Renuka Chs
Deedo IDDP-THN-64E1Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 25% of its units are booked.
Dombivli, Thane 421201 · by Neelpadma Constructions
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 21 Apr 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700050607
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700050607 | 21 Apr 2023 | 31 Dec 2026 | 30 Apr 2027 | Neelpadma Constructions | Project page |
Documents138
1 document held by Deedo, 137 filings listed on MahaRERA's project page
Finance
- PAN CardPAN Card Neelpadma Construction.pdf · uploaded 2 Feb 2023Source
Legal
- Declaration Form BAffidavit Jadhav.pdf · uploaded 20 Feb 2023Source
- Legal Title reportjadhav title_11zon.pdf · uploaded 21 Feb 2023Source
- Legal Title reportjadhav flat Agreement_11zon.pdf · uploaded 14 Mar 2023Source
- Legal Title reportogale flat Agreement_11zon.pdf · uploaded 14 Mar 2023Source
- Declaration Form BForm B.pdf · uploaded 7 Feb 2025Source
- Declaration Form BForm B Neelpadma Constrn.pdf · uploaded 28 Feb 2025Source
Show all 138 documentsShow fewer documents
Migrated
- 1 PAN CardPAN Card Neelpadma Construction.pdf · uploaded 2 Feb 2023Source
- 1 a Details of encumbrances concerned to FinanceLegal Encumbrance renuka CHS.pdf · uploaded 2 Feb 2023Source
- 2 a Details of encumbrances concerned to FinanceLegal Title Report jadhav.pdf · uploaded 2 Feb 2023Source
- 1 b Details of encumbrances concerned to LegalLegal Encumbrance renuka CHS.pdf · uploaded 2 Feb 2023Source
- 2 b Details of encumbrances concerned to LegalLegal Title Report jadhav.pdf · uploaded 2 Feb 2023Source
- 1 Copy of Layout Approval (in case of layout)Plan jadhav.pdf · uploaded 2 Feb 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan jadhav.pdf · uploaded 2 Feb 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentcc jadhav.pdf · uploaded 2 Feb 2023Source
- 1 Declaration about Commencement CertificateDeclarations about CC Jadhav.pdf · uploaded 2 Feb 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate for RERA JADHAV.pdf · uploaded 2 Feb 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate.pdf · uploaded 2 Feb 2023Source
- 1 Proforma of Allotment letterModel form of allotment letter_11zon.pdf · uploaded 2 Feb 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Bank details.pdf · uploaded 2 Feb 2023Source
- 1 Deviation Report with respect to model copy of AgreementNo Deviation Sheet.pdf · uploaded 2 Feb 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF INTREST MARATHE RAJAN.pdf · uploaded 17 Feb 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest Nilesh Sao.pdf · uploaded 17 Feb 2023Source
- 1 Declaration in FORM BAffidavit Jadhav.pdf · uploaded 20 Feb 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_11zon.pdf · uploaded 20 Feb 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest Anant Karve.pdf · uploaded 20 Feb 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Intrest Parulekar.pdf · uploaded 20 Feb 2023Source
- 1 Proforma of Agreement for saleAFS.pdf · uploaded 20 Feb 2023Source
- 1 Deviation Report with respect to Allotment letterself declaration allotment letter.pdf · uploaded 20 Feb 2023Source
- 1 Copy of the legal title reportjadhav title_11zon.pdf · uploaded 21 Feb 2023Source
- 3 a Details of encumbrances concerned to Financefinancial encumbrance declaration.pdf · uploaded 27 Feb 2023Source
- 3 b Details of encumbrances concerned to Legalfinancial encumbrance declaration.pdf · uploaded 27 Feb 2023Source
- 1 CERSAI detailsCersai Report.pdf · uploaded 27 Feb 2023Source
- 1 Status of ConveyanceDevelopment Agreement and POa.pdf · uploaded 28 Feb 2023Source
- 2 Copy of the legal title reportjadhav flat Agreement_11zon.pdf · uploaded 14 Mar 2023Source
- 3 Copy of the legal title reportogale flat Agreement_11zon.pdf · uploaded 14 Mar 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Renuka CHS.pdf · uploaded 20 Jul 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Renuka CHS Engineer certificte.pdf · uploaded 20 Jul 2023Source
- 1 Disclosure of sold/ booked inventorySold Unsold Renuka CHS.pdf · uploaded 20 Jul 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_merged_11zon.pdf · uploaded 20 Jul 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate Renuka chs_11zon.pdf · uploaded 25 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate jadhav.pdf · uploaded 25 Oct 2023Source
- 2 Disclosure of sold/ booked inventoryRenuka sold unsold.pdf · uploaded 25 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Renuka CHS_QPR2 V1.pdf · uploaded 25 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate renuka.pdf · uploaded 19 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate renuka chs.pdf · uploaded 19 Jan 2024Source
- 3 Disclosure of sold/ booked inventorysold unsold.pdf · uploaded 19 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Renuka CHS_CA Certificate_Form 3_QPR3_11zon.pdf · uploaded 19 Jan 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentrevise plan jadhav.pdf · uploaded 28 Mar 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentrevised CC jadhav.pdf · uploaded 28 Mar 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Renuka.pdf · uploaded 16 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)enggineer certificate.pdf · uploaded 16 Apr 2024Source
- 4 Disclosure of sold/ booked inventoryRevised sold unsold renuka chs.pdf · uploaded 16 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 QPR4 Renuka CHS_11zon.pdf · uploaded 16 Apr 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Arch Certificate_QPR1_2024-25.pdf · uploaded 22 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engg Certi_QPR1_24-25_Renuka CHS.pdf · uploaded 22 Jul 2024Source
- 5 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 22 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 QPR1_24-25_Renuaka CHS.pdf · uploaded 22 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate _ Q6.pdf · uploaded 24 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate.pdf · uploaded 24 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryrenuka chs sold unsold.pdf · uploaded 24 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Neelpadma Construction Architect Certificate.pdf · uploaded 27 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE RENUKA CHS.pdf · uploaded 27 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Renuka CHS Engineer Certificate.pdf · uploaded 27 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryrenuka sold unsold.pdf · uploaded 27 Jan 2025Source
- 1 Declaration in FORM BForm B.pdf · uploaded 7 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer certificate Renuka chs.pdf · uploaded 7 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2A.pdf · uploaded 7 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 renuka (1).pdf · uploaded 7 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)8 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Engineer certificate form 2.pdf · uploaded 26 Feb 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- 1 Declaration in FORM BForm B Neelpadma Constrn.pdf · uploaded 28 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Renuka CHS.pdf · uploaded 5 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 renuka chs.pdf · uploaded 5 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate renuka.pdf · uploaded 5 May 2025Source
- 1 Disclosure of sold/ booked inventorysold unsold renuka.pdf · uploaded 5 May 2025Source
- Form 1Form 1 Architect Certificate.pdf · uploaded 30 Jul 2025Source
- Form 2Form 2 Engineer Certificate.pdf · uploaded 30 Jul 2025Source
- Form 3Form 3 CA Certificate.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold.pdf · uploaded 30 Jul 2025Source
- Form 5 (FY 2024-2025)Form 5 Neelpadma Constructions.pdf · uploaded 3 Dec 2025Source
- Form 1FORM - 1 Architect Certificate.pdf · uploaded 9 Dec 2025Source
- Form 2FORM - 2 Engineer certificate .pdf · uploaded 9 Dec 2025Source
- Form 3FORM 3 Neelpadma Constructions.pdf · uploaded 9 Dec 2025Source
- Disclosure of Sold and Booked InventoryDisclosure for Sold unsold.pdf · uploaded 9 Dec 2025Source
- Withdrawal Update Form 1Neelpadma Construction Architect Certificate.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 2Engineer certificate renuka.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 3Neelpadma Construction Form 3.pdf · uploaded 4 Mar 2026Source
- Form 2A (FY 2024-2025)Form 2A QUALITY ASSURANCE 31-03-25.pdf · uploaded 13 Mar 2026Source
- Withdrawal Update Form 1Architect certificate Construction.pdf · uploaded 30 Jun 2026Source
- Withdrawal Update Form 2FORM 2 (1).pdf · uploaded 30 Jun 2026Source
- Withdrawal Update Form 3Form 3 Constructions.pdf · uploaded 30 Jun 2026Source
- Withdrawal Update Form 1Architect certificate Neelpadma construction (1).pdf · uploaded 1 Sep 2026Source
- Withdrawal Update Form 2form 2 constructions.pdf · uploaded 1 Sep 2026Source
- Withdrawal Update Form 3form 3 construction .pdf · uploaded 1 Sep 2026Source
Technical
Technical (Architect)
- DocumentArchitect Certificate _ Q6.pdf · uploaded 24 Oct 2024Source
- DocumentNeelpadma Construction Architect Certificate.pdf · uploaded 27 Jan 2025Source
- Document1 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- Document2 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- Document3 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- Document4 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- Document5 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- Document6 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- Document7 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- Document8 Architect certificate FORM 1.pdf · uploaded 26 Feb 2025Source
- DocumentArchitect Certificate Renuka CHS.pdf · uploaded 5 May 2025Source
- DocumentArchitect certificate Neelpadma construction (1).pdf · uploaded 1 Sep 2026Source
Technical (Engineer)
- DocumentEngg Certificate.pdf · uploaded 24 Oct 2024Source
- DocumentRenuka CHS Engineer Certificate.pdf · uploaded 27 Jan 2025Source
- DocumentForm 2 Engineer certificate Renuka chs.pdf · uploaded 7 Feb 2025Source
- Document1 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- Document2 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- Document3 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- Document4 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- Document5 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- Document6 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- Document7 Engineer certificate form 2.pdf · uploaded 26 Feb 2025Source
- Document8 Engineer Certificate form 2.pdf · uploaded 26 Feb 2025Source
- Documentengineer certificate renuka.pdf · uploaded 5 May 2025Source
- Documentform 2 constructions.pdf · uploaded 1 Sep 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 4806, 4807
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK8 units in all
- Address
- 4806, 4807, Nandivali Road, DombivliPIN 421201
- Village
- Dombivli, Kalyan taluka
- Location
- 19.15027, 73.22797
- Designated bank account
- 59
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Boundaries
- North
- Purti Bungalow
- South
- Vardlaxmi Society
- East
- Road
- West
- Nandadeep Bungalow
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking8 units
2 of 8 units booked (25%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 34.82 sq m · 375 sq ft | 4 | 1 |
| 2BHK | 54.42 sq m · 586 sq ft | 4 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Landmark Group | — |
| Chartered accountant | A V Khatu & Co | — |
| Chartered accountant | Punit N Patel | — |
| Engineer | Manohar Patil & Associates | — |
Source: MahaRERA project page. Contact details are not shown.