Devansh Galaxy
Deedo IDDP-THN-3GRKMahaRERA shows it completed; no MahaRERA orders on record; 77% of its units are booked.
Kalambhe, Thane 421601 · by Mohan Nana Adhikari
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 29 Sep 2022, completion promised 23 May 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700047077
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700047077 | 29 Sep 2022 | 23 May 2026 | 23 May 2026 | Mohan Nana Adhikari | Project page |
Documents158
2 documents held by Deedo, 156 filings listed on MahaRERA's project page
Show all 158 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportLegal Title Report- Format A.pdf · uploaded 8 Aug 2022Source
- 1 a Details of encumbrances concerned to FinanceSelf Declaration no encumbrances.pdf · uploaded 8 Aug 2022Source
- 1 Copy of Layout Approval (in case of layout)BUILDING LAYOUT.pdf · uploaded 8 Aug 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN.pdf · uploaded 8 Aug 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentNA Order.pdf · uploaded 8 Aug 2022Source
- 1 Declaration in FORM BNotarised- Affidavit FORM B.pdf · uploaded 8 Aug 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech's Certificate.pdf · uploaded 8 Aug 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate.pdf · uploaded 8 Aug 2022Source
- 1 CERSAI detailsLegal Title Report- Format A.pdf · uploaded 8 Aug 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 8 Aug 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Account.pdf · uploaded 8 Aug 2022Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 13 Aug 2022Source
- 1 Other – FinanceEngineer's Certificate.pdf · uploaded 13 Aug 2022Source
- 2 Other – FinanceSelf Declaration.pdf · uploaded 13 Aug 2022Source
- 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 6 Sep 2022Source
- 2 CERSAI detailsAsset Based Search Report.pdf · uploaded 6 Sep 2022Source
- 1 Proforma of Allotment letterModel Allotment Letter.pdf · uploaded 6 Sep 2022Source
- 2 Proforma of Allotment letterModel Agreement for Sale.pdf · uploaded 6 Sep 2022Source
- 1 Deviation Report with respect to Allotment letterSelf Declaration Regarding No Deviation Report.pdf · uploaded 6 Sep 2022Source
- 1 Deviation Report with respect to model copy of AgreementSelf Declaration Regarding No Deviation Report.pdf · uploaded 6 Sep 2022Source
- 1 b Details of encumbrances concerned to LegalLegal Encumbrances.pdf · uploaded 14 Sep 2022Source
- 2 b Details of encumbrances concerned to LegalCO PROMOTER DECLARATION.pdf · uploaded 14 Sep 2022Source
- 3 b Details of encumbrances concerned to LegalBuilding details.pdf · uploaded 14 Sep 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 13 Apr 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 13 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 13 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5.pdf · uploaded 13 Apr 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (30-09-2023).pdf · uploaded 12 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (31-12-2023).pdf · uploaded 12 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (31-03-2024).pdf · uploaded 12 Feb 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (30-06-2024).pdf · uploaded 12 Feb 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1(30-09-2024).pdf · uploaded 12 Feb 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1(31-12-2024).pdf · uploaded 12 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (30-06-2023).pdf · uploaded 12 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)from-3 30-06-2024.pdf · uploaded 12 Feb 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)form-3 31-12-2024.pdf · uploaded 12 Feb 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)form-3 30-9-2024.pdf · uploaded 12 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (31-03-2024)_compressed.pdf · uploaded 12 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (31-12-2023)_compressed.pdf · uploaded 12 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (30-09-2023).pdf · uploaded 12 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (30-06-2023).pdf · uploaded 12 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (30-06-2023).pdf · uploaded 12 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (30-09-2023).pdf · uploaded 12 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (31-12-2023).pdf · uploaded 12 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (31-03-2024).pdf · uploaded 12 Feb 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (30-06-2024).pdf · uploaded 12 Feb 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (30-09-2024).pdf · uploaded 12 Feb 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (31-12-2024).pdf · uploaded 12 Feb 2025Source
- 1 Disclosure of sold/ booked inventorysold and unsold inventory 31122024.pdf · uploaded 12 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5-Scan Copy-17-01-2024.pdf · uploaded 12 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold.pdf · uploaded 4 Jun 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate .pdf · uploaded 5 Jun 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 5 Jun 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Quality Assurance Certificate 31-03-2023.pdf · uploaded 5 Jun 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Quality Assurance Certificate 31-03-2024.pdf · uploaded 5 Jun 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Quality Assurance Certificate 31-03-2025.pdf · uploaded 5 Jun 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - 31 03 2025.pdf · uploaded 6 Jun 2025Source
- Form 5 (FY 2022-2023)form 5.pdf · uploaded 21 Nov 2025Source
- Form 5 (FY 2023-2024)Form 5-Scan Copy-17-01-2024.pdf · uploaded 21 Nov 2025Source
- Form 1form 1.pdf · uploaded 24 Nov 2025Source
- Form 2form 2.pdf · uploaded 24 Nov 2025Source
- Form 3form 3.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventorySold -Un sold Inventory.pdf · uploaded 24 Nov 2025Source
- Form 1form 1.pdf · uploaded 24 Nov 2025Source
- Form 2form 2.pdf · uploaded 24 Nov 2025Source
- Form 3form 3.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventorySold -Un sold Inventory.pdf · uploaded 24 Nov 2025Source
- Form 1form 1.pdf · uploaded 24 Nov 2025Source
- Form 2form 2.pdf · uploaded 24 Nov 2025Source
- Form 3form 3.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventorySold -Un sold Inventory.pdf · uploaded 24 Nov 2025Source
- Form 1Form 1 (30-06-2023).pdf · uploaded 24 Nov 2025Source
- Form 2Form 2 (30-06-2023).pdf · uploaded 24 Nov 2025Source
- Form 3Form 3 (30-06-2023).pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory- 30 06 2023.pdf · uploaded 24 Nov 2025Source
- Form 1Form 1 (30-09-2023).pdf · uploaded 24 Nov 2025Source
- Form 2Form 2 (30-09-2023).pdf · uploaded 24 Nov 2025Source
- Form 3Form 3 (30-09-2023).pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventorySold-Unsold Inventory - 30 09 2023.pdf · uploaded 24 Nov 2025Source
- Form 1Form 1 (31-12-2023).pdf · uploaded 24 Nov 2025Source
- Form 2Form 2 (31-12-2023).pdf · uploaded 24 Nov 2025Source
- Form 3Form 3 (31-12-2023).pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventorySold Un sold inventory- 31 12 2023.pdf · uploaded 24 Nov 2025Source
- Form 1Form 1 (31-03-2024).pdf · uploaded 24 Nov 2025Source
- Form 2Form 2 (31-03-2024).pdf · uploaded 24 Nov 2025Source
- Form 3Form 3 (31-03-2024)_compressed.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventorySold Unsold inventory- 31 03 2024.pdf · uploaded 24 Nov 2025Source
- Form 1Architect Certificate - 31 03 2025.pdf · uploaded 24 Nov 2025Source
- Form 2Form 2 Engineer Certificate.pdf · uploaded 24 Nov 2025Source
- Form 3Form 3 CA Certificate .pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold.pdf · uploaded 24 Nov 2025Source
- Form 1Form 1 (30-06-2024).pdf · uploaded 24 Nov 2025Source
- Form 2Form 2 (30-06-2024).pdf · uploaded 24 Nov 2025Source
- Form 3from-3 30-06-2024.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventorySold Unsold- 30 06 2024.pdf · uploaded 24 Nov 2025Source
- Form 1Form 1(30-09-2024).pdf · uploaded 24 Nov 2025Source
- Form 2Form 2 (30-09-2024).pdf · uploaded 24 Nov 2025Source
- Form 3form-3 30-9-2024.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventorySold Unsold- 30 09 2024.pdf · uploaded 24 Nov 2025Source
- Disclosure of Sold and Booked InventorySold Unsold-31 12 2024.pdf · uploaded 24 Nov 2025Source
- Form 1Form 1(31-12-2024).pdf · uploaded 24 Nov 2025Source
- Form 2Form 2 (31-12-2024).pdf · uploaded 24 Nov 2025Source
- Form 3form-3 31-12-2024.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 1form 1.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 1form 1.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 1form 1.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 2form 2.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 2form 2.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 2form 2.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 3form 3.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 3form 3.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 3form 3.pdf · uploaded 24 Nov 2025Source
- Form 2A (FY 2022-2023)Form 2A - Quality Assurance Certificate 31-03-2023.pdf · uploaded 24 Nov 2025Source
- Form 2A (FY 2023-2024)Form 2A Quality Assurance Certificate 31-03-2024.pdf · uploaded 24 Nov 2025Source
- Form 2A (FY 2024-2025)Form 2A Quality Assurance Certificate 31-03-2025.pdf · uploaded 24 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 1Form 1 Q-1.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 1Form 1 Q-2.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 1Form 1 Q-3.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 2Form 2 Q-1.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 2Form 2 Q-2.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 2Form 2 Q-3.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 3Form 3 Q-1.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 3Form 3 Q-2.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 3Form 3 Q-3.pdf · uploaded 26 Nov 2025Source
- Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 1Form 1 -Q4.pdf · uploaded 17 Apr 2026Source
- Withdrawal Update Form 2Form 2 Q-4.pdf · uploaded 17 Apr 2026Source
- Withdrawal Update Form 3Form 3 Q-4.pdf · uploaded 17 Apr 2026Source
- Occupational CertificateOccupancy Certificate.pdf · uploaded 15 May 2026Source
Technical
Technical (Architect)
- DocumentForm 1 (30-06-2023).pdf · uploaded 12 Feb 2025Source
- DocumentForm 1 (30-09-2023).pdf · uploaded 12 Feb 2025Source
- DocumentForm 1 (31-12-2023).pdf · uploaded 12 Feb 2025Source
- DocumentForm 1 (31-03-2024).pdf · uploaded 12 Feb 2025Source
- DocumentForm 1 (30-06-2024).pdf · uploaded 12 Feb 2025Source
- DocumentForm 1(30-09-2024).pdf · uploaded 12 Feb 2025Source
- DocumentForm 1(31-12-2024).pdf · uploaded 12 Feb 2025Source
- DocumentArchitect Certificate - 31 03 2025.pdf · uploaded 6 Jun 2025Source
- DocumentForm 1 -Q4.pdf · uploaded 17 Apr 2026Source
Technical (Engineer)
- DocumentForm 2 (30-06-2023).pdf · uploaded 12 Feb 2025Source
- DocumentForm 2 (30-09-2023).pdf · uploaded 12 Feb 2025Source
- DocumentForm 2 (31-12-2023).pdf · uploaded 12 Feb 2025Source
- DocumentForm 2 (31-03-2024).pdf · uploaded 12 Feb 2025Source
- DocumentForm 2 (30-06-2024).pdf · uploaded 12 Feb 2025Source
- DocumentForm 2 (30-09-2024).pdf · uploaded 12 Feb 2025Source
- DocumentForm 2 (31-12-2024).pdf · uploaded 12 Feb 2025Source
- DocumentForm 2 Engineer Certificate.pdf · uploaded 5 Jun 2025Source
- DocumentForm 2 Q-4.pdf · uploaded 17 Apr 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 19, 20
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —22 units in all
- Address
- CTS No. 18, 19, 20, 21B- Plot No. 14, Kalambhe, ShahapurPIN 421601
- Village
- Kalambhe, Shahapur taluka
- Land area for this project
- 685 sq m (7,373 sq ft)
- Permissible built-up area
- 1,534 sq m (16,515 sq ft)
- Sanctioned built-up area
- 1,534 sq m (16,515 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
CTS No. 18,19,20,21B- Plot No. 14
Boundaries
- North
- Forest Land
- South
- Plot No 15
- East
- Existing Road of Gaothan village Shahapur
- West
- Plot No 13
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking22 units
22 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 22 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Unicorne Group | — |
| Chartered accountant | ishwar kashinath Kadav | — |
| Chartered accountant | Kishor Madhukar Phaltankar | — |
| Chartered accountant | Prashant Raghuram Prabhu | — |
| Engineer | Unicorne Group | — |
| Engineer | Zainuddin H Tole Tole | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Kalambhe
- Arya ResidencyRERA P51700055051
- Gr GalaxyRERA P51700028295
- Red RoseRERA P51700027336
- Swastik RiverviewRERA P51700021381
- Green ParkRERA P51700018447
- Narmada ParkRERA P51700014449
- OrchidRERA P51700011790
- Chintamani BuildersRERA P51700009293
All 10 projects in Kalambhe · Compare Devansh Galaxy with another project