Others · 1 building · 225 unitsRERA P51700019674

Dream Home

Deedo IDDP-THN-9HV5

It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 41% of its units are booked.

Dawadi, Thane 421203 · by Unity Builders And Developers

DeliveryDue Dec 2026No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales41% booked93 of 225 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Dec 2026, with no extension on record

  • This projectRegistered 20 Feb 2019, completion promised 31 Dec 2026.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700019674
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170001967420 Feb 201931 Dec 202631 Dec 2026Unity Builders And DevelopersProject page
Documents200

1 document held by Deedo, 199 filings listed on MahaRERA's project page

Registration certificate

Legal

  • Legal Title reportTitle certificate.pdf · uploaded 25 Jan 2019Source
  • Declaration Form BArvind Gupta Form-B-.pdf · uploaded 25 Jan 2019Source
  • Declaration Form BArvind Rajawat Form-B-.pdf · uploaded 25 Jan 2019Source
  • Declaration Form BJyotshana Narkhede Form-B-.pdf · uploaded 25 Jan 2019Source
  • Declaration Form BKailash Rajawat Form -B-.pdf · uploaded 25 Jan 2019Source
  • Declaration Form Bnasir Akolawala Form-B-.pdf · uploaded 25 Jan 2019Source
  • Declaration Form BPankaj Chitnis Form-B-.pdf · uploaded 25 Jan 2019Source
Show all 200 documentsShow fewer documents

Legal

  • Declaration Form BRavi Jain Form -B-.pdf · uploaded 25 Jan 2019Source
  • Declaration Form BShailesh Tokre Form-B-.pdf · uploaded 25 Jan 2019Source

Migrated

  • 1 Copy of the legal title reportTitle certificate.pdf · uploaded 25 Jan 2019Source
  • 1 Details of encumbrancesENCUMBRANCE CERTIFICATE.pdf · uploaded 25 Jan 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 25 Jan 2019Source
  • 1 Declaration in FORM BArvind Gupta Form-B-.pdf · uploaded 25 Jan 2019Source
  • 2 Declaration in FORM BArvind Rajawat Form-B-.pdf · uploaded 25 Jan 2019Source
  • 3 Declaration in FORM BJyotshana Narkhede Form-B-.pdf · uploaded 25 Jan 2019Source
  • 4 Declaration in FORM BKailash Rajawat Form -B-.pdf · uploaded 25 Jan 2019Source
  • 5 Declaration in FORM Bnasir Akolawala Form-B-.pdf · uploaded 25 Jan 2019Source
  • 6 Declaration in FORM BPankaj Chitnis Form-B-.pdf · uploaded 25 Jan 2019Source
  • 7 Declaration in FORM BRavi Jain Form -B-.pdf · uploaded 25 Jan 2019Source
  • 8 Declaration in FORM BShailesh Tokre Form-B-.pdf · uploaded 25 Jan 2019Source
  • 1 Proforma of Allotment letterDraft-1.pdf · uploaded 6 Feb 2019Source
  • 2 Proforma of Allotment letterDraft-2.pdf · uploaded 6 Feb 2019Source
  • 3 Proforma of Allotment letterDraft-3.pdf · uploaded 6 Feb 2019Source
  • 4 Proforma of Allotment letterdraft-4.pdf · uploaded 6 Feb 2019Source
  • 1 Building Plan Approval (IOD)1.pdf · uploaded 8 Feb 2019Source
  • 2 Building Plan Approval (IOD)2.pdf · uploaded 8 Feb 2019Source
  • 3 Building Plan Approval (IOD)3.pdf · uploaded 8 Feb 2019Source
  • 4 Building Plan Approval (IOD)4.pdf · uploaded 8 Feb 2019Source
  • 5 Building Plan Approval (IOD)5.pdf · uploaded 8 Feb 2019Source
  • 6 Building Plan Approval (IOD)6.pdf · uploaded 8 Feb 2019Source
  • 7 Building Plan Approval (IOD)7.pdf · uploaded 8 Feb 2019Source
  • 1 Certificates of CA (Form 3)Form 3.pdf · uploaded 8 Feb 2019Source
  • 2 Certificates of CA (Form 3)CA certificate-b.pdf · uploaded 8 Feb 2019Source
  • 1 Copy of Layout Approval (in case of layout)layout.pdf · uploaded 9 Feb 2019Source
  • 1 Other – TechnicalKDMC Mail.pdf · uploaded 15 Feb 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT'S CERTIFICATE.pdf · uploaded 21 Feb 2023Source
  • 3 Certificates of CA (Form 3)Form -3 Q3_compressed.pdf · uploaded 21 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 FORM-1 2018-19_compressed.pdf · uploaded 16 May 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 FORM-1 2019-20_compressed.pdf · uploaded 16 May 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 FORM-1 2020-21_compressed.pdf · uploaded 16 May 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 FORM-1 2021-22_compressed.pdf · uploaded 16 May 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 2022-23 Q1_compressed.pdf · uploaded 16 May 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 2022-23 Q2_compressed.pdf · uploaded 16 May 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 2022-23 Q3_compressed.pdf · uploaded 16 May 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 2022-23 Q4_compressed.pdf · uploaded 16 May 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 FORM 2 2018-19_compressed.pdf · uploaded 16 May 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 FORM 2 2019-20_compressed.pdf · uploaded 16 May 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 FORM 2 2020-21_compressed.pdf · uploaded 16 May 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 FORM 2 2021-22_compressed.pdf · uploaded 16 May 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-2022-23 Q1_compressed.pdf · uploaded 16 May 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-2022-23 Q2_compressed.pdf · uploaded 16 May 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-2022-23 Q3_compressed.pdf · uploaded 16 May 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-2022-23 Q4_compressed.pdf · uploaded 16 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A 2019-20_compressed.pdf · uploaded 16 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A 2020-21_compressed.pdf · uploaded 16 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A 2021-22_compressed.pdf · uploaded 16 May 2023Source
  • 4 Certificates of CA (Form 3)1 Form3 2018-2019.pdf · uploaded 16 May 2023Source
  • 5 Certificates of CA (Form 3)2 Form3 2019-2020.pdf · uploaded 16 May 2023Source
  • 6 Certificates of CA (Form 3)3 Form3 2020-2021.pdf · uploaded 16 May 2023Source
  • 7 Certificates of CA (Form 3)4 Form3 2021-2022.pdf · uploaded 16 May 2023Source
  • 8 Certificates of CA (Form 3)5 Form3 2022-23 Q1.pdf · uploaded 16 May 2023Source
  • 9 Certificates of CA (Form 3)5 Form3 2022-23 Q2.pdf · uploaded 16 May 2023Source
  • 10 Certificates of CA (Form 3)5 Form3 2022-23 Q3.pdf · uploaded 16 May 2023Source
  • 11 Certificates of CA (Form 3)5 Form3 2022-23 Q4.pdf · uploaded 16 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form-5 2018-19.pdf · uploaded 12 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 05 2019-20.pdf · uploaded 12 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form-05 2020-21.pdf · uploaded 12 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form-05 2021-22_compressed.pdf · uploaded 12 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)_compressed.pdf · uploaded 16 Jan 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 (Q1).pdf · uploaded 24 Jan 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)form1-(Q2)-S.pdf · uploaded 24 Jan 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)form2-(Q1)-S.pdf · uploaded 24 Jan 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)form2-(Q2)-S.pdf · uploaded 24 Jan 2024Source
  • 12 Certificates of CA (Form 3)form3-(Q1)-S.pdf · uploaded 24 Jan 2024Source
  • 13 Certificates of CA (Form 3)form3-(Q2)-S.pdf · uploaded 24 Jan 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Dec2023.pdf · uploaded 21 Feb 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2_Dec2023.pdf · uploaded 21 Feb 2024Source
  • 14 Certificates of CA (Form 3)Form3_Dec2023.pdf · uploaded 21 Feb 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1.pdf · uploaded 7 May 2024Source
  • 15 Certificates of CA (Form 3)C A CERT compressed.pdf · uploaded 7 May 2024Source
  • 8 Building Plan Approval (IOD)Revised Plan 4 5 6 7.pdf · uploaded 10 Jun 2024Source
  • 9 Building Plan Approval (IOD)Revised Plan 9 10 11 12 8 13.pdf · uploaded 10 Jun 2024Source
  • 10 Building Plan Approval (IOD)revised Plan G 1 2.pdf · uploaded 10 Jun 2024Source
  • 11 Building Plan Approval (IOD)Revised Plan-3 4.pdf · uploaded 10 Jun 2024Source
  • 2 Commencement Certificates / NA Order for plotted development4 Commencement Certificate-Revised.pdf · uploaded 10 Jun 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)form1-sign.pdf · uploaded 22 Jul 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)form2-sign.pdf · uploaded 22 Jul 2024Source
  • 16 Certificates of CA (Form 3)form 3-sign.pdf · uploaded 22 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1-Sept 2024 -sign.pdf · uploaded 2 Nov 2024Source
  • 2 Certificates of CA (Form 3)Form3-Sept 2024-sign.pdf · uploaded 2 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2-Sept 2024-sign.pdf · uploaded 2 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)fORM-5.pdf · uploaded 6 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)fORM-5.pdf · uploaded 6 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Sign.pdf · uploaded 5 Feb 2025Source
  • 1 Certificates of CA (Form 3)Form-3 S.pdf · uploaded 5 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2 Sign.pdf · uploaded 5 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Sign.pdf · uploaded 27 Jun 2025Source
  • 1 Certificates of CA (Form 3)form 3 Sign.pdf · uploaded 27 Jun 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2-Sign.pdf · uploaded 27 Jun 2025Source
  • Withdrawal Update Form 1form1-sign.pdf · uploaded 12 Jan 2026Source
  • Withdrawal Update Form 2form2-sign.pdf · uploaded 12 Jan 2026Source
  • Withdrawal Update Form 3Form-3-Signed.pdf · uploaded 12 Jan 2026Source
  • Withdrawal Update Form 1form1-sign.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 2form2-sign.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 3Form3_Q2_2025-26.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 1form 1 Q3.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 2form2-sign.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 3form 3 Q3.pdf · uploaded 19 Feb 2026Source
  • Form 1Form-1 2018-19 Q4.pdf · uploaded 23 Feb 2026Source
  • Form 12 FORM-1 2019-20.pdf · uploaded 23 Feb 2026Source
  • Form 13 FORM-1 2020-21.pdf · uploaded 23 Feb 2026Source
  • Form 14 FORM-1 2021-22.pdf · uploaded 23 Feb 2026Source
  • Form 11 FORM-1 2022-23 Q1.pdf · uploaded 23 Feb 2026Source
  • Form 1FORM-1 2022-23 Q2.pdf · uploaded 23 Feb 2026Source
  • Form 1FORM-1 2022-23 Q3.pdf · uploaded 23 Feb 2026Source
  • Form 1FORM-1 2022-23 Q4.pdf · uploaded 23 Feb 2026Source
  • Form 1form 1 (Q1)-S.pdf · uploaded 23 Feb 2026Source
  • Form 1form1-(Q2)-S.pdf · uploaded 23 Feb 2026Source
  • Form 1Form1 Q3.pdf · uploaded 23 Feb 2026Source
  • Form 1Form-1 Q4.pdf · uploaded 23 Feb 2026Source
  • Form 1form1 Q1-sign.pdf · uploaded 23 Feb 2026Source
  • Form 1Form1-Q2 2024 -sign.pdf · uploaded 23 Feb 2026Source
  • Form 1Form-1 Q3 Sign.pdf · uploaded 23 Feb 2026Source
  • Form 1Form 1 Q4-Sign.pdf · uploaded 23 Feb 2026Source
  • Form 2Form-2 2018-19 Q4.pdf · uploaded 23 Feb 2026Source
  • Form 22 FORM 2 2019-20.pdf · uploaded 23 Feb 2026Source
  • Form 23 FORM 2 2020-21.pdf · uploaded 23 Feb 2026Source
  • Form 24 FORM 2 2021-22.pdf · uploaded 23 Feb 2026Source
  • Form 21 FORM 2-2022-23 Q1.pdf · uploaded 23 Feb 2026Source
  • Form 2FORM 2-2022-23 Q2.pdf · uploaded 23 Feb 2026Source
  • Form 2FORM 2-2022-23 Q3.pdf · uploaded 23 Feb 2026Source
  • Form 2FORM 2-2022-23 Q4.pdf · uploaded 23 Feb 2026Source
  • Form 2form2-(Q1)-S.pdf · uploaded 23 Feb 2026Source
  • Form 2form2-(Q2)-S.pdf · uploaded 23 Feb 2026Source
  • Form 2From 2 Q3.pdf · uploaded 23 Feb 2026Source
  • Form 2Form-2 Q4.pdf · uploaded 23 Feb 2026Source
  • Form 2form2 Q1-sign.pdf · uploaded 23 Feb 2026Source
  • Form 2Form2-Q2 2024-sign.pdf · uploaded 23 Feb 2026Source
  • Form 2Form2 Q3 Sign.pdf · uploaded 23 Feb 2026Source
  • Form 2form 2 Q4-Sign.pdf · uploaded 23 Feb 2026Source
  • Form 3Form-3 2018-19 Q4.pdf · uploaded 23 Feb 2026Source
  • Form 32 Form3 2019-2020.pdf · uploaded 23 Feb 2026Source
  • Form 33 Form3 2020-2021.pdf · uploaded 23 Feb 2026Source
  • Form 34 Form3 2021-2022.pdf · uploaded 23 Feb 2026Source
  • Form 31 Form3 2022-23 Q1.pdf · uploaded 23 Feb 2026Source
  • Form 3Form3 2022-23 Q2.pdf · uploaded 23 Feb 2026Source
  • Form 35 Form3 2022-23 Q3.pdf · uploaded 23 Feb 2026Source
  • Form 3Form 3 2022-23 Q4.pdf · uploaded 23 Feb 2026Source
  • Form 3form3-(Q1)-S.pdf · uploaded 23 Feb 2026Source
  • Form 3form3-(Q2)-S.pdf · uploaded 23 Feb 2026Source
  • Form 3Form3 Q3.pdf · uploaded 23 Feb 2026Source
  • Form 3form-3 Q4.pdf · uploaded 23 Feb 2026Source
  • Form 3form 3 Q1-sign.pdf · uploaded 23 Feb 2026Source
  • Form 3Form3-Q2 2024-sign.pdf · uploaded 23 Feb 2026Source
  • Form 3Form-3 Q3 Sign.pdf · uploaded 23 Feb 2026Source
  • Form 3form 3 Q4 Sign.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ4 18-19.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ4 19-20.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ4 20-21.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ4 21-22.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked Inventory1 Q1 22-23.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ2 22-23.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ3 22-23.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ4 22-23.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ1 23-24.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ2 23-24.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ3 23-24.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ4 23-24.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ1 24-25.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ2 24-25.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ3 24-25.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryQ4 24-25.pdf · uploaded 23 Feb 2026Source
  • Withdrawal Update Form 1scan copy Form 1 Q 4.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2Scan copy Form 2 Q 4.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3Form-3 Signed_compressed.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1form 1-Q1-Signed.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 2form 2-Q1-Signed.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 3form 3-Q1-Signed_compressed.pdf · uploaded 4 Aug 2026Source

Technical

  • Document1.pdf · uploaded 8 Feb 2019Source
  • Document2.pdf · uploaded 8 Feb 2019Source
  • Document3.pdf · uploaded 8 Feb 2019Source
  • Document4.pdf · uploaded 8 Feb 2019Source
  • Document5.pdf · uploaded 8 Feb 2019Source
  • Document6.pdf · uploaded 8 Feb 2019Source
  • Document7.pdf · uploaded 8 Feb 2019Source
  • Documentlayout.pdf · uploaded 9 Feb 2019Source
  • Other – TechnicalKDMC Mail.pdf · uploaded 15 Feb 2023Source
  • DocumentRevised Plan 4 5 6 7.pdf · uploaded 10 Jun 2024Source
  • DocumentRevised Plan 9 10 11 12 8 13.pdf · uploaded 10 Jun 2024Source
  • Documentrevised Plan G 1 2.pdf · uploaded 10 Jun 2024Source
  • DocumentRevised Plan-3 4.pdf · uploaded 10 Jun 2024Source

Technical (Architect)

  • DocumentForm1-Sept 2024 -sign.pdf · uploaded 2 Nov 2024Source
  • DocumentForm-1 Sign.pdf · uploaded 5 Feb 2025Source
  • DocumentForm 1-Sign.pdf · uploaded 27 Jun 2025Source
  • Documentform 1-Q1-Signed.pdf · uploaded 4 Aug 2026Source

Technical (Engineer)

  • DocumentForm2-Sept 2024-sign.pdf · uploaded 2 Nov 2024Source
  • DocumentForm2 Sign.pdf · uploaded 5 Feb 2025Source
  • Documentform 2-Sign.pdf · uploaded 27 Jun 2025Source
  • Documentform 2-Q1-Signed.pdf · uploaded 4 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 121 HISSA NO14

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 1RK, 2BHK, Landowner 1 BHK, landowner 1BHK, Landowner 1BHK, Landowner 1 RK, landowner 1RK, Landowner 1RK, Landowner 2BHK, Landowner Office, Landowners 1BHK, Landowner Shop, Office space, Shop225 units in all
Address
121 Hissa No14, Dawadi Road, Nr Shivsena OfficePIN 421203
Village
Dawadi, Kalyan taluka
Land area for this project
3,400 sq m (36,597 sq ft)
Permissible built-up area
3,101 sq m (33,377 sq ft)
Sanctioned built-up area
3,101 sq m (33,377 sq ft)
Recreational open space
677 sq m (7,283 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

121 HISSA NO14

Land as published on MahaRERA's project page

121 HISSA NO14

Boundaries

North
Shree Samrth Building
South
Mr Lotes Banglow
East
Dawadi Main Road
West
Asha Palms Building

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking225 units

93 of 225 units booked (41%), as the promoter reported to MahaRERA

1BHK · 66 units1RK · 65 units2BHK · 14 unitsLandowner 1 BHK · 2 unitslandowner 1BHK · 8 unitsLandowner 1BHK · 14 unitsLandowner 1 RK · 1 unitlandowner 1RK · 1 unitLandowner 1RK · 33 unitsLandowner 2BHK · 8 unitsLandowner Office · 2 unitsLandowners 1BHK · 1 unitLandowner Shop · 4 unitsOffice space · 2 unitsShop · 4 units
TypeCarpet areaUnitsBooked
1BHK35.68 sq m · 384 sq ft11
1BHK36.46 sq m · 392 sq ft11
1BHK37.34 sq m · 402 sq ft76
1BHK37.46 sq m · 403 sq ft42
1BHK37.47 sq m · 403 sq ft88
1BHK37.55 sq m · 404 sq ft11
1BHK37.56 sq m · 404 sq ft1414
1BHK38.14 sq m · 411 sq ft22
Show all 48 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
1BHK38.32 sq m · 412 sq ft11
1BHK39.22 sq m · 422 sq ft1311
1BHK39.26 sq m · 423 sq ft104
1BHK74.14 sq m · 798 sq ft44
1RK21.89 sq m · 236 sq ft11
1RK24.54 sq m · 264 sq ft30
1RK24.66 sq m · 265 sq ft5931
1RK24.8 sq m · 267 sq ft10
1RK24.84 sq m · 267 sq ft10
2BHK58.41 sq m · 629 sq ft52
2BHK58.58 sq m · 631 sq ft92
Landowner 1 BHK39.26 sq m · 423 sq ft20
landowner 1BHK37.47 sq m · 403 sq ft80
Landowner 1BHK37.34 sq m · 402 sq ft50
Landowner 1BHK37.46 sq m · 403 sq ft60
Landowner 1BHK38.14 sq m · 411 sq ft10
Landowner 1BHK38.32 sq m · 412 sq ft10
Landowner 1BHK39.22 sq m · 422 sq ft10
Landowner 1 RK24.54 sq m · 264 sq ft10
landowner 1RK24.69 sq m · 266 sq ft10
Landowner 1RK24.66 sq m · 265 sq ft310
Landowner 1RK24.8 sq m · 267 sq ft10
Landowner 1RK24.84 sq m · 267 sq ft10
Landowner 2BHK58.41 sq m · 629 sq ft30
Landowner 2BHK58.58 sq m · 631 sq ft30
Landowner 2BHK87.96 sq m · 947 sq ft10
Landowner 2BHK116.44 sq m · 1,253 sq ft10
Landowner Office54.1 sq m · 582 sq ft10
Landowner Office70.4 sq m · 758 sq ft10
Landowners 1BHK36.46 sq m · 392 sq ft10
Landowner Shop20.26 sq m · 218 sq ft11
Landowner Shop25.36 sq m · 273 sq ft10
Landowner Shop25.67 sq m · 276 sq ft10
Landowner Shop26.95 sq m · 290 sq ft10
Office space44.4 sq m · 478 sq ft10
Office space54.1 sq m · 582 sq ft10
Shop20.17 sq m · 217 sq ft10
Shop25.37 sq m · 273 sq ft10
Shop25.68 sq m · 276 sq ft10
Shop26.95 sq m · 290 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectThe Firm—
Chartered accountantCa Sagar Joshi—
OtherMatrixbuildweel—

Source: MahaRERA project page. Contact details are not shown.