Deedo IDDP-THN-NW3PCompletion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 60% of its units are booked.
Chitalsar Manpada, Thane 400607 · by Luxora Realtors Private Limited
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2029
- This projectRegistered 25 Jan 2024, completion promised 31 Dec 2028, revised to 30 Apr 2029.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700054437
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700054437 | 25 Jan 2024 | 31 Dec 2028 | 30 Apr 2029 | Luxora Realtors Private Limited | Project page |
Documents125
1 document held by Deedo, 124 filings listed on MahaRERA's project page
Finance
Legal
Show all 125 documentsShow fewer documents
Migrated
- 1 a Details of encumbrances concerned to FinanceLegal Encumbrance_Crystal Antara.pdf · uploaded 3 Jan 2024Source
- 1 b Details of encumbrances concerned to LegalLegal Encumbrance_Crystal Antara.pdf · uploaded 3 Jan 2024Source
- 1 Declaration about Commencement CertificateDECLARATION ON COMMENCEMENT.pdf · uploaded 3 Jan 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in other Real Estate Organisations_DV.pdf · uploaded 3 Jan 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in other Real Estate Organisations_TH.pdf · uploaded 3 Jan 2024Source
- 1 Proforma of Agreement for saleAFS T6 T7 with Annexure A_Final.pdf · uploaded 3 Jan 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A_Bank Account_Crystal Antara.pdf · uploaded 3 Jan 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report AFS.pdf · uploaded 3 Jan 2024Source
- 2 a Details of encumbrances concerned to FinanceFinancial Encumbrance_Crystal Antara.pdf · uploaded 4 Jan 2024Source
- 2 b Details of encumbrances concerned to LegalFinancial Encumbrance_Crystal Antara.pdf · uploaded 4 Jan 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentLAYOUT PLAN.pdf · uploaded 4 Jan 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentT6.pdf · uploaded 4 Jan 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentT6 SECTIONS.pdf · uploaded 4 Jan 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentT7.pdf · uploaded 4 Jan 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentT7 SECTION.pdf · uploaded 4 Jan 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentSTILT LVL PARKING.pdf · uploaded 4 Jan 2024Source
- 7 Building Plan Approval / NA Order for plotted development1ST LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
- 8 Building Plan Approval / NA Order for plotted development2ND LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
- 9 Building Plan Approval / NA Order for plotted development3RD LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
- 1 Declaration in FORM BForm B - Affidavit cum Declaration.pdf · uploaded 4 Jan 2024Source
- 1 Proforma of Allotment letterAllotment letter.pdf · uploaded 4 Jan 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation Report of allotment letter.pdf · uploaded 4 Jan 2024Source
- 1 Other – TechnicalSTILT LVL PARKING.pdf · uploaded 4 Jan 2024Source
- 2 Other – TechnicalCLUB HOUSE 1.pdf · uploaded 4 Jan 2024Source
- 3 Other – TechnicalCLUB HOUSE 2.pdf · uploaded 4 Jan 2024Source
- 1 Copy of the legal title reportLegal Title_Jan_24.pdf · uploaded 18 Jan 2024Source
- 1 Other – FinanceDeclaration for CERSAI_Regarding Mortgage (1).pdf · uploaded 19 Jan 2024Source
- 1 CERSAI detailsDeclaration for CERSAI_Regarding Mortgage (1).pdf · uploaded 22 Jan 2024Source
- 2 CERSAI detailsCrystal Antara CERSAI Report.pdf · uploaded 22 Jan 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 CA Certificate on Project Cost Fund withdrawal (Form 3) (2).pdf · uploaded 22 Jan 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCC_29_Apr_24.pdf · uploaded 30 Apr 2024Source
- 2 Declaration about Commencement CertificateCC_29_Apr_24.pdf · uploaded 30 Apr 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_CA_Mar_24.pdf · uploaded 8 May 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_CA_Mar_24.pdf · uploaded 8 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QA_Cert_CA_Mar_24.pdf · uploaded 8 May 2024Source
- 2 Deviation Report with respect to model copy of AgreementDeviation Report AFS_4_Jun_24_signed.pdf · uploaded 4 Jun 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Mar_24.pdf · uploaded 7 Jun 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Jun_24_Crystal Antara.pdf · uploaded 14 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Jun_24_Crystal Antara.pdf · uploaded 14 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Jun_24_Crystal Antara.pdf · uploaded 30 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_CA_Sep_24.pdf · uploaded 12 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5_Cert_CA_2023_2024.pdf · uploaded 12 Nov 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_Crystal Antara_Sep_24.pdf · uploaded 15 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Crystal Antara_Sep_24.pdf · uploaded 15 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_Crystal Antara_Sep_24.pdf · uploaded 15 Nov 2024Source
- 1 Disclosure of sold/ booked inventorySold and Booked Inventory_Crystal Antara.pdf · uploaded 15 Nov 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Crystal Antara Sep 24 UDIN_.pdf · uploaded 3 Dec 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentLAYOUT PLAN_23.pdf · uploaded 29 Jan 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentT7_23.pdf · uploaded 29 Jan 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentT7 SECTION_23.pdf · uploaded 29 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Cert_CA_Dec_24.pdf · uploaded 13 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Cert_CA_Dec_24.pdf · uploaded 13 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_CA_Dec_24.pdf · uploaded 18 Feb 2025Source
- DocumentArch_Cert_CA_Mar_25_signed.pdf · uploaded 29 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_CA_Mar_2025_signed.pdf · uploaded 29 Apr 2025Source
- DocumentEngg_Cert_CA_Mar_25_signed.pdf · uploaded 29 Apr 2025Source
- Form 2A (FY 2024-2025)QA_Cert_Mar_25.pdf · uploaded 13 Jun 2025Source
- Form 1Arch_Cert_CA_Mar_25_signed.pdf · uploaded 19 Jun 2025Source
- Form 2Engg_Cert_CA_Mar_25_signed.pdf · uploaded 19 Jun 2025Source
- Form 3CA_Cert_Crystal Antara_Mar_25.pdf · uploaded 19 Jun 2025Source
- Disclosure of Sold and Booked InventorySold and Booked Inventory_Crystal Antara_Mar 25.pdf · uploaded 19 Jun 2025Source
- Withdrawal Update Form 1Arch_Cert_Crystal Antras_Jun_25_signed.pdf · uploaded 30 Jul 2025Source
- Withdrawal Update Form 2Engg_Cert_Crystal Antras_Jun_25_signed.pdf · uploaded 30 Jul 2025Source
- Withdrawal Update Form 3CA_Cert_Crystal Antras_Jun_25_signed.pdf · uploaded 30 Jul 2025Source
- Withdrawal Update Form 1Arch_Cert_CA_Sep_25.pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 2Engg_Cert_CA_Sep_25.pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 3CA_Cert_CA_Sep_25.pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 1Arch_Cert_CA_Sep_25.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2Engg Cert_CA_Upload_Dec_25.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3CA_Cert_CA_Upload_Dec_25.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1CA_Arch_Cert_Upload_Mar_26.pdf · uploaded 10 Apr 2026Source
- Withdrawal Update Form 2CA_Engg_Cert_Upload_Mar_26.pdf · uploaded 10 Apr 2026Source
- Withdrawal Update Form 3CA_CA_Cert_Upload_Mar_26.pdf · uploaded 10 Apr 2026Source
- Form 2A (FY 2025-2026)QA_Cert_CA_Mar_26.pdf · uploaded 18 Jun 2026Source
- Form 5 (FY 2024-2025)LRPL - Form 5 - FY 2024-2025.pdf · uploaded 19 Jun 2026Source
- Form 5 (FY 2025-2026)LRPL - Form 5 - FY 2025-2026.pdf · uploaded 20 Jun 2026Source
- Withdrawal Update Form 1Arch_Cert_CA_Jun_26.pdf · uploaded 8 Aug 2026Source
- Withdrawal Update Form 2Engg_Cert_CA_Jun_26.pdf · uploaded 8 Aug 2026Source
- Withdrawal Update Form 3CA_Cert_CA_Jun_26.pdf · uploaded 8 Aug 2026Source
Technical
- DocumentLAYOUT PLAN.pdf · uploaded 2 Jan 2024Source
- DocumentLAYOUT PLAN.pdf · uploaded 4 Jan 2024Source
- DocumentT6.pdf · uploaded 4 Jan 2024Source
- DocumentT6 SECTIONS.pdf · uploaded 4 Jan 2024Source
- DocumentT7.pdf · uploaded 4 Jan 2024Source
- DocumentT7 SECTION.pdf · uploaded 4 Jan 2024Source
- DocumentSTILT LVL PARKING.pdf · uploaded 4 Jan 2024Source
- Document1ST LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
- Document2ND LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
- Document3RD LVL PARKING PODIUM.pdf · uploaded 4 Jan 2024Source
- Other – TechnicalSTILT LVL PARKING.pdf · uploaded 4 Jan 2024Source
- Other – TechnicalCLUB HOUSE 1.pdf · uploaded 4 Jan 2024Source
- Other – TechnicalCLUB HOUSE 2.pdf · uploaded 4 Jan 2024Source
- DocumentLAYOUT PLAN_23.pdf · uploaded 29 Jan 2025Source
- DocumentT7_23.pdf · uploaded 29 Jan 2025Source
- DocumentT7 SECTION_23.pdf · uploaded 29 Jan 2025Source
- DocumentLayout Plan.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan 2.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan 3.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan 4.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan 5.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan 6.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan 7.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan 8.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan 9.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan 10.pdf · uploaded 20 May 2026Source
- DocumentBuilding Plan 11.pdf · uploaded 20 May 2026Source
Technical (Architect)
- DocumentArch_Cert_Jun_24_Crystal Antara.pdf · uploaded 14 Oct 2024Source
- DocumentArch_Cert_CA_Sep_24.pdf · uploaded 12 Nov 2024Source
- DocumentArch_Cert_Crystal Antara_Sep_24.pdf · uploaded 15 Nov 2024Source
- DocumentArch_Cert_CA_Dec_24.pdf · uploaded 13 Feb 2025Source
- DocumentArch_Cert_CA_Mar_25_signed.pdf · uploaded 29 Apr 2025Source
- DocumentArch_Cert_CA_Jun_26.pdf · uploaded 8 Aug 2026Source
Technical (Engineer)
- DocumentEngg_Cert_Jun_24_Crystal Antara.pdf · uploaded 14 Oct 2024Source
- DocumentEngg_Cert_Crystal Antara_Sep_24.pdf · uploaded 15 Nov 2024Source
- DocumentEngg_Cert_CA_Dec_24.pdf · uploaded 13 Feb 2025Source
- DocumentEngg_Cert_CA_Mar_25_signed.pdf · uploaded 29 Apr 2025Source
- DocumentEngg_Cert_CA_Jun_26.pdf · uploaded 8 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 59A/30/2/1, 59A/30/2/2
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 3BHK, 4BHK, Shop273 units in all
- Address
- 64/1, 64/2, 64/3/1, 64/3/2, 68/1A, 68/3A, 68/1B, 68/2C, 68/3B, 59A/30/2/1, 59A/30/2/2, 59A/30/2/3, 67/1A, 67/1B, 67/2A, 67/2B, 67/3, 69/1, 69/2, 69/3, & 69/4, Ghodbunder road, Chitalsar ManpadaPIN 400607
- Village
- Chitalsar Manpada, Thane taluka
- Location
- 19.23135, 72.97620
- Land area for this project
- 7,102 sq m (76,448 sq ft)
- Permissible built-up area
- 57,900 sq m (6,23,231 sq ft)
- Sanctioned built-up area
- 52,486 sq m (5,64,950 sq ft)
- Recreational open space
- 12,987 sq m (1,39,790 sq ft)
- Designated bank account
- 86
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
64/1, 64/2, 64/3/1, 64/3/2, 68/1A, 68/3A, 68/1B, 68/2C, 68/3B, 59A/30/2/1, 59A/30/2/2, 59A/30/2/3, 67/1A, 67/1B, 67/2A, 67/2B, 67/3, 69/1, 69/2, 69/3, & 69/4
Boundaries
- North
- Crystal Spires
- South
- Nallah And Gut No - 68 2c And 68 3b
- East
- Gut No - 68 3c
- West
- Raj Vilas Bunglows And Row House
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking273 units
165 of 273 units booked (60%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| T6 | 1BHK | 47.73 sq m · 514 sq ft | 1 | 0 |
| T6 | 1BHK | 48.09 sq m · 518 sq ft | 7 | 1 |
| T6 | 2BHK | 68.11 sq m · 733 sq ft | 1 | 0 |
| T6 | 3BHK | 84.22 sq m · 907 sq ft | 2 | 0 |
| T6 | 3BHK | 84.49 sq m · 909 sq ft | 44 | 31 |
| T6 | 3BHK | 84.65 sq m · 911 sq ft | 35 | 19 |
| T6 | 3BHK | 103 sq m · 1,109 sq ft | 45 | 29 |
| T6 | 3BHK | 103.83 sq m · 1,118 sq ft | 1 | 0 |
Show all 21 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| T6 | 4BHK | 138.69 sq m · 1,493 sq ft | 2 | 0 |
| T6 | 4BHK | 138.97 sq m · 1,496 sq ft | 46 | 30 |
| T6 | Shop | 130.44 sq m · 1,404 sq ft | 1 | 0 |
| T7 | 1BHK | 45.43 sq m · 489 sq ft | 2 | 0 |
| T7 | 2BHK | 58.63 sq m · 631 sq ft | 1 | 0 |
| T7 | 2BHK | 59.24 sq m · 638 sq ft | 3 | 0 |
| T7 | 2BHK | 65.49 sq m · 705 sq ft | 40 | 26 |
| T7 | 2BHK | 66.23 sq m · 713 sq ft | 1 | 0 |
| T7 | 2BHK | 66.33 sq m · 714 sq ft | 1 | 0 |
| T7 | 3BHK | 82.51 sq m · 888 sq ft | 1 | 0 |
| T7 | 3BHK | 82.59 sq m · 889 sq ft | 2 | 0 |
| T7 | 3BHK | 83.13 sq m · 895 sq ft | 16 | 15 |
| T7 | 3BHK | 83.22 sq m · 896 sq ft | 21 | 14 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Kadri Consultant Pvt Ltd | — |
| Architect | Shashikant Deshmukh | — |
| Chartered accountant | Shivnandan Katdare | — |
| Engineer | Gn Systech Consulting Engineers Pvt. Ltd | — |
| Engineer | Jeevan Ramkrishna Kute | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Chitalsar Manpada
- Runwal One-Tower ERERA PR1330002503071
- Runwal One- Tower D2RERA PR1330002502886
- Runwal One-Tower D1RERA PR1330002502798
- 25HOURLIFE - Tower A1RERA P51700053696
- Crystal SpiresRERA P51700009216
- Unique Vistas MHADA Buildingno. 4 5 6 7RERA P51700007320
- Unique Vistas MHADA Building No. 1,2,3RERA P51700006925
All 8 projects in Chitalsar Manpada · Compare Crystal Antras with another project