disclosure Emerald_signed.pdf · uploaded 26 Oct 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- 1 Certificates of CA (Form 3)Form 3 Dec 24_signed_compressed.pdf · uploaded 22 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Inventory Disclosure_signed_upload.pdf · uploaded 22 Jan 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- 1 Certificates of CA (Form 3)Form 3 Dec 24_signed_compressed.pdf · uploaded 22 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Inventory Disclosure_signed_upload.pdf · uploaded 22 Jan 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- 1 Certificates of CA (Form 3)Form 3 Dec 24_signed_compressed.pdf · uploaded 22 Jan 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Inventory Disclosure_signed_upload.pdf · uploaded 22 Jan 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Emerald Arch certificate Mar 25.pdf · uploaded 17 Apr 2025Source
- 1 Certificates of CA (Form 3)Emerald CA Certificate Mar 25.pdf · uploaded 17 Apr 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Emerald Engineer's certificate Mar 25.pdf · uploaded 17 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryEmerald Sold inventory Mar 25.pdf · uploaded 17 Apr 2025Source
- 1 Other – TechnicalEXT RERA Compliance - Godrej Emerald.pdf · uploaded 17 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Emerald Quality certificate Mar 25.pdf · uploaded 17 Apr 2025Source
- Form 2A (FY 2024-2025)Emerald Quality Assurance Certificate FY 25_signed and stamped.pdf · uploaded 17 Jun 2025Source
- Form 1Emerald Arch certificate Jun 25.pdf · uploaded 16 Jul 2025Source
- Form 2Emerald Engineers Certificate Jun 25.pdf · uploaded 16 Jul 2025Source
- Form 3Emerald CA certificate- Revised Format June-25.pdf · uploaded 16 Jul 2025Source
- Disclosure of Sold and Booked InventoryEmerald disclosure of sold inventory Jun 25.pdf · uploaded 16 Jul 2025Source
- Form 5 (FY 2024-2025)GGHPL Final Deliverables upload.pdf · uploaded 28 Aug 2025Source
- Withdrawal Update Form 1Emerald Arch Cer Sept 25.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1Emerald Arch Cer Sept 25.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2Emerald EC Sept 25.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2Emerald EC Sept 25.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3Emerald CA Cer Sept 25.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3Emerald CA Cer Sept 25.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1Emerlad Arch_compressed.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Emerald EC-compressed.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Emerald CA-compressed (1).pdf · uploaded 20 Jan 2026Source
- Occupational CertificateEmerald OC T1 T2 and T3 to T7.pdf · uploaded 2 Mar 2026Source
- Form 2A (FY 2025-2026)Form 2A Emerald.pdf · uploaded 16 Jun 2026Source
- Form 5 (FY 2025-2026)Form 5 signed - Emerald.pdf · uploaded 16 Sep 2026Source
Technical
- DocumentDP Layout - Low res - Revised.pdf · uploaded 28 Jun 2017Source
- DocumentCFO Layout - Low res.pdf · uploaded 28 Jun 2017Source
- DocumentMOU.pdf · uploaded 28 Jun 2017Source
- DocumentDP - Page 1.pdf · uploaded 28 Jun 2017Source
- DocumentDP - Page 2.pdf · uploaded 28 Jun 2017Source
- DocumentDP - Page 3.pdf · uploaded 28 Jun 2017Source
- DocumentMOU_196.pdf · uploaded 6 Oct 2017Source
- DocumentJan22 Layout.pdf · uploaded 7 Jun 2023Source
- DocumentAmended DP-CC Emerald.pdf · uploaded 7 Jun 2023Source
- DocumentMYSCAN_20220303_0003.PDF · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0004.PDF · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0002.PDF · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0003.PDF · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0004.PDF · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0005.PDF · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0006.PDF · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0007_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0008.PDF · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0009_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0010_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0011_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0012_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0013_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0014_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0015_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0016_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0017_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0018_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0019_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0020.PDF · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0021_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0022_compressed.pdf · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0023.PDF · uploaded 21 Feb 2024Source
- DocumentMYSCAN_20220303_0024.PDF · uploaded 21 Feb 2024Source
- Document1 Sheet-1_compressed.pdf · uploaded 9 Mar 2024Source
- Document2 HPSC0101_compressed.pdf · uploaded 9 Mar 2024Source
- Document3 HPSC0102_compressed.pdf · uploaded 9 Mar 2024Source
- Document4 HPSC0103_compressed (1).pdf · uploaded 9 Mar 2024Source
- Document5 HPSC0105_compressed.pdf · uploaded 9 Mar 2024Source
- Document6 HPSC0106_compressed.pdf · uploaded 9 Mar 2024Source
- Other – TechnicalEXT RERA Compliance - Godrej Emerald.pdf · uploaded 17 Apr 2025Source
- OthersEmerald OC T1 T2 18 Jun 25.pdf · uploaded 19 Sep 2025Source
- Document17 Plans-pages-6-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-1-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-2-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-3-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-4-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-5-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-7-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-8-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-9-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-10-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-11-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-12-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-13-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-14-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-15-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-16-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-17-compressed.pdf · uploaded 26 Dec 2025Source
- Document17 Plans-pages-1-compressed.pdf · uploaded 2 Feb 2026Source
- DocumentEmerald updated CC.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-2-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-3-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-4-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-5-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-6-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-7-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-8-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-9-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-10-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-11-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-12-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-13-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-14-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-15-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-16-compressed.pdf · uploaded 2 Feb 2026Source
- Document17 Plans-pages-17-compressed.pdf · uploaded 2 Feb 2026Source
- DocumentLayout - Highlighted T1 and T2 with car parking.pdf · uploaded 18 Feb 2026Source
Technical (Architect)
- DocumentForm 1_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- DocumentForm 1_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- DocumentForm 1_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- DocumentForm 1 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- DocumentForm 1 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- DocumentEmerald Arch certificate Mar 25.pdf · uploaded 17 Apr 2025Source
- DocumentEmerlad Arch_compressed.pdf · uploaded 20 Jan 2026Source
Technical (Engineer)
- DocumentForm 2_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- DocumentForm 2_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- DocumentForm 2_Emerald_Sep 24_signed.pdf · uploaded 18 Oct 2024Source
- DocumentForm 2 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- DocumentForm 2 Dec 24_signed.pdf · uploaded 22 Jan 2025Source
- DocumentEmerald Engineer's certificate Mar 25.pdf · uploaded 17 Apr 2025Source
- DocumentEmerald EC-compressed.pdf · uploaded 20 Jan 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 2B, 2C
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1andhalfBHK, 2BHK, 3BHK1,197 units in all
- Address
- 91/1/1A 91/2A 102/1, 2B, 2C, 3Bpt 103/3Apt 103/4pt 103/5B/2 109/30/1Bpt 109/30/4A 109/33, 34 196, Ghodbunder Road, GhodbunderPIN 400615
- Village
- Thane (M Corp.), Thane taluka
- Location
- 19.28127, 72.95159
- Land area for this project
- 25,155 sq m (2,70,764 sq ft)
- Permissible built-up area
- 76,435 sq m (8,22,743 sq ft)
- Sanctioned built-up area
- 76,435 sq m (8,22,743 sq ft)
- Recreational open space
- 9,032 sq m (97,217 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
91/1/1A 91/2A 102/1,2B,2C,3Bpt 103/3Apt 103/4pt 103/5B/2 109/30/1Bpt 109/30/4A 109/33,34 196
Boundaries
- North
- S No 103 Hissa 3A
- South
- 20mt wide DP Road
- East
- S No 109 Hissa 35
- West
- 40mt wide DP Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking1,197 units
1,116 of 1,197 units booked (93%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building Number 3 | 1andhalfBHK | 43.05 sq m · 463 sq ft | 27 | 27 |
| Building Number 3 | 1andhalfBHK | 44.25 sq m · 476 sq ft | 130 | 130 |
| Building Number 4 | 1andhalfBHK | 45.46 sq m · 489 sq ft | 54 | 54 |
| Building Number 4 | 2BHK | 57.68 sq m · 621 sq ft | 27 | 23 |
| Building Number 4 | 2BHK | 58.92 sq m · 634 sq ft | 49 | 49 |
| Building Number 4 | 2BHK | 59.84 sq m · 644 sq ft | 27 | 27 |
| Building Number 5 | 1andhalfBHK | 45.46 sq m · 489 sq ft | 54 | 54 |
| Building Number 5 | 2BHK | 57.68 sq m · 621 sq ft | 27 | 27 |
Show all 39 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building Number 5 | 2BHK | 58.92 sq m · 634 sq ft | 49 | 49 |
| Building Number 5 | 2BHK | 59.84 sq m · 644 sq ft | 27 | 27 |
| Building Number 6 | 1andhalfBHK | 43.64 sq m · 470 sq ft | 27 | 27 |
| Building Number 6 | 1andhalfBHK | 44.84 sq m · 483 sq ft | 27 | 27 |
| Building Number 6 | 1andhalfBHK | 44.88 sq m · 483 sq ft | 54 | 54 |
| Building Number 6 | 2BHK | 65.31 sq m · 703 sq ft | 49 | 49 |
| Building Number 7 | 3BHK | 76.78 sq m · 826 sq ft | 54 | 54 |
| Building Number 7 | 3BHK | 76.92 sq m · 828 sq ft | 22 | 22 |
| Building Number 7 | 3BHK | 77.89 sq m · 838 sq ft | 27 | 27 |
| Building Number 7 | 3BHK | 85.45 sq m · 920 sq ft | 54 | 54 |
| Vista - Building Number 1 - Juniper | 3BHK | 76.61 sq m · 825 sq ft | 3 | 0 |
| Vista - Building Number 1 - Juniper | 3BHK | 76.78 sq m · 826 sq ft | 56 | 43 |
| Vista - Building Number 1 - Juniper | 3BHK | 76.87 sq m · 827 sq ft | 3 | 0 |
| Vista - Building Number 1 - Juniper | 3BHK | 76.92 sq m · 828 sq ft | 22 | 20 |
| Vista - Building Number 1 - Juniper | 3BHK | 77.44 sq m · 834 sq ft | 28 | 24 |
| Vista - Building Number 1 - Juniper | 3BHK | 81.09 sq m · 873 sq ft | 1 | 1 |
| Vista - Building Number 1 - Juniper | 3BHK | 83 sq m · 893 sq ft | 1 | 1 |
| Vista - Building Number 1 - Juniper | 3BHK | 83.72 sq m · 901 sq ft | 26 | 26 |
| Vista - Building Number 1 - Juniper | 3BHK | 84.49 sq m · 909 sq ft | 1 | 1 |
| Vista - Building Number 1 - Juniper | 3BHK | 84.72 sq m · 912 sq ft | 2 | 2 |
| Vista - Building Number 1 - Juniper | 3BHK | 85.21 sq m · 917 sq ft | 3 | 0 |
| Vista - Building Number 1 - Juniper | 3BHK | 85.45 sq m · 920 sq ft | 26 | 26 |
| Vista - Building Number 2 - Fern | 2BHK | 59.6 sq m · 642 sq ft | 6 | 0 |
| Vista - Building Number 2 - Fern | 2BHK | 59.79 sq m · 644 sq ft | 54 | 46 |
| Vista - Building Number 2 - Fern | 2BHK | 60.75 sq m · 654 sq ft | 60 | 53 |
| Vista - Building Number 2 - Fern | 2BHK | 65.12 sq m · 701 sq ft | 30 | 24 |
| Vista - Building Number 2 - Fern | 2BHK | 65.35 sq m · 703 sq ft | 3 | 0 |
| Vista - Building Number 2 - Fern | 2BHK | 65.41 sq m · 704 sq ft | 24 | 17 |
| Vista - Building Number 2 - Fern | 2BHK | 66.57 sq m · 717 sq ft | 30 | 25 |
| Vista - Building Number 2 - Fern | 2BHK | 66.85 sq m · 720 sq ft | 30 | 26 |
| Vista - Building Number 2 - Fern | 2BHK | 66.93 sq m · 720 sq ft | 3 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Chartered accountant | Piyush Jain | — |
| Chartered accountant | Rupen Dilip Kumar Shah | — |
| Engineer | Rajendra Joshi | — |
Source: MahaRERA project page. Contact details are not shown.