Residential / Group Housing · 1 building · 22 unitsRERA P51700047077

Devansh Galaxy

Deedo IDDP-THN-3GRK

MahaRERA shows it completed; no MahaRERA orders on record; 77% of its units are booked.

Kalambhe, Thane 421601 · by Mohan Nana Adhikari

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales77% booked17 of 22 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 29 Sep 2022, completion promised 23 May 2026.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700047077
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170004707729 Sep 202223 May 202623 May 2026Mohan Nana AdhikariProject page
Documents158

2 documents held by Deedo, 156 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPan Card.pdf · uploaded 8 Aug 2022Source
  • Other – FinanceEngineer's Certificate.pdf · uploaded 13 Aug 2022Source
  • Other – FinanceSelf Declaration.pdf · uploaded 13 Aug 2022Source

Legal

  • Legal Title reportLegal Title Report- Format A.pdf · uploaded 8 Aug 2022Source
  • Declaration Form BNotarised- Affidavit FORM B.pdf · uploaded 8 Aug 2022Source

Migrated

  • 1 PAN CardPan Card.pdf · uploaded 8 Aug 2022Source
Show all 158 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportLegal Title Report- Format A.pdf · uploaded 8 Aug 2022Source
  • 1 a Details of encumbrances concerned to FinanceSelf Declaration no encumbrances.pdf · uploaded 8 Aug 2022Source
  • 1 Copy of Layout Approval (in case of layout)BUILDING LAYOUT.pdf · uploaded 8 Aug 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN.pdf · uploaded 8 Aug 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentNA Order.pdf · uploaded 8 Aug 2022Source
  • 1 Declaration in FORM BNotarised- Affidavit FORM B.pdf · uploaded 8 Aug 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech's Certificate.pdf · uploaded 8 Aug 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate.pdf · uploaded 8 Aug 2022Source
  • 1 CERSAI detailsLegal Title Report- Format A.pdf · uploaded 8 Aug 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 8 Aug 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Account.pdf · uploaded 8 Aug 2022Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 13 Aug 2022Source
  • 1 Other – FinanceEngineer's Certificate.pdf · uploaded 13 Aug 2022Source
  • 2 Other – FinanceSelf Declaration.pdf · uploaded 13 Aug 2022Source
  • 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 6 Sep 2022Source
  • 2 CERSAI detailsAsset Based Search Report.pdf · uploaded 6 Sep 2022Source
  • 1 Proforma of Allotment letterModel Allotment Letter.pdf · uploaded 6 Sep 2022Source
  • 2 Proforma of Allotment letterModel Agreement for Sale.pdf · uploaded 6 Sep 2022Source
  • 1 Deviation Report with respect to Allotment letterSelf Declaration Regarding No Deviation Report.pdf · uploaded 6 Sep 2022Source
  • 1 Deviation Report with respect to model copy of AgreementSelf Declaration Regarding No Deviation Report.pdf · uploaded 6 Sep 2022Source
  • 1 b Details of encumbrances concerned to LegalLegal Encumbrances.pdf · uploaded 14 Sep 2022Source
  • 2 b Details of encumbrances concerned to LegalCO PROMOTER DECLARATION.pdf · uploaded 14 Sep 2022Source
  • 3 b Details of encumbrances concerned to LegalBuilding details.pdf · uploaded 14 Sep 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 13 Apr 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 13 Apr 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 13 Apr 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5.pdf · uploaded 13 Apr 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (30-09-2023).pdf · uploaded 12 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (31-12-2023).pdf · uploaded 12 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (31-03-2024).pdf · uploaded 12 Feb 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (30-06-2024).pdf · uploaded 12 Feb 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1(30-09-2024).pdf · uploaded 12 Feb 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1(31-12-2024).pdf · uploaded 12 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (30-06-2023).pdf · uploaded 12 Feb 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)from-3 30-06-2024.pdf · uploaded 12 Feb 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)form-3 31-12-2024.pdf · uploaded 12 Feb 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)form-3 30-9-2024.pdf · uploaded 12 Feb 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (31-03-2024)_compressed.pdf · uploaded 12 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (31-12-2023)_compressed.pdf · uploaded 12 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (30-09-2023).pdf · uploaded 12 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (30-06-2023).pdf · uploaded 12 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (30-06-2023).pdf · uploaded 12 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (30-09-2023).pdf · uploaded 12 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (31-12-2023).pdf · uploaded 12 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (31-03-2024).pdf · uploaded 12 Feb 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (30-06-2024).pdf · uploaded 12 Feb 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (30-09-2024).pdf · uploaded 12 Feb 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (31-12-2024).pdf · uploaded 12 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorysold and unsold inventory 31122024.pdf · uploaded 12 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5-Scan Copy-17-01-2024.pdf · uploaded 12 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold.pdf · uploaded 4 Jun 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate .pdf · uploaded 5 Jun 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 5 Jun 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Quality Assurance Certificate 31-03-2023.pdf · uploaded 5 Jun 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Quality Assurance Certificate 31-03-2024.pdf · uploaded 5 Jun 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Quality Assurance Certificate 31-03-2025.pdf · uploaded 5 Jun 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - 31 03 2025.pdf · uploaded 6 Jun 2025Source
  • Form 5 (FY 2022-2023)form 5.pdf · uploaded 21 Nov 2025Source
  • Form 5 (FY 2023-2024)Form 5-Scan Copy-17-01-2024.pdf · uploaded 21 Nov 2025Source
  • Form 1form 1.pdf · uploaded 24 Nov 2025Source
  • Form 2form 2.pdf · uploaded 24 Nov 2025Source
  • Form 3form 3.pdf · uploaded 24 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold -Un sold Inventory.pdf · uploaded 24 Nov 2025Source
  • Form 1form 1.pdf · uploaded 24 Nov 2025Source
  • Form 2form 2.pdf · uploaded 24 Nov 2025Source
  • Form 3form 3.pdf · uploaded 24 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold -Un sold Inventory.pdf · uploaded 24 Nov 2025Source
  • Form 1form 1.pdf · uploaded 24 Nov 2025Source
  • Form 2form 2.pdf · uploaded 24 Nov 2025Source
  • Form 3form 3.pdf · uploaded 24 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold -Un sold Inventory.pdf · uploaded 24 Nov 2025Source
  • Form 1Form 1 (30-06-2023).pdf · uploaded 24 Nov 2025Source
  • Form 2Form 2 (30-06-2023).pdf · uploaded 24 Nov 2025Source
  • Form 3Form 3 (30-06-2023).pdf · uploaded 24 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory- 30 06 2023.pdf · uploaded 24 Nov 2025Source
  • Form 1Form 1 (30-09-2023).pdf · uploaded 24 Nov 2025Source
  • Form 2Form 2 (30-09-2023).pdf · uploaded 24 Nov 2025Source
  • Form 3Form 3 (30-09-2023).pdf · uploaded 24 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold-Unsold Inventory - 30 09 2023.pdf · uploaded 24 Nov 2025Source
  • Form 1Form 1 (31-12-2023).pdf · uploaded 24 Nov 2025Source
  • Form 2Form 2 (31-12-2023).pdf · uploaded 24 Nov 2025Source
  • Form 3Form 3 (31-12-2023).pdf · uploaded 24 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold Un sold inventory- 31 12 2023.pdf · uploaded 24 Nov 2025Source
  • Form 1Form 1 (31-03-2024).pdf · uploaded 24 Nov 2025Source
  • Form 2Form 2 (31-03-2024).pdf · uploaded 24 Nov 2025Source
  • Form 3Form 3 (31-03-2024)_compressed.pdf · uploaded 24 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold inventory- 31 03 2024.pdf · uploaded 24 Nov 2025Source
  • Form 1Architect Certificate - 31 03 2025.pdf · uploaded 24 Nov 2025Source
  • Form 2Form 2 Engineer Certificate.pdf · uploaded 24 Nov 2025Source
  • Form 3Form 3 CA Certificate .pdf · uploaded 24 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold.pdf · uploaded 24 Nov 2025Source
  • Form 1Form 1 (30-06-2024).pdf · uploaded 24 Nov 2025Source
  • Form 2Form 2 (30-06-2024).pdf · uploaded 24 Nov 2025Source
  • Form 3from-3 30-06-2024.pdf · uploaded 24 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold- 30 06 2024.pdf · uploaded 24 Nov 2025Source
  • Form 1Form 1(30-09-2024).pdf · uploaded 24 Nov 2025Source
  • Form 2Form 2 (30-09-2024).pdf · uploaded 24 Nov 2025Source
  • Form 3form-3 30-9-2024.pdf · uploaded 24 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold- 30 09 2024.pdf · uploaded 24 Nov 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold-31 12 2024.pdf · uploaded 24 Nov 2025Source
  • Form 1Form 1(31-12-2024).pdf · uploaded 24 Nov 2025Source
  • Form 2Form 2 (31-12-2024).pdf · uploaded 24 Nov 2025Source
  • Form 3form-3 31-12-2024.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 1form 1.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 1form 1.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 1form 1.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 3form 3.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 3form 3.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 3form 3.pdf · uploaded 24 Nov 2025Source
  • Form 2A (FY 2022-2023)Form 2A - Quality Assurance Certificate 31-03-2023.pdf · uploaded 24 Nov 2025Source
  • Form 2A (FY 2023-2024)Form 2A Quality Assurance Certificate 31-03-2024.pdf · uploaded 24 Nov 2025Source
  • Form 2A (FY 2024-2025)Form 2A Quality Assurance Certificate 31-03-2025.pdf · uploaded 24 Nov 2025Source
  • Form 5 (FY 2024-2025)Form 5.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 1Form 1 Q-1.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 1Form 1 Q-2.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 1Form 1 Q-3.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Q-1.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Q-2.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Q-3.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 3Form 3 Q-1.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 3Form 3 Q-2.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 3Form 3 Q-3.pdf · uploaded 26 Nov 2025Source
  • Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 26 Nov 2025Source
  • Withdrawal Update Form 1Form 1 -Q4.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 2Form 2 Q-4.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 3Form 3 Q-4.pdf · uploaded 17 Apr 2026Source
  • Occupational CertificateOccupancy Certificate.pdf · uploaded 15 May 2026Source

Technical

  • DocumentBUILDING LAYOUT.pdf · uploaded 8 Aug 2022Source
  • DocumentBUILDING PLAN.pdf · uploaded 8 Aug 2022Source

Technical (Architect)

  • DocumentForm 1 (30-06-2023).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 1 (30-09-2023).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 1 (31-12-2023).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 1 (31-03-2024).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 1 (30-06-2024).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 1(30-09-2024).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 1(31-12-2024).pdf · uploaded 12 Feb 2025Source
  • DocumentArchitect Certificate - 31 03 2025.pdf · uploaded 6 Jun 2025Source
  • DocumentForm 1 -Q4.pdf · uploaded 17 Apr 2026Source

Technical (Engineer)

  • DocumentForm 2 (30-06-2023).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 2 (30-09-2023).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 2 (31-12-2023).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 2 (31-03-2024).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 2 (30-06-2024).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 2 (30-09-2024).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 2 (31-12-2024).pdf · uploaded 12 Feb 2025Source
  • DocumentForm 2 Engineer Certificate.pdf · uploaded 5 Jun 2025Source
  • DocumentForm 2 Q-4.pdf · uploaded 17 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 19, 20

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
—22 units in all
Address
CTS No. 18, 19, 20, 21B- Plot No. 14, Kalambhe, ShahapurPIN 421601
Village
Kalambhe, Shahapur taluka
Land area for this project
685 sq m (7,373 sq ft)
Permissible built-up area
1,534 sq m (16,515 sq ft)
Sanctioned built-up area
1,534 sq m (16,515 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

192021B- Plot No. 14CTS No. 18

Land as published on MahaRERA's project page

CTS No. 18,19,20,21B- Plot No. 14

Boundaries

North
Forest Land
South
Plot No 15
East
Existing Road of Gaothan village Shahapur
West
Plot No 13

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking22 units

22 units registered

— · 22 units
TypeCarpet areaUnits
——22

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectUnicorne Group—
Chartered accountantishwar kashinath Kadav—
Chartered accountantKishor Madhukar Phaltankar—
Chartered accountantPrashant Raghuram Prabhu—
EngineerUnicorne Group—
EngineerZainuddin H Tole Tole—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Kalambhe

All 10 projects in Kalambhe · Compare Devansh Galaxy with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology