Upper Thane-Casa Eden
Deedo IDDP-THN-CF3MMahaRERA shows it completed; no MahaRERA orders on record; 86% of its units are booked.
Surai, Thane 421302 · by Lodha Developers Limited · 93% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 28 Apr 2022, completion promised 30 Sep 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Wing A24 floors · 136 units87% booked
- Wing B24 floors · 137 units88% booked
- Wing C24 floors · 163 units85% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700034837
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700034837 | 28 Apr 2022 | 30 Sep 2026 | 30 Sep 2026 | Lodha Developers Limited | Project page |
Documents134
2 documents held by Deedo, 132 filings listed on MahaRERA's project page
Finance
- PAN CardMacrotech Developers Ltd PAN CARD.pdf · uploaded 30 Mar 2022Source
Legal
- Declaration Form BFORM B Parkville_compressed.pdf · uploaded 30 Mar 2022Source
- Legal Title reportLegal Title Report-Upper Thane-Parkville, Woodland, Tiara, Supremus-1-11.pdf · uploaded 9 Apr 2022Source
- Declaration Form BDevlopment Agreement_7328-2017 28 BY 14 - converted.pdf · uploaded 7 Jul 2026Source
- Declaration Form BDevlopment Agreement regd No7331-2017 27 BY 1 - converted.pdf · uploaded 7 Jul 2026Source
- Declaration Form BDevlopment Agreement Regd No 7337-2017 27 BY 1_compressed.pdf · uploaded 7 Jul 2026Source
Show all 134 documentsShow fewer documents
Legal
- Declaration Form BDevlopment Agreement Regd No 7335-2017 28 BY 14 _compressed.pdf · uploaded 7 Jul 2026Source
- Declaration Form BDevlopment Agreement Regd No 7339-2017 27 BY 1_compressed.pdf · uploaded 7 Jul 2026Source
- Declaration Form BD A regd No 1119-2021 55 BY 12B.pdf · uploaded 7 Jul 2026Source
- Declaration Form BD A regd No 2230-2018 55 by 12A.pdf · uploaded 7 Jul 2026Source
- Declaration Form BD A Regd No 2233-2018 28 BY 15.pdf · uploaded 7 Jul 2026Source
- Declaration Form BSatbara(56).pdf · uploaded 7 Jul 2026Source
- Declaration Form BAjitnath with 5 Companies.pdf · uploaded 7 Jul 2026Source
- Declaration Form BAnant Developers - Transferor 3.pdf · uploaded 7 Jul 2026Source
- Declaration Form BRERA Title Report_Upper Thane -Casa Eden.pdf · uploaded 4 Aug 2026Source
Migrated
- 1 PAN CardMacrotech Developers Ltd PAN CARD.pdf · uploaded 30 Mar 2022Source
- 1 Declaration in FORM BFORM B Parkville_compressed.pdf · uploaded 30 Mar 2022Source
- 1 Details of encumbrancesEncumb.pdf · uploaded 31 Mar 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 31 Mar 2022Source
- 1 Declaration about Commencement CertificateCC Decl.pdf · uploaded 31 Mar 2022Source
- 1 CERSAI detailsCersai.pdf · uploaded 31 Mar 2022Source
- 1 Proforma of Allotment letterSale Agreement and Allotment Letter.pdf · uploaded 31 Mar 2022Source
- 1 Copy of the legal title reportLegal Title Report-Upper Thane-Parkville, Woodland, Tiara, Supremus-1-11.pdf · uploaded 9 Apr 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)New Form 3- Parkville_compressed.pdf · uploaded 12 Apr 2022Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 22 Apr 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentUpload File - Final.pdf · uploaded 22 Apr 2022Source
- 1 Disclosure of sold/ booked inventoryCasa eden.pdf · uploaded 20 Mar 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same69 casa eden.pdf · uploaded 28 Apr 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Casa Eden - Form3.pdf · uploaded 22 Jul 2023Source
- 2 Disclosure of sold/ booked inventoryCasa Eden - March23.pdf · uploaded 24 Jul 2023Source
- 3 Disclosure of sold/ booked inventoryCasa Eden - June23.pdf · uploaded 24 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Upper Thane Casa Eden.pdf · uploaded 16 Oct 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Upper Thane Casa eden - Form1 - Sep23.pdf · uploaded 21 Nov 2023Source
- 4 Disclosure of sold/ booked inventoryUpper Thane Casa Eden - P51700034837 - Sep23.pdf · uploaded 13 Dec 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 - Upper Thane Casa Eden - P51700034837 - Dec23.pdf · uploaded 26 Feb 2024Source
- 5 Disclosure of sold/ booked inventorySold Unsold - Upper Thane Casa Eden - P51700034837 - Dec23.pdf · uploaded 27 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Upper Thane Casa Eden - P51700034837 - March 24.pdf · uploaded 15 May 2024Source
- 6 Disclosure of sold/ booked inventorySold Unsold - Upper Thane Casa Eden - P51700034837 - March 24.pdf · uploaded 16 May 2024Source
- 7 Disclosure of sold/ booked inventoryUpper Thane Casa Eden - P51700034837 - June24.pdf · uploaded 7 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Upper Thane Casa Eden - P51700034837 - June24.pdf · uploaded 10 Aug 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - Upper Thane Parkville-Renamed to Upper Thane Casa Eden - P51700034837.pdf · uploaded 17 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51700034837 - Upper Thane Casa Eden.pdf · uploaded 19 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)UT casa Eden.pdf · uploaded 4 Nov 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 2 3 - March 24.pdf · uploaded 22 Nov 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sep 24.pdf · uploaded 22 Nov 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 2 3 - June 24.pdf · uploaded 22 Nov 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 2 3 - Dec 23.pdf · uploaded 22 Nov 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 2 3 - Sep 23.pdf · uploaded 22 Nov 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 1 2 3 - June 23.pdf · uploaded 22 Nov 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 1 2 3 - Dec22.pdf · uploaded 22 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 1 2 3 - Sep22.pdf · uploaded 22 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 1 2 3 - June 22.pdf · uploaded 22 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 1 2 3 - Sep22.pdf · uploaded 22 Nov 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Sep 24.pdf · uploaded 22 Nov 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 3 - June 24.pdf · uploaded 22 Nov 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 3 - March 24.pdf · uploaded 22 Nov 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 3 - Dec 23.pdf · uploaded 22 Nov 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 3 - Sep 23.pdf · uploaded 22 Nov 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 1 2 3 - June 23.pdf · uploaded 22 Nov 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 1 2 - March 23.pdf · uploaded 22 Nov 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 1 2 3 - Dec22.pdf · uploaded 22 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 1 2 3 - June 22.pdf · uploaded 22 Nov 2024Source
- 2 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 22 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 22 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)UT Casa Eden.pdf · uploaded 24 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold-Unsold Upper Thane Casa Eden Dec 2024.pdf · uploaded 30 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3 Upper Thane Casa Eden Dec 2024.pdf · uploaded 25 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed Form 2 Upper Thane Casa Eden Dec 2024.pdf · uploaded 25 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (Upper Thane -Casa Eden ).pdf · uploaded 2 May 2025Source
- Form 1Form 1 -Upper Thane -Casa Eden -March 25.pdf · uploaded 6 Jun 2025Source
- Form 2Signed Form 2 Upper Thane Casa Eden March 2025.pdf · uploaded 6 Jun 2025Source
- Form 3Signed Form 3 Upper Thane Casa Eden March 2025.pdf · uploaded 6 Jun 2025Source
- Disclosure of Sold and Booked InventorySigned Sold-Unsold Upper Thane Casa Eden March 2025.pdf · uploaded 6 Jun 2025Source
- Self-declaration of Quarterly ProgressDeclaration.pdf · uploaded 6 Jun 2025Source
- Form 1Form-1 Upper Thane Casa Eden.pdf · uploaded 18 Jul 2025Source
- Form 2Form 2 - Casa Eden - June-25.pdf · uploaded 18 Jul 2025Source
- Form 3Form 3 - Casa Eden - June-25.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold 30 june 2025.pdf · uploaded 18 Jul 2025Source
- Form 2A (FY 2024-2025)Upper Thane Parkville-Renamed to Upper Thane Casa Eden - P51700034837 - Form 2A.pdf · uploaded 25 Jul 2025Source
- Form 5 (FY 2024-2025)Form 5 - P51700034837 - Upper Thane Casa Eden.pdf · uploaded 14 Oct 2025Source
- Withdrawal Update Form 1Upper Thane - Casa Eden .pdf · uploaded 31 Oct 2025Source
- Withdrawal Update Form 2Form 02 - Eden ABC - Sep 25 signed.pdf · uploaded 31 Oct 2025Source
- Withdrawal Update Form 3Form 03 - Eden ABC - Sep 25 signed.pdf · uploaded 31 Oct 2025Source
- Withdrawal Update Form 1Form-1 Casa Eden- Dec-25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 2Eden ABC Form 02 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 3Eden ABC Form 03 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 1Form-1 Casa Eden- Dec-25.pdf · uploaded 18 May 2026Source
- Withdrawal Update Form 2Eden ABC Form 02 Signed Dec 25.pdf · uploaded 18 May 2026Source
- Withdrawal Update Form 3Eden ABC Form 03 Signed Dec 25.pdf · uploaded 18 May 2026Source
- Form 2A (FY 2025-2026)FORM 2A - Upper Thane-Casa Eden -P51700034837.pdf · uploaded 23 Jun 2026Source
- Withdrawal Update Form 1Form-1 Casa Eden- Dec-25.pdf · uploaded 7 Aug 2026Source
- Withdrawal Update Form 2Eden ABC Form 02 Signed Dec 25.pdf · uploaded 7 Aug 2026Source
- Withdrawal Update Form 3Eden ABC Form 03 Signed Dec 25.pdf · uploaded 7 Aug 2026Source
- Occupational CertificateFull OC casa Eden.pdf · uploaded 7 Aug 2026Source
- Form 5 (FY 2025-2026)Upper Thane Casa Eden.pdf · uploaded 28 Sep 2026Source
Technical
- DocumentLayout.pdf · uploaded 22 Apr 2022Source
- DocumentUpload File - Final.pdf · uploaded 22 Apr 2022Source
- DocumentLayout.pdf · uploaded 24 Nov 2025Source
- DocumentSheet 1 - A.pdf · uploaded 18 May 2026Source
- DocumentSheet 2 - a.pdf · uploaded 18 May 2026Source
- DocumentSheet 3 - A.pdf · uploaded 18 May 2026Source
- DocumentSheet 4 - B.pdf · uploaded 18 May 2026Source
- DocumentSheet 5 - B.pdf · uploaded 18 May 2026Source
- DocumentSheet 6 - B.pdf · uploaded 18 May 2026Source
- DocumentSheet 7 - C.pdf · uploaded 18 May 2026Source
- DocumentSheet 8 - c.pdf · uploaded 18 May 2026Source
- DocumentSheet 9 - C.pdf · uploaded 18 May 2026Source
- DocumentMaster Layout - CasaEden A-B-C MLCP-2-compressed.pdf · uploaded 11 Jun 2026Source
- Document1 Sheet 1 - A.pdf · uploaded 11 Jun 2026Source
- Document2 Sheet 2 - A.pdf · uploaded 11 Jun 2026Source
- Document3 Sheet 3 - A - Main.pdf · uploaded 11 Jun 2026Source
- Document4 Sheet 4 - B.pdf · uploaded 11 Jun 2026Source
- Document5 Sheet 5 - B - Main.pdf · uploaded 11 Jun 2026Source
- Document6 Sheet 6 - B.pdf · uploaded 11 Jun 2026Source
- Document7 Sheet 7 - C.pdf · uploaded 11 Jun 2026Source
- Document8 Sheet 8 - C - main.pdf · uploaded 11 Jun 2026Source
- Document9 Sheet 9 - C.pdf · uploaded 11 Jun 2026Source
Technical (Architect)
Technical (Engineer)
- DocumentForm 1 2 3 - June 22.pdf · uploaded 22 Nov 2024Source
- DocumentForm 1 2 3 - Sep22.pdf · uploaded 22 Nov 2024Source
- DocumentForm 1 2 3 - Dec22.pdf · uploaded 22 Nov 2024Source
- DocumentForm 1 2 - March 23.pdf · uploaded 22 Nov 2024Source
- DocumentForm 1 2 3 - June 23.pdf · uploaded 22 Nov 2024Source
- DocumentForm 2 3 - Sep 23.pdf · uploaded 22 Nov 2024Source
- DocumentForm 2 3 - Dec 23.pdf · uploaded 22 Nov 2024Source
- DocumentForm 2 3 - March 24.pdf · uploaded 22 Nov 2024Source
- DocumentForm 2 3 - June 24.pdf · uploaded 22 Nov 2024Source
- DocumentForm 2 - Sep 24.pdf · uploaded 22 Nov 2024Source
- DocumentEden ABC Form 02 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 28/14, 28/14B
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 3BHK436 units in all
- Address
- 55/12 A, 55/12B (P) & 55/7 of Mankoli 27/1 (P), 28/14, 28/14B & 28/15 of Surai, Surai Mankoli Bhiwandi, Surai Mankoli BhiwandiPIN 421302
- Village
- Surai, Bhiwandi taluka
- Land area for this project
- 6,692 sq m (72,031 sq ft)
- Permissible built-up area
- 36,515 sq m (3,93,044 sq ft)
- Sanctioned built-up area
- 36,515 sq m (3,93,044 sq ft)
- Recreational open space
- 3,189 sq m (34,326 sq ft)
- Designated bank account
- 159
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
55/12 A, 55/12B (P) & 55/7 of Mankoli 27/1 (P), 28/14, 28/14B & 28/15 of Surai
Boundaries
- North
- 55by7 Mankoli
- South
- 26 Surai 55by14 Mankoli
- East
- 28by15 27by2 Surai
- West
- 55by12A 55by11 Mankoli
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking436 units
376 of 436 units booked (86%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | 1BHK | 40.95 sq m · 441 sq ft | 1 | 0 |
| Wing A | 2BHK | 46.73 sq m · 503 sq ft | 15 | 0 |
| Wing A | 2BHK | 49.33 sq m · 531 sq ft | 120 | 118 |
| Wing B | 3BHK | 56.37 sq m · 607 sq ft | 1 | 0 |
| Wing B | 3BHK | 62.15 sq m · 669 sq ft | 3 | 0 |
| Wing B | 3BHK | 65.04 sq m · 700 sq ft | 12 | 0 |
| Wing B | 3BHK | 65.5 sq m · 705 sq ft | 121 | 120 |
| Wing C | 1BHK | 46.25 sq m · 498 sq ft | 1 | 0 |
Show all 14 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing C | 2BHK | 53.48 sq m · 576 sq ft | 3 | 0 |
| Wing C | 2BHK | 54.44 sq m · 586 sq ft | 1 | 0 |
| Wing C | 2BHK | 56.11 sq m · 604 sq ft | 100 | 99 |
| Wing C | 2BHK | 56.85 sq m · 612 sq ft | 12 | 0 |
| Wing C | 2BHK | 56.95 sq m · 613 sq ft | 40 | 38 |
| Wing C | 2BHK | 57.33 sq m · 617 sq ft | 6 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Pradeep Kamble | — |
| Architect | Vilas Desai & Associate | — |
| Chartered accountant | Chirag Sarvaiya & Co | — |
| Engineer | K C Shah Consultants | — |
| Engineer | Rahul Dhanawade | — |
Source: MahaRERA project page. Contact details are not shown.