It is due for completion in Dec 2028, with no extension on record; no MahaRERA orders on record; 40% of its units are booked.

Kavesar, Thane 400615 · by Aniline Construction Company Private Limited

DeliveryDue Dec 2028No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales40% booked164 of 406 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Dec 2028, with no extension on record

  • This projectRegistered 17 Oct 2023, completion promised 31 Dec 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700053143
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170005314317 Oct 202331 Dec 202831 Dec 2028Aniline Construction Company Private LimitedProject page
Documents110

1 document held by Deedo, 109 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN - ACCPL.PDF · uploaded 21 Aug 2023Source

Legal

  • Declaration Form BEngross - Form B - D6 - 18-08-2023.pdf · uploaded 21 Aug 2023Source
  • Other – LegalComp - 25 Conveyance Deed - 11-06-1964 - 166-8.pdf · uploaded 26 Sep 2023Source
  • Other – LegalComp - 29 Conveyance Deed - 13-07-1965 - 166-12.pdf · uploaded 26 Sep 2023Source
  • Other – LegalCOI Aniline Dyestuff to Aniline Construction - 2008.pdf · uploaded 26 Sep 2023Source
  • Legal Title report2 Revised - MAHA RERA Title Report - D6 (12-10-2023).pdf · uploaded 12 Oct 2023Source

Migrated

  • 1 PAN CardPAN - ACCPL.PDF · uploaded 21 Aug 2023Source
Show all 110 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentAmended IOD Letter.pdf · uploaded 21 Aug 2023Source
  • 1 Commencement Certificates / NA Order for plotted development1 CC_D6_BS4 to 23 FL_04-05-2023.pdf · uploaded 21 Aug 2023Source
  • 2 Commencement Certificates / NA Order for plotted development2 Amended_CC_D6_24 to 52 FL_05-06-2023.pdf · uploaded 21 Aug 2023Source
  • 1 Declaration in FORM BEngross - Form B - D6 - 18-08-2023.pdf · uploaded 21 Aug 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report_Asset_Id_Based_Search_17_08_2023_19_57_02_440.pdf · uploaded 21 Aug 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsComp_Declaration - Int in Ors Real Estate Projects - AV, SD, SG.pdf · uploaded 21 Aug 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration_separate Bank Account - 16-08-2023.pdf · uploaded 21 Aug 2023Source
  • 1 a Details of encumbrances concerned to Finance6 Engross - Details of Encumbrances - 05-09-2023.pdf · uploaded 6 Sep 2023Source
  • 1 b Details of encumbrances concerned to Legal6 Engross - Details of Encumbrances - 05-09-2023.pdf · uploaded 6 Sep 2023Source
  • 2 a Details of encumbrances concerned to Finance3 Engross - Details of Encumbrances - Litigation - 20-09-2023.pdf · uploaded 25 Sep 2023Source
  • 2 b Details of encumbrances concerned to Legal3 Engross - Details of Encumbrances - Litigation - 20-09-2023.pdf · uploaded 25 Sep 2023Source
  • 1 Copy of Layout Approval (in case of layout)D6 Layout Plan - 2023.pdf · uploaded 25 Sep 2023Source
  • 2 Copy of Layout Approval (in case of layout)9 20230925_Amended Layout Plan_R6-Model.pdf · uploaded 25 Sep 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentHighlight - Typical Floor Plan - 2023.pdf · uploaded 25 Sep 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentRefuge Floor Plan - 2023.pdf · uploaded 25 Sep 2023Source
  • 1 Declaration about Commencement CertificateEngross - Declaration about CC - 21-09-2023.pdf · uploaded 25 Sep 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentPodium level - 2023.pdf · uploaded 26 Sep 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentGround floor - 2023.pdf · uploaded 26 Sep 2023Source
  • 6 Building Plan Approval / NA Order for plotted development1st Basement - 2023.pdf · uploaded 26 Sep 2023Source
  • 7 Building Plan Approval / NA Order for plotted development2nd Basement - 2023.pdf · uploaded 26 Sep 2023Source
  • 8 Building Plan Approval / NA Order for plotted development3rd Basement - 2023.pdf · uploaded 26 Sep 2023Source
  • 9 Building Plan Approval / NA Order for plotted development4th Basement - 2023.pdf · uploaded 26 Sep 2023Source
  • 10 Building Plan Approval / NA Order for plotted development9 RERA_APPROVED LAYOUT_D6_R3.pdf · uploaded 26 Sep 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 Revised Aniline-Parkwoods D6-Form-3 21-09-2023.pdf · uploaded 26 Sep 2023Source
  • 1 Other – LegalComp - 25 Conveyance Deed - 11-06-1964 - 166-8.pdf · uploaded 26 Sep 2023Source
  • 2 Other – LegalComp - 29 Conveyance Deed - 13-07-1965 - 166-12.pdf · uploaded 26 Sep 2023Source
  • 3 Other – LegalCOI Aniline Dyestuff to Aniline Construction - 2008.pdf · uploaded 26 Sep 2023Source
  • 1 Other – TechnicalDeclaration about Project - Plot Area - 20-09-2023.pdf · uploaded 26 Sep 2023Source
  • 2 CERSAI details3 Declaration on CERSAI Report - 20-09-2023.pdf · uploaded 27 Sep 2023Source
  • 1 Proforma of Allotment letter10 Engross - Allotment Letter -D6 - 05-10-2023.pdf · uploaded 7 Oct 2023Source
  • 1 Deviation Report with respect to Allotment letter4 Engross - Deviation Report and AL - D6 - 06-10-2023.pdf · uploaded 7 Oct 2023Source
  • 1 Proforma of Agreement for sale20 D6 - AFS - 05-10-2023 (v7).pdf · uploaded 8 Oct 2023Source
  • 1 Deviation Report with respect to model copy of Agreement6 Engross - Deviation Report and AFS - 06-10-2023.pdf · uploaded 8 Oct 2023Source
  • 1 Copy of the legal title report2 Revised - MAHA RERA Title Report - D6 (12-10-2023).pdf · uploaded 12 Oct 2023Source
  • 2 Proforma of Agreement for sale22 Engross - D6 - AFS - 30-11-2023 (v8).pdf · uploaded 30 Nov 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Parkwoods D6 - Form 1 - 31-12-2023.pdf · uploaded 19 Jan 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Revised Form 2 - D6 - 31-12-2023.pdf · uploaded 20 Jan 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Revised - D6 - Form 3 - 31-12-2023.pdf · uploaded 20 Jan 2024Source
  • 1 Disclosure of sold/ booked inventoryD6 - Disclosure of Sold booked Inventory - 31-12-2023 (Sanket).pdf · uploaded 31 Jan 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)D6 - Signed Form 1- 31-03-2024.pdf · uploaded 20 Apr 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)D6 - Form 2 - 31-03-2024.pdf · uploaded 20 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)D6 - Form 2A - 31-03-2024.pdf · uploaded 20 Apr 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)D6 - Form 3 - 31-03-2024.pdf · uploaded 20 Apr 2024Source
  • 2 Disclosure of sold/ booked inventorycomp_Parkwoods D6 - Disclosure of Sold Unsold Inventory - 31-03-2024.pdf · uploaded 30 Apr 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - D6 - 30-06-2024.pdf · uploaded 20 Jul 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)D6 Form 2 - 30-06-2024.pdf · uploaded 20 Jul 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Parkwoods D6 Form 3 - 30-06-2024.pdf · uploaded 20 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)D6 - Form 2A - 31-03-2024.pdf · uploaded 29 Jul 2024Source
  • 1 Home Buyer /Allottee Grievance Redressal CellDeclaration_D6.pdf · uploaded 31 Jul 2024Source
  • 3 Copy of Layout Approval (in case of layout)10 Engross - App - Prop Layout - 15-10-2023.pdf · uploaded 20 Aug 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Parkwoods D6 - 2023-2024.pdf · uploaded 8 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryParkwoods D6 - Sold-Unsold Inventory - 30-09-2024.pdf · uploaded 18 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Parkwoods D6 - Form 1 - 30-09-24.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Parkwoods D6 - Form 3 - 30-09-24.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Parkwoods D6 - Form 2 - 30-09-24.pdf · uploaded 19 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryParkwoods D6 - Discl of Sold Inventory - 31-12-2024.pdf · uploaded 17 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Parkwoods D6 - FORM 1- 31-12-2024.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Parkwoods D6 - Form 3 - 31-12-2024.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Parkwoods D6 - Form 2 - 31-12-2024.pdf · uploaded 20 Jan 2025Source
  • 1 CERSAI detailsCERSAI_Acknowledgement Report_Parkwoods - 28-03-2025.pdf · uploaded 17 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Parkwoods D6 Form 1 - 31-03-2025.pdf · uploaded 20 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Parkwoods D6 Form 3 - 31-03-2025.pdf · uploaded 20 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Parkwoods D6 Form 2 - 31-03-2025.pdf · uploaded 20 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryParkwoods D6 Sold-Unsold Inventory - 31-03-2025.pdf · uploaded 20 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Parkwoods D6 Form 2A - 31-03-2025.pdf · uploaded 20 Apr 2025Source
  • Form 5 (FY 2024-2025)Form 5 2024 2025.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1Form 1 - D6 - 30-09-2025.pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 2Form 2 - D6 - 30-09-2025.pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 3Form 3 - D6 - 30-09-2025.pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 1D6 - Form 1 - 31-12-2025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Form 2 - Parkwoods D6 - 31-12-2025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3Form 3 - Parkwoods D6 - 31-12-2025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1D6 - Form 1 - 31-03-2026.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2D6 - Form 2 - 31-03-2026.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3D6 - Form 3 - 31-03-2026.pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2025-2026)D6 - Form 2A - 31-03-2026.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 1Parkwoods D6 - Form 1 - 30-06-2026.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Parkwoods D6 - Form 2 - 30-06-2026.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3Parkwoods D6 - Form 3 - 30-06-2026.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2025-2026)Parkwoods D6 - Form 5 - 2025 - 2026.pdf · uploaded 25 Sep 2026Source

Technical

  • DocumentAmended IOD Letter.pdf · uploaded 21 Aug 2023Source
  • DocumentD6 Layout Plan - 2023.pdf · uploaded 25 Sep 2023Source
  • DocumentHighlight - Typical Floor Plan - 2023.pdf · uploaded 25 Sep 2023Source
  • DocumentRefuge Floor Plan - 2023.pdf · uploaded 25 Sep 2023Source
  • Document9 20230925_Amended Layout Plan_R6-Model.pdf · uploaded 25 Sep 2023Source
  • Document1st Basement - 2023.pdf · uploaded 26 Sep 2023Source
  • Document2nd Basement - 2023.pdf · uploaded 26 Sep 2023Source
  • Document3rd Basement - 2023.pdf · uploaded 26 Sep 2023Source
  • Document4th Basement - 2023.pdf · uploaded 26 Sep 2023Source
  • Document9 RERA_APPROVED LAYOUT_D6_R3.pdf · uploaded 26 Sep 2023Source
  • DocumentGround floor - 2023.pdf · uploaded 26 Sep 2023Source
  • DocumentPodium level - 2023.pdf · uploaded 26 Sep 2023Source
  • Other – TechnicalDeclaration about Project - Plot Area - 20-09-2023.pdf · uploaded 26 Sep 2023Source
  • Document10 Engross - App - Prop Layout - 15-10-2023.pdf · uploaded 20 Aug 2024Source

Technical (Architect)

  • DocumentParkwoods D6 - Form 1 - 30-09-24.pdf · uploaded 19 Oct 2024Source
  • DocumentParkwoods D6 - FORM 1- 31-12-2024.pdf · uploaded 20 Jan 2025Source
  • DocumentParkwoods D6 Form 1 - 31-03-2025.pdf · uploaded 20 Apr 2025Source
  • DocumentParkwoods D6 - Form 1 - 30-06-2026.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentParkwoods D6 - Form 2 - 30-09-24.pdf · uploaded 19 Oct 2024Source
  • DocumentParkwoods D6 - Form 2 - 31-12-2024.pdf · uploaded 20 Jan 2025Source
  • DocumentParkwoods D6 Form 2 - 31-03-2025.pdf · uploaded 20 Apr 2025Source
  • DocumentParkwoods D6 - Form 2 - 30-06-2026.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 166/12A pt, 166/8A pt

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2BHK406 units in all
Address
166/8A pt, 166/12A pt, Ghodbunder Road, KavesarPIN 400615
Village
Thane (M Corp.), Thane taluka
Land area for this project
765 sq m (8,236 sq ft)
Permissible built-up area
40,994 sq m (4,41,250 sq ft)
Sanctioned built-up area
38,494 sq m (4,14,341 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

166/12A pt166/8A pt

Land as published on MahaRERA's project page

166/8A pt, 166/12A pt

Boundaries

North
Bharat Cold Storage
South
Cosmos Jewels
East
Ghodbunder Road
West
Nallah

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking406 units

164 of 406 units booked (40%), as the promoter reported to MahaRERA

2BHK · 406 units
TypeCarpet areaUnitsBooked
2BHK62.7 sq m · 675 sq ft302154
2BHK64.4 sq m · 693 sq ft10410

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals110

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSaakaar Architects—
Chartered accountantB B Jain & Associates—
EngineerJ W Consultants LLP—
EngineerZakirhusain Chaugule—
Registered real estate agentAbhay Chandra Das—
Registered real estate agentAdhik Balu Mahajan—
Registered real estate agentAjay D Nanda—
Registered real estate agentAKtive Property Solutions—
Show all 110 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentAmarendra Balkuwar Giri—
Registered real estate agentAmisha Manojkumar Dubey—
Registered real estate agentAmit Giridhar Desai—
Registered real estate agentAnand Shrikant Khedlekar—
Registered real estate agentAnjani Singh—
Registered real estate agentAnkit Ramashankar Bharati—
Registered real estate agentAnubhav Kamal Jayaswal—
Registered real estate agentAnupam Kumar Tiwari—
Registered real estate agentAnup Shivkumar Singh—
Registered real estate agentAtul Ankush Kadam—
Registered real estate agentAtul Ganeshnandan Tiwari—
Registered real estate agentAtul Kumar Jain—
Registered real estate agentBanti Rajpal Goher—
Registered real estate agentBeing Prop Life Style LLP—
Registered real estate agentBelk Realty LLP—
Registered real estate agentBhoomi Realty—
Registered real estate agentBikram Singh Mali—
Registered real estate agentchirag surendra somaiya—
Registered real estate agentCorazon Homes Private Limited—
Registered real estate agentDigipace Consulting (Opc) Private Limited—
Registered real estate agentDilip Bholay Samanta—
Registered real estate agentDilip Dattatray Bhagwat—
Registered real estate agentDiscover Space LLP—
Registered real estate agentEcstasy Properties & Investments Company—
Registered real estate agentFirst Homebuy Realty LLP—
Registered real estate agentGanesh Keshav Salve—
Registered real estate agentGeetinder Singh—
Registered real estate agentGovind Ramshiromani Gupta—
Registered real estate agentHeadways Realty—
Registered real estate agentHemant Govind Bhandare—
Registered real estate agentHiralal Sukhraj Pal—
Registered real estate agentHome Bazaar Services Pvt Ltd—
Registered real estate agentHomesfy Realty Limited—
Registered real estate agentHome Street Realtors—
Registered real estate agentIndia Realty Services—
Registered real estate agentIndobricks Real Estate Advisory Private Limited—
Registered real estate agentInvestor Experts Property Consulting Private Limited—
Registered real estate agentInvestors Clinic Infratech Private Limited—
Registered real estate agentJagdish Kartar Lalwani—
Registered real estate agentJayashankar Sasidharan Kunnath—
Registered real estate agentJeetendra Bhagwandas Gehani—
Registered real estate agentJeetu Ashok Lassi—
Registered real estate agentJM Financial Products Limited—
Registered real estate agentJohn Real Estate—
Registered real estate agentKalpesh Vijay Deokar—
Registered real estate agentKamal Garewal—
Registered real estate agentKan India Realtors Private Limited—
Registered real estate agentKetan Bhatia—
Registered real estate agentKhushbu Chetan Panchal—
Registered real estate agentKumar Amit Singh—
Registered real estate agentLakha Ram Choudhary—
Registered real estate agentLivnest Technologies Private Limited—
Registered real estate agentMagic Square Properties—
Registered real estate agentMahamaya Spaces Pvt Ltd—
Registered real estate agentMahesh Kumar Ubnare—
Registered real estate agentMake My Flat—
Registered real estate agentManisha Lifespaces Consulting Pvt. Ltd.—
Registered real estate agentMethod and Madness Technology Private Limited—
Registered real estate agentMilan Babulal Arora—
Registered real estate agentMohan Ishwarilal Gupta—
Registered real estate agentMohd Amir Shakeel Memon—
Registered real estate agentMukesh Nandkishor Singh—
Registered real estate agentMumbai Aaxis Realty LLP—
Registered real estate agentMystic India Realtors LLP—
Registered real estate agentNagesh Rajendra Gosavi—
Registered real estate agentNilesh Malhari Khamkar—
Registered real estate agentNitin Ajabrao Sonawane—
Registered real estate agentNobroker Technologies Solutions Private Limited—
Registered real estate agentPankaj Sudam Patil—
Registered real estate agentPawan Ramlaut Verma—
Registered real estate agentPin Click Property Management Pvt Ltd.—
Registered real estate agentPoonamchand Ratanlal Gupta—
Registered real estate agentPranesh Shrirang Suryavanshi—
Registered real estate agentPrashant Manohar Kadam—
Registered real estate agentPratik Mohan Narvekar—
Registered real estate agentPropearth Corporation LLP—
Registered real estate agentProperty Junction International—
Registered real estate agentRajendra Patil—
Registered real estate agentRajita Gajanand Anumalla—
Registered real estate agentRajiv Kumar Singh—
Registered real estate agentRam Bhagwano Bhatia—
Registered real estate agentRana Kumar Widha Singh—
Registered real estate agentRishi Mahavir Sharma—
Registered real estate agentSachin Kumar Pandey—
Registered real estate agentSameer Jaywant Harad—
Registered real estate agentSeed Realty Private Limited—
Registered real estate agentShalini Dinesh Gupta—
Registered real estate agentShivam Chaudhary—
Registered real estate agentShivaprasad Poojary—
Registered real estate agentSubhash Bhimrao Yadav—
Registered real estate agentSunil Rajpal Goher—
Registered real estate agentSurabhi Realtors And Property Management Consultants LLP—
Registered real estate agentSuresh Raghunath Lute—
Registered real estate agentSushil Rajsingh Chandeliya—
Registered real estate agentSwarajya Realtors Private Limited—
Registered real estate agentTabassum Mojahid Syed—
Registered real estate agentTanay Madan Samanta—
Registered real estate agentTruptil Kiran Shinde—
Registered real estate agentUmeshkumar Pandey—
Registered real estate agentVartika Giri—
Registered real estate agentVarun Prakash Motwani—
Registered real estate agentVijay Shaligram Patil—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology