Completion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 60% of its units are booked.

Dombivli, Thane 421201 · by Vinayak Deoram Patil

DeliveryExtended 4 moPromised Dec 2027 · now due Apr 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales60% booked105 of 175 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2028

  • This projectRegistered 24 Feb 2023, completion promised 31 Dec 2027, revised to 30 Apr 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700049777
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170004977724 Feb 202331 Dec 202730 Apr 2028Vinayak Deoram PatilProject page
Documents120

1 document held by Deedo, 119 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardVinayak Patil (New pan card).pdf · uploaded 23 Dec 2022Source

Legal

  • Declaration Form BAffidavit cum Declaration.pdf · uploaded 6 Feb 2023Source
  • Legal Title reportLegal Title Report (2).pdf · uploaded 14 Feb 2023Source

Migrated

  • 1 PAN CardVinayak Patil (New pan card).pdf · uploaded 23 Dec 2022Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrance -Fianance -Creekedge.pdf · uploaded 23 Dec 2022Source
  • 2 a Details of encumbrances concerned to FinanceEncumbrance -Legal -Creekedge.pdf · uploaded 23 Dec 2022Source
  • 1 b Details of encumbrances concerned to LegalEncumbrance -Fianance -Creekedge.pdf · uploaded 23 Dec 2022Source
Show all 120 documentsShow fewer documents

Migrated

  • 2 b Details of encumbrances concerned to LegalEncumbrance -Legal -Creekedge.pdf · uploaded 23 Dec 2022Source
  • 1 Declaration about Commencement CertificateFormat D -Creekedge.pdf · uploaded 23 Dec 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A -Creekedge.pdf · uploaded 23 Dec 2022Source
  • 1 Proforma of Allotment letterAllotment Letter_Creek Edge_Rudra Construction_26122022.pdf · uploaded 25 Jan 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report_200258809898_For_Asset_Based_Search_27_01_2023_18_45_25_668.pdf · uploaded 27 Jan 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)First Form 3 - Creek Edge - Rudra Construction - Revised.pdf · uploaded 27 Jan 2023Source
  • 1 Deviation Report with respect to Allotment letter20230127000751_2-4.pdf · uploaded 27 Jan 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Agreement Creek edge.pdf · uploaded 27 Jan 2023Source
  • 1 Copy of Layout Approval (in case of layout)MYSCAN_20230113_0001_rotated_11zon.pdf · uploaded 28 Jan 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentMYSCAN_20230113_0001_rotated_11zon.pdf · uploaded 28 Jan 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentMYSCAN_20230113_0002_11zon_rotated.pdf · uploaded 28 Jan 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentMYSCAN_20230113_0003_11zon_rotated.pdf · uploaded 28 Jan 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentAppendix D.pdf · uploaded 28 Jan 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnuxure A.pdf · uploaded 28 Jan 2023Source
  • 1 Declaration in FORM BAffidavit cum Declaration.pdf · uploaded 6 Feb 2023Source
  • 1 Proforma of Agreement for saleAFS_Creek Edge_Rudra Construction_19012023.pdf · uploaded 6 Feb 2023Source
  • 1 Copy of the legal title reportLegal Title Report (2).pdf · uploaded 14 Feb 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Creek Edge as on March 2023.pdf · uploaded 24 Jul 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Creek Edge as on June 2023.pdf · uploaded 24 Jul 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Creek Edge as on 31-03-2023.pdf · uploaded 24 Jul 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Creek Edge as on 30-06-2023.pdf · uploaded 24 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5- Creek Edge as on 2022-23.pdf · uploaded 27 Sep 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Creek Edge as on Sep 2023.pdf · uploaded 16 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Creek Edge as on Sep 2023.pdf · uploaded 16 Oct 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sept 2023.pdf · uploaded 25 Oct 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentPage 1_compressed.pdf · uploaded 27 Oct 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentPage 2_compressed.pdf · uploaded 27 Oct 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentPage 3_compressed.pdf · uploaded 27 Oct 2023Source
  • 7 Building Plan Approval / NA Order for plotted developmentPage 4_compressed.pdf · uploaded 27 Oct 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE Oct 2023.pdf · uploaded 3 Nov 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A (FY 2022-23).pdf · uploaded 18 Nov 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Creek edge as on Sept 2023.pdf · uploaded 14 Dec 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Creek edge as on March 2023.pdf · uploaded 14 Dec 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Creek edge as on June 2023.pdf · uploaded 14 Dec 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Creek edge as on Sept 2023.pdf · uploaded 14 Dec 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Creek edge as on March 2023.pdf · uploaded 14 Dec 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Creek edge as on June 2023.pdf · uploaded 14 Dec 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Creek edge as on Sept 2023.pdf · uploaded 14 Dec 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Creek Edge as on Dec 2023.pdf · uploaded 19 Jan 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Creek Edge as on March 2024.pdf · uploaded 15 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Creek Edge as on Sep 2023.pdf · uploaded 7 Jun 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Creek Edge as on 31-03-2024.pdf · uploaded 7 Jun 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Creek Edge as on June 2024.pdf · uploaded 20 Jul 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Creek Edge as on 30-06-2024 New.pdf · uploaded 18 Oct 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Creek Edge as on 30-09-2024.pdf · uploaded 18 Oct 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Creek Edge as on 30-09-2024.pdf · uploaded 18 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Creek Edge as on June 2024.pdf · uploaded 18 Oct 2024Source
  • 1 Copy of Layout Approval (in case of layout)1_11zon.pdf · uploaded 11 Nov 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 11 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted development2_11zon.pdf · uploaded 11 Nov 2024Source
  • 2 Building Plan Approval / NA Order for plotted development3_11zon.pdf · uploaded 11 Nov 2024Source
  • 3 Building Plan Approval / NA Order for plotted development4_11zon.pdf · uploaded 11 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Creek Edge as on 31-12-2024.pdf · uploaded 16 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Creek Edge as on 31-12-2024.pdf · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Sept 2024.pdf · uploaded 30 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Dec 2024.pdf · uploaded 30 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (Dec 2024)_compressed.pdf · uploaded 30 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (Dec 2024)_compressed.pdf · uploaded 30 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryCircular 29 (Dec 2024)_compressed.pdf · uploaded 30 Jan 2025Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 31 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A FY 2023-24.pdf · uploaded 5 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Creek Edge FY 2023-24.pdf · uploaded 14 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5_compressed.pdf · uploaded 15 Feb 2025Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Creek Edge FY 2023-24.pdf · uploaded 15 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Creek Edge as on March 2025.pdf · uploaded 12 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Creek Edge as on 31-03-2025.pdf · uploaded 20 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Creek Edge as on March 2025.pdf · uploaded 20 Apr 2025Source
  • Form 1Form 1 - Creek Edge as on June 2025.pdf · uploaded 29 Jul 2025Source
  • Form 2Form 2 - Creek Edge as on June 2025.pdf · uploaded 29 Jul 2025Source
  • Form 3Form 3 - Creek Edge as on June 2025.pdf · uploaded 29 Jul 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Creek Edge as on June 2025.pdf · uploaded 29 Jul 2025Source
  • Form 1Form 1 - Creek Edge as on Sep 2025.pdf · uploaded 20 Oct 2025Source
  • Form 2Form 2 - Creek Edge as on Sept 2025.pdf · uploaded 20 Oct 2025Source
  • Form 3Form 3 of Creek Edge as on 30-09-2025.pdf · uploaded 20 Oct 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Creek Edge as on Sept 2025.pdf · uploaded 20 Oct 2025Source
  • Form 1Form 1 - Creek Edge as on March 2026.pdf · uploaded 24 Apr 2026Source
  • Form 2Form 2 - Creek Edge as on March 2026.pdf · uploaded 24 Apr 2026Source
  • Form 3Form 3 - Creek Edge as on March 2026.pdf · uploaded 24 Apr 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Creek Edge as on March 2026.pdf · uploaded 24 Apr 2026Source
  • Form 1Form 1 - Creek Edge as on Dec 2025.pdf · uploaded 24 Apr 2026Source
  • Form 2Form 2 - Creek Edge as on March 2026.pdf · uploaded 24 Apr 2026Source
  • Form 3Form 3 - Creek Edge as on Dec 2025.pdf · uploaded 24 Apr 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Creek Edge as on Dec 2025.pdf · uploaded 24 Apr 2026Source
  • Form 2A (FY 2024-2025)Form 2A Creek Egde FY 2024-25_compressed.pdf · uploaded 1 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A Creek Egde FY 2025-26_compressed.pdf · uploaded 1 Jul 2026Source
  • Form 1Form 1 - Creek Edge June 2026.pdf · uploaded 21 Jul 2026Source
  • Form 2Form 2 - Creek Edge June 2026.pdf · uploaded 21 Jul 2026Source
  • Form 3Form 3 - Creek Edge June 2026.pdf · uploaded 21 Jul 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Creek Edge June 2026.pdf · uploaded 21 Jul 2026Source
  • Form 5 (FY 2025-2026)Form-5 Creek Edge For FY 2025-26.pdf · uploaded 30 Sep 2026Source

Technical

  • DocumentMYSCAN_20230113_0001_rotated_11zon.pdf · uploaded 28 Jan 2023Source
  • DocumentMYSCAN_20230113_0001_rotated_11zon.pdf · uploaded 28 Jan 2023Source
  • DocumentMYSCAN_20230113_0002_11zon_rotated.pdf · uploaded 28 Jan 2023Source
  • DocumentMYSCAN_20230113_0003_11zon_rotated.pdf · uploaded 28 Jan 2023Source
  • DocumentPage 1_compressed.pdf · uploaded 27 Oct 2023Source
  • DocumentPage 2_compressed.pdf · uploaded 27 Oct 2023Source
  • DocumentPage 3_compressed.pdf · uploaded 27 Oct 2023Source
  • DocumentPage 4_compressed.pdf · uploaded 27 Oct 2023Source
  • Document1_11zon.pdf · uploaded 11 Nov 2024Source
  • Document2_11zon.pdf · uploaded 11 Nov 2024Source
  • Document3_11zon.pdf · uploaded 11 Nov 2024Source
  • Document4_11zon.pdf · uploaded 11 Nov 2024Source

Technical (Architect)

  • DocumentForm 1 - Creek Edge as on June 2024.pdf · uploaded 20 Jul 2024Source
  • DocumentForm 1 - Sept 2024.pdf · uploaded 30 Jan 2025Source
  • DocumentForm 1 - Dec 2024.pdf · uploaded 30 Jan 2025Source
  • DocumentForm 1 - Creek Edge as on March 2025.pdf · uploaded 12 Apr 2025Source

Technical (Engineer)

  • DocumentForm 2 - Creek Edge as on Sep 2023.pdf · uploaded 7 Jun 2024Source
  • DocumentForm 2 - Creek Edge as on June 2024.pdf · uploaded 18 Oct 2024Source
  • DocumentForm 2 - Creek Edge as on 30-09-2024.pdf · uploaded 18 Oct 2024Source
  • DocumentForm 2 - Creek Edge as on 31-12-2024.pdf · uploaded 16 Jan 2025Source
  • DocumentForm 2 (Dec 2024)_compressed.pdf · uploaded 30 Jan 2025Source
  • DocumentForm 2 - Creek Edge as on March 2025.pdf · uploaded 20 Apr 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 139(NEW), 140 (NEW)

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1.5BHK, 1BHK, 1RK, 2BHK, 3BHK, 4BHK, Office space, Shop175 units in all
Address
S.NO.68(OLD), 139(NEW), HISSA NO.1, S.NO.229(OLD), 140 (NEW), HISSA NO.1 & 3, S.NO. 244(OLD), 141(NEW), HISSA NO. 1 & 2, S.NO.221(OLD), 142(NEW), HISSA NO.2 & 4, Kanchangaon, Kanchangaon, Dombivli EastPIN 421201
Village
Dombivli, Kalyan taluka
Land area for this project
3,454 sq m (37,176 sq ft)
Permissible built-up area
12,642 sq m (1,36,080 sq ft)
Sanctioned built-up area
12,642 sq m (1,36,080 sq ft)
Designated bank account
105
Developed in phases
No

Survey, CTS, gat or plot numbers

139(NEW)140 (NEW)141(NEW)142(NEW)234HISSA NO.1HISSA NO.2S.NO.221(OLD)S.NO.229(OLD)S.NO. 244(OLD)S.NO.68(OLD)

Land as published on MahaRERA's project page

S.NO.68(OLD), 139(NEW), HISSA NO.1, S.NO.229(OLD), 140 (NEW), HISSA NO.1 & 3, S.NO. 244(OLD), 141(NEW), HISSA NO. 1 & 2, S.NO.221(OLD), 142(NEW), HISSA NO.2 & 4

Boundaries

North
24M Wide DP Road
South
Vithal Plaza CHS
East
Garden Plot
West
Plot

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking175 units

105 of 175 units booked (60%), as the promoter reported to MahaRERA

1.5BHK · 27 units1BHK · 43 units1RK · 2 units2BHK · 68 units3BHK · 8 units4BHK · 1 unitOffice space · 21 unitsShop · 5 units
TypeCarpet areaUnitsBooked
1.5BHK38.79 sq m · 418 sq ft106
1.5BHK38.96 sq m · 419 sq ft11
1.5BHK43.75 sq m · 471 sq ft1613
1BHK35.37 sq m · 381 sq ft265
1BHK36.36 sq m · 391 sq ft44
1BHK36.4 sq m · 392 sq ft33
1BHK36.42 sq m · 392 sq ft1010
1RK28.97 sq m · 312 sq ft10
Show all 33 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
1RK28.98 sq m · 312 sq ft11
2BHK49.18 sq m · 529 sq ft1914
2BHK49.71 sq m · 535 sq ft66
2BHK51.35 sq m · 553 sq ft76
2BHK51.69 sq m · 556 sq ft1612
2BHK53.67 sq m · 578 sq ft11
2BHK58.07 sq m · 625 sq ft53
2BHK58.43 sq m · 629 sq ft76
2BHK58.75 sq m · 632 sq ft43
2BHK58.77 sq m · 633 sq ft33
3BHK62.94 sq m · 677 sq ft66
3BHK63.41 sq m · 683 sq ft21
4BHK126.11 sq m · 1,357 sq ft10
Office space24.46 sq m · 263 sq ft30
Office space26.74 sq m · 288 sq ft30
Office space28.49 sq m · 307 sq ft30
Office space35.97 sq m · 387 sq ft30
Office space40.88 sq m · 440 sq ft30
Office space58.32 sq m · 628 sq ft30
Office space109.42 sq m · 1,178 sq ft30
Shop22.4 sq m · 241 sq ft10
Shop31.82 sq m · 343 sq ft11
Shop37.54 sq m · 404 sq ft10
Shop57.11 sq m · 615 sq ft10
Shop108.24 sq m · 1,165 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals2

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Chartered accountantParth Gada—
EngineerAshokan—

Source: MahaRERA project page. Contact details are not shown.