Others · 2 buildings · 273 unitsRERA P51700054437

Crystal Antras

Deedo IDDP-THN-NW3P

Completion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 60% of its units are booked.

Chitalsar Manpada, Thane 400607 · by Luxora Realtors Private Limited

DeliveryExtended 4 moPromised Dec 2028 · now due Apr 2029RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales60% booked165 of 273 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2029

  • This projectRegistered 25 Jan 2024, completion promised 31 Dec 2028, revised to 30 Apr 2029.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700054437
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170005443725 Jan 202431 Dec 202830 Apr 2029Luxora Realtors Private LimitedProject page
Documents125

1 document held by Deedo, 124 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardLRPL-PAN CARD.pdf · uploaded 2 Jan 2024Source
  • Other – FinanceDeclaration for CERSAI_Regarding Mortgage (1).pdf · uploaded 19 Jan 2024Source

Legal

  • Declaration Form BForm B_Crystal Antras.pdf · uploaded 4 Jan 2024Source
  • Legal Title reportLegal Title_Jan_24.pdf · uploaded 18 Jan 2024Source

Migrated

  • 1 PAN CardLRPL-PAN CARD.pdf · uploaded 2 Jan 2024Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN.pdf · uploaded 2 Jan 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC Crystal Antara.pdf · uploaded 2 Jan 2024Source
Show all 125 documentsShow fewer documents

Migrated

  • 1 a Details of encumbrances concerned to FinanceLegal Encumbrance_Crystal Antara.pdf · uploaded 3 Jan 2024Source
  • 1 b Details of encumbrances concerned to LegalLegal Encumbrance_Crystal Antara.pdf · uploaded 3 Jan 2024Source
  • 1 Declaration about Commencement CertificateDECLARATION ON COMMENCEMENT.pdf · uploaded 3 Jan 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in other Real Estate Organisations_DV.pdf · uploaded 3 Jan 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in other Real Estate Organisations_TH.pdf · uploaded 3 Jan 2024Source
  • 1 Proforma of Agreement for saleAFS T6 T7 with Annexure A_Final.pdf · uploaded 3 Jan 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A_Bank Account_Crystal Antara.pdf · uploaded 3 Jan 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report AFS.pdf · uploaded 3 Jan 2024Source
  • 2 a Details of encumbrances concerned to FinanceFinancial Encumbrance_Crystal Antara.pdf · uploaded 4 Jan 2024Source
  • 2 b Details of encumbrances concerned to LegalFinancial Encumbrance_Crystal Antara.pdf · uploaded 4 Jan 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentLAYOUT PLAN.pdf · uploaded 4 Jan 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentT6.pdf · uploaded 4 Jan 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentT6 SECTIONS.pdf · uploaded 4 Jan 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentT7.pdf · uploaded 4 Jan 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentT7 SECTION.pdf · uploaded 4 Jan 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentSTILT LVL PARKING.pdf · uploaded 4 Jan 2024Source
  • 7 Building Plan Approval / NA Order for plotted development1ST LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
  • 8 Building Plan Approval / NA Order for plotted development2ND LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
  • 9 Building Plan Approval / NA Order for plotted development3RD LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
  • 1 Declaration in FORM BForm B - Affidavit cum Declaration.pdf · uploaded 4 Jan 2024Source
  • 1 Proforma of Allotment letterAllotment letter.pdf · uploaded 4 Jan 2024Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report of allotment letter.pdf · uploaded 4 Jan 2024Source
  • 1 Other – TechnicalSTILT LVL PARKING.pdf · uploaded 4 Jan 2024Source
  • 2 Other – TechnicalCLUB HOUSE 1.pdf · uploaded 4 Jan 2024Source
  • 3 Other – TechnicalCLUB HOUSE 2.pdf · uploaded 4 Jan 2024Source
  • 1 Copy of the legal title reportLegal Title_Jan_24.pdf · uploaded 18 Jan 2024Source
  • 1 Other – FinanceDeclaration for CERSAI_Regarding Mortgage (1).pdf · uploaded 19 Jan 2024Source
  • 1 CERSAI detailsDeclaration for CERSAI_Regarding Mortgage (1).pdf · uploaded 22 Jan 2024Source
  • 2 CERSAI detailsCrystal Antara CERSAI Report.pdf · uploaded 22 Jan 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 CA Certificate on Project Cost Fund withdrawal (Form 3) (2).pdf · uploaded 22 Jan 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC_29_Apr_24.pdf · uploaded 30 Apr 2024Source
  • 2 Declaration about Commencement CertificateCC_29_Apr_24.pdf · uploaded 30 Apr 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_CA_Mar_24.pdf · uploaded 8 May 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_CA_Mar_24.pdf · uploaded 8 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QA_Cert_CA_Mar_24.pdf · uploaded 8 May 2024Source
  • 2 Deviation Report with respect to model copy of AgreementDeviation Report AFS_4_Jun_24_signed.pdf · uploaded 4 Jun 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Mar_24.pdf · uploaded 7 Jun 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Jun_24_Crystal Antara.pdf · uploaded 14 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Jun_24_Crystal Antara.pdf · uploaded 14 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Jun_24_Crystal Antara.pdf · uploaded 30 Oct 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_CA_Sep_24.pdf · uploaded 12 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5_Cert_CA_2023_2024.pdf · uploaded 12 Nov 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Crystal Antara_Sep_24.pdf · uploaded 15 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Crystal Antara_Sep_24.pdf · uploaded 15 Nov 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Crystal Antara_Sep_24.pdf · uploaded 15 Nov 2024Source
  • 1 Disclosure of sold/ booked inventorySold and Booked Inventory_Crystal Antara.pdf · uploaded 15 Nov 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Crystal Antara Sep 24 UDIN_.pdf · uploaded 3 Dec 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentLAYOUT PLAN_23.pdf · uploaded 29 Jan 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentT7_23.pdf · uploaded 29 Jan 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentT7 SECTION_23.pdf · uploaded 29 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_CA_Dec_24.pdf · uploaded 13 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_CA_Dec_24.pdf · uploaded 13 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_CA_Dec_24.pdf · uploaded 18 Feb 2025Source
  • DocumentArch_Cert_CA_Mar_25_signed.pdf · uploaded 29 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_CA_Mar_2025_signed.pdf · uploaded 29 Apr 2025Source
  • DocumentEngg_Cert_CA_Mar_25_signed.pdf · uploaded 29 Apr 2025Source
  • Form 2A (FY 2024-2025)QA_Cert_Mar_25.pdf · uploaded 13 Jun 2025Source
  • Form 1Arch_Cert_CA_Mar_25_signed.pdf · uploaded 19 Jun 2025Source
  • Form 2Engg_Cert_CA_Mar_25_signed.pdf · uploaded 19 Jun 2025Source
  • Form 3CA_Cert_Crystal Antara_Mar_25.pdf · uploaded 19 Jun 2025Source
  • Disclosure of Sold and Booked InventorySold and Booked Inventory_Crystal Antara_Mar 25.pdf · uploaded 19 Jun 2025Source
  • Withdrawal Update Form 1Arch_Cert_Crystal Antras_Jun_25_signed.pdf · uploaded 30 Jul 2025Source
  • Withdrawal Update Form 2Engg_Cert_Crystal Antras_Jun_25_signed.pdf · uploaded 30 Jul 2025Source
  • Withdrawal Update Form 3CA_Cert_Crystal Antras_Jun_25_signed.pdf · uploaded 30 Jul 2025Source
  • Withdrawal Update Form 1Arch_Cert_CA_Sep_25.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 2Engg_Cert_CA_Sep_25.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 3CA_Cert_CA_Sep_25.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 1Arch_Cert_CA_Sep_25.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 2Engg Cert_CA_Upload_Dec_25.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 3CA_Cert_CA_Upload_Dec_25.pdf · uploaded 30 Jan 2026Source
  • Withdrawal Update Form 1CA_Arch_Cert_Upload_Mar_26.pdf · uploaded 10 Apr 2026Source
  • Withdrawal Update Form 2CA_Engg_Cert_Upload_Mar_26.pdf · uploaded 10 Apr 2026Source
  • Withdrawal Update Form 3CA_CA_Cert_Upload_Mar_26.pdf · uploaded 10 Apr 2026Source
  • Form 2A (FY 2025-2026)QA_Cert_CA_Mar_26.pdf · uploaded 18 Jun 2026Source
  • Form 5 (FY 2024-2025)LRPL - Form 5 - FY 2024-2025.pdf · uploaded 19 Jun 2026Source
  • Form 5 (FY 2025-2026)LRPL - Form 5 - FY 2025-2026.pdf · uploaded 20 Jun 2026Source
  • Withdrawal Update Form 1Arch_Cert_CA_Jun_26.pdf · uploaded 8 Aug 2026Source
  • Withdrawal Update Form 2Engg_Cert_CA_Jun_26.pdf · uploaded 8 Aug 2026Source
  • Withdrawal Update Form 3CA_Cert_CA_Jun_26.pdf · uploaded 8 Aug 2026Source

Technical

  • DocumentLAYOUT PLAN.pdf · uploaded 2 Jan 2024Source
  • DocumentLAYOUT PLAN.pdf · uploaded 4 Jan 2024Source
  • DocumentT6.pdf · uploaded 4 Jan 2024Source
  • DocumentT6 SECTIONS.pdf · uploaded 4 Jan 2024Source
  • DocumentT7.pdf · uploaded 4 Jan 2024Source
  • DocumentT7 SECTION.pdf · uploaded 4 Jan 2024Source
  • DocumentSTILT LVL PARKING.pdf · uploaded 4 Jan 2024Source
  • Document1ST LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
  • Document2ND LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
  • Document3RD LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
  • Other – TechnicalSTILT LVL PARKING.pdf · uploaded 4 Jan 2024Source
  • Other – TechnicalCLUB HOUSE 1.pdf · uploaded 4 Jan 2024Source
  • Other – TechnicalCLUB HOUSE 2.pdf · uploaded 4 Jan 2024Source
  • DocumentLAYOUT PLAN_23.pdf · uploaded 29 Jan 2025Source
  • DocumentT7_23.pdf · uploaded 29 Jan 2025Source
  • DocumentT7 SECTION_23.pdf · uploaded 29 Jan 2025Source
  • DocumentLayout Plan.pdf · uploaded 20 May 2026Source
  • DocumentBuilding Plan 2.pdf · uploaded 20 May 2026Source
  • DocumentBuilding Plan 3.pdf · uploaded 20 May 2026Source
  • DocumentBuilding Plan 4.pdf · uploaded 20 May 2026Source
  • DocumentBuilding Plan 5.pdf · uploaded 20 May 2026Source
  • DocumentBuilding Plan 6.pdf · uploaded 20 May 2026Source
  • DocumentBuilding Plan 7.pdf · uploaded 20 May 2026Source
  • DocumentBuilding Plan 8.pdf · uploaded 20 May 2026Source
  • DocumentBuilding Plan 9.pdf · uploaded 20 May 2026Source
  • DocumentBuilding Plan 10.pdf · uploaded 20 May 2026Source
  • DocumentBuilding Plan 11.pdf · uploaded 20 May 2026Source

Technical (Architect)

  • DocumentArch_Cert_Jun_24_Crystal Antara.pdf · uploaded 14 Oct 2024Source
  • DocumentArch_Cert_CA_Sep_24.pdf · uploaded 12 Nov 2024Source
  • DocumentArch_Cert_Crystal Antara_Sep_24.pdf · uploaded 15 Nov 2024Source
  • DocumentArch_Cert_CA_Dec_24.pdf · uploaded 13 Feb 2025Source
  • DocumentArch_Cert_CA_Mar_25_signed.pdf · uploaded 29 Apr 2025Source
  • DocumentArch_Cert_CA_Jun_26.pdf · uploaded 8 Aug 2026Source

Technical (Engineer)

  • DocumentEngg_Cert_Jun_24_Crystal Antara.pdf · uploaded 14 Oct 2024Source
  • DocumentEngg_Cert_Crystal Antara_Sep_24.pdf · uploaded 15 Nov 2024Source
  • DocumentEngg_Cert_CA_Dec_24.pdf · uploaded 13 Feb 2025Source
  • DocumentEngg_Cert_CA_Mar_25_signed.pdf · uploaded 29 Apr 2025Source
  • DocumentEngg_Cert_CA_Jun_26.pdf · uploaded 8 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 59A/30/2/1, 59A/30/2/2

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, 3BHK, 4BHK, Shop273 units in all
Address
64/1, 64/2, 64/3/1, 64/3/2, 68/1A, 68/3A, 68/1B, 68/2C, 68/3B, 59A/30/2/1, 59A/30/2/2, 59A/30/2/3, 67/1A, 67/1B, 67/2A, 67/2B, 67/3, 69/1, 69/2, 69/3, & 69/4, Ghodbunder road, Chitalsar ManpadaPIN 400607
Village
Chitalsar Manpada, Thane taluka
Land area for this project
7,102 sq m (76,448 sq ft)
Permissible built-up area
57,900 sq m (6,23,231 sq ft)
Sanctioned built-up area
52,486 sq m (5,64,950 sq ft)
Recreational open space
12,987 sq m (1,39,790 sq ft)
Designated bank account
86
Developed in phases
Yes

Survey, CTS, gat or plot numbers

59A/30/2/159A/30/2/259A/30/2/364/164/264/3/164/3/267/1A67/1B67/2A67/2B67/368/1A68/1B68/2C68/3A68/3B69/169/269/369/4

Land as published on MahaRERA's project page

64/1, 64/2, 64/3/1, 64/3/2, 68/1A, 68/3A, 68/1B, 68/2C, 68/3B, 59A/30/2/1, 59A/30/2/2, 59A/30/2/3, 67/1A, 67/1B, 67/2A, 67/2B, 67/3, 69/1, 69/2, 69/3, & 69/4

Boundaries

North
Crystal Spires
South
Nallah And Gut No - 68 2c And 68 3b
East
Gut No - 68 3c
West
Raj Vilas Bunglows And Row House

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking273 units

165 of 273 units booked (60%), as the promoter reported to MahaRERA

1BHK · 10 units2BHK · 47 units3BHK · 167 units4BHK · 48 unitsShop · 1 unit
BuildingTypeCarpet areaUnitsBooked
T61BHK47.73 sq m · 514 sq ft10
T61BHK48.09 sq m · 518 sq ft71
T62BHK68.11 sq m · 733 sq ft10
T63BHK84.22 sq m · 907 sq ft20
T63BHK84.49 sq m · 909 sq ft4431
T63BHK84.65 sq m · 911 sq ft3519
T63BHK103 sq m · 1,109 sq ft4529
T63BHK103.83 sq m · 1,118 sq ft10
Show all 21 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
T64BHK138.69 sq m · 1,493 sq ft20
T64BHK138.97 sq m · 1,496 sq ft4630
T6Shop130.44 sq m · 1,404 sq ft10
T71BHK45.43 sq m · 489 sq ft20
T72BHK58.63 sq m · 631 sq ft10
T72BHK59.24 sq m · 638 sq ft30
T72BHK65.49 sq m · 705 sq ft4026
T72BHK66.23 sq m · 713 sq ft10
T72BHK66.33 sq m · 714 sq ft10
T73BHK82.51 sq m · 888 sq ft10
T73BHK82.59 sq m · 889 sq ft20
T73BHK83.13 sq m · 895 sq ft1615
T73BHK83.22 sq m · 896 sq ft2114

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectKadri Consultant Pvt Ltd—
ArchitectShashikant Deshmukh—
Chartered accountantShivnandan Katdare—
EngineerGn Systech Consulting Engineers Pvt. Ltd—
EngineerJeevan Ramkrishna Kute—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Chitalsar Manpada

All 8 projects in Chitalsar Manpada · Compare Crystal Antras with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology