Residential / Group Housing · 6 buildings · 1,176 unitsRERA P51700022148

Godrej Nirvaan

Deedo IDDP-THN-4ZR3

MahaRERA shows it completed; no MahaRERA orders on record; 89% of its units are booked.

Bhiwandi, Maharashtra 421302 · by Prakhhyat Dwellings Llp

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales89% booked1,047 of 1,176 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 28 Aug 2019, completion promised 30 Dec 2024.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

6 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700022148
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170002214828 Aug 201930 Dec 202430 Dec 2024Prakhhyat Dwellings LLPProject page
Documents136

2 documents held by Deedo, 134 filings listed on MahaRERA's project page

Registration certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardPAN Card.pdf · uploaded 8 Aug 2019Source

Legal

  • OtherDECLARATION.pdf · uploaded 13 Aug 2019Source
  • OtherAmenities.pdf · uploaded 13 Aug 2019Source
  • Legal Title reportPhase I Short Title Report.pdf · uploaded 13 Aug 2019Source
  • Legal Title reportPhase II Short Title Report.pdf · uploaded 13 Aug 2019Source
  • Legal Title reportPhase III Short Title Report.pdf · uploaded 13 Aug 2019Source
Show all 136 documentsShow fewer documents

Legal

  • Legal Title reportTitle 45.pdf · uploaded 13 Aug 2019Source
  • Declaration Form BFORM B PRAKHHYAT.pdf · uploaded 13 Aug 2019Source
  • OtherGODREJ NIRVAAN - Amenities.pdf · uploaded 9 Sep 2019Source
  • OtherDeclaration 1.pdf · uploaded 26 Sep 2019Source
  • Declaration Form BFOMR B ATS.pdf · uploaded 28 Sep 2019Source
  • Declaration Form BFORM B OWNER.pdf · uploaded 28 Sep 2019Source
  • Declaration Form BFORM B PRAKHHYAT.pdf · uploaded 28 Sep 2019Source
  • OtherRERA Form 2A_Godrej Nirvaan_Mar 21.pdf · uploaded 3 Apr 2021Source
  • OtherAmenities Nirvaan.pdf · uploaded 31 Jan 2025Source
  • OtherAmenities Nirvaan.pdf · uploaded 31 Jan 2025Source
  • OtherAmenities Nirvaan.pdf · uploaded 31 Jan 2025Source

Migrated

  • 1 PAN CardPAN Card.pdf · uploaded 8 Aug 2019Source
  • 1 Copy of Layout Approval (in case of layout)Layout Phase 1.pdf · uploaded 8 Aug 2019Source
  • 1 Building Plan Approval / NA Order for plotted developmentDP Letter.pdf · uploaded 8 Aug 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC up to Plinth.pdf · uploaded 8 Aug 2019Source
  • 1 Details of encumbrancesEncumbrance Letter.pdf · uploaded 12 Aug 2019Source
  • 1 Copy of the legal title reportPhase I Short Title Report.pdf · uploaded 13 Aug 2019Source
  • 2 Copy of the legal title reportPhase II Short Title Report.pdf · uploaded 13 Aug 2019Source
  • 3 Copy of the legal title reportPhase III Short Title Report.pdf · uploaded 13 Aug 2019Source
  • 4 Copy of the legal title reportTitle 45.pdf · uploaded 13 Aug 2019Source
  • 2 Copy of Layout Approval (in case of layout)001_compressed Layout.pdf · uploaded 13 Aug 2019Source
  • 1 Declaration in FORM BFORM B PRAKHHYAT.pdf · uploaded 13 Aug 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Godrej Kalyan - CA Certificate - July 19.pdf · uploaded 13 Aug 2019Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate 2.pdf · uploaded 13 Aug 2019Source
  • 1 Proforma of Allotment letterRERA Agreement for Sale 13082019.pdf · uploaded 13 Aug 2019Source
  • 1 OtherDECLARATION.pdf · uploaded 13 Aug 2019Source
  • 2 OtherAmenities.pdf · uploaded 13 Aug 2019Source
  • 2 Proforma of Allotment letterAFS_Godrej Nirvaan.pdf · uploaded 30 Aug 2019Source
  • 3 OtherGODREJ NIRVAAN - Amenities.pdf · uploaded 9 Sep 2019Source
  • 4 OtherDeclaration 1.pdf · uploaded 26 Sep 2019Source
  • 2 Declaration in FORM BFOMR B ATS.pdf · uploaded 28 Sep 2019Source
  • 3 Declaration in FORM BFORM B OWNER.pdf · uploaded 28 Sep 2019Source
  • 4 Declaration in FORM BFORM B PRAKHHYAT.pdf · uploaded 28 Sep 2019Source
  • 2 Details of encumbrancesEncumbrance Letter 16 MAR 2020.pdf · uploaded 25 May 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)RERA Form 2A_ Godrej Nirvaan_March 2020.pdf · uploaded 25 May 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)form 5.pdf · uploaded 2 Oct 2020Source
  • 5 OtherRERA Form 2A_Godrej Nirvaan_Mar 21.pdf · uploaded 3 Apr 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 300921.pdf · uploaded 30 Sep 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentDP CC - 10 Dec 2020.pdf · uploaded 23 Dec 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Godrej_Nirvaan_Form_5.pdf · uploaded 30 Sep 2022Source
  • 1 Proforma of Agreement for saleGodrej Upavan - AFS Draft.pdf · uploaded 13 Jan 2023Source
  • 2 Proforma of Agreement for saleGodrej Nirvaan - AFS Draft.pdf · uploaded 13 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY23 compressed.pdf · uploaded 18 Sep 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvaan PH 1 Sep 23.pdf · uploaded 17 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Nirvaan Dec'21.pdf · uploaded 17 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate Nirvaan Dec'22.pdf · uploaded 17 Oct 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Nirvaan- Jun 22.pdf · uploaded 17 Oct 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Nirvaan- Jun'23.pdf · uploaded 17 Oct 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Nirvaan Mar'22.pdf · uploaded 17 Oct 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Nirvaan- Mar'23.pdf · uploaded 17 Oct 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Nirvaan- Sept 22.pdf · uploaded 17 Oct 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvaan PH 1 Sep 23.pdf · uploaded 15 Dec 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvan Jun 2023.pdf · uploaded 15 Dec 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvaan PH 1 Mar-23.pdf · uploaded 15 Dec 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvaan March 22.pdf · uploaded 15 Dec 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ NIRVAAN PHASE 1_PDL_CERTIFICATE SEPT'23 - Final.pdf · uploaded 15 Dec 2023Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC Tower 2,4,5,6.pdf · uploaded 15 Dec 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvaan PH 1 Dec 2023.pdf · uploaded 22 Jan 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ NIRVAAN PHASE 1_PDL_CERTIFICATE DEC'23 - Final.pdf · uploaded 22 Jan 2024Source
  • 1 Home Buyer /Allottee Grievance Redressal CellHome Buyer Allottee Grievance Redressal Cell GODREJ NIRVAAN.pdf · uploaded 29 Jan 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Inventory - Dec 23 - Nirvaan.pdf · uploaded 1 Feb 2024View
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE - Nirvaan_compressed.pdf · uploaded 1 Feb 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Inventory - Dec 23 - Nirvaan.pdf · uploaded 1 Feb 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera Certificate for Nirvaan-signed.pdf · uploaded 20 Apr 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ NIRVAAN PHASE 1_PDL_CERTIFICATE MAR'24 - Final_Revised-signed.pdf · uploaded 20 Apr 2024Source
  • 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD_Rera_Nirvaan_31Mar24-signed.pdf · uploaded 20 Apr 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate nirvaan mar 24 compressed-signed.pdf · uploaded 20 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Nirvaan- FY 2024-QA Certificate-signed.pdf · uploaded 1 Jul 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvaan Rera Certificate Kalyan June 2024-signed.pdf · uploaded 19 Jul 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ NIRVAAN PHASE 1_PDL_CERTIFICATE JULY'24 - Final-signed.pdf · uploaded 19 Jul 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Nirvaan_Jun 24-signed.pdf · uploaded 19 Jul 2024Source
  • 3 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD_Rera_Nirvaan_30Jun24.pdf · uploaded 20 Aug 2024Source
  • Form 5 (FY 2023-2024)Godrej Nirvaan Form 5 FY 23 24.pdf · uploaded 2 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Godrej Nirvaan Form 5 FY 23 24.pdf · uploaded 6 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Godrej Nirvaan Form 5 FY 23 24.pdf · uploaded 6 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Godrej Nirvaan Form 5 FY 23 24.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvaan Phase 1 Sep 24-signed.pdf · uploaded 22 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ NIRVAAN PHASE 1_PDL_CERTIFICATE SEPT'24 - Final-signed.pdf · uploaded 22 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvaan Phase 1 Sep 24-signed.pdf · uploaded 22 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ NIRVAAN PHASE 1_PDL_CERTIFICATE SEPT'24 - Final-signed.pdf · uploaded 22 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Nirvaan Phase 1 Sep 24-signed.pdf · uploaded 22 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ NIRVAAN PHASE 1_PDL_CERTIFICATE SEPT'24 - Final-signed.pdf · uploaded 22 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD_Rera_Nirvaan_30Sep24.pdf · uploaded 25 Oct 2024View
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD_Rera_Nirvaan_30Sep24.pdf · uploaded 25 Oct 2024View
  • 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD_Rera_Nirvaan_30Sep24.pdf · uploaded 25 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Godrej Nirvaan RERA CA certificate - Sep 24-signed-part 2.pdf · uploaded 5 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Godrej Nirvaan RERA CA certificate - Sep 24-signed-part 1.pdf · uploaded 5 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Godrej Nirvaan RERA CA certificate - Sep 24-signed-part 2.pdf · uploaded 5 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Godrej Nirvaan RERA CA certificate - Sep 24-signed-part 1.pdf · uploaded 5 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Godrej Nirvaan RERA CA certificate - Sep 24-signed-part 1.pdf · uploaded 5 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Godrej Nirvaan RERA CA certificate - Sep 24-signed-part 2.pdf · uploaded 5 Nov 2024Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC Tower 1 and 3 _Nov 2024.pdf · uploaded 7 Dec 2024Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC Tower 1 and 3 _Nov 2024.pdf · uploaded 7 Dec 2024Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)Nirvaan T1 to T6 Form 4-signed.pdf · uploaded 7 Dec 2024Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC Tower 1 and 3 _Nov 2024.pdf · uploaded 7 Dec 2024Source
  • 1 Proforma of Allotment letterNirvaan Application Form Dec 2024.pdf · uploaded 28 Jan 2025Source
  • 1 Proforma of Allotment letterNirvaan Application Form Dec 2024.pdf · uploaded 28 Jan 2025Source
  • 1 Proforma of Allotment letterNirvaan Application Form Dec 2024.pdf · uploaded 28 Jan 2025Source
  • 1 Copy of Layout Approval (in case of layout)Nirvaan - Sanction plan.pdf · uploaded 30 Jan 2025Source
  • 1 Copy of Layout Approval (in case of layout)Nirvaan - Sanction plan.pdf · uploaded 30 Jan 2025Source
  • 1 Copy of Layout Approval (in case of layout)Nirvaan - Sanction plan.pdf · uploaded 30 Jan 2025Source
  • 1 OtherAmenities Nirvaan.pdf · uploaded 31 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD_Rera_Nirvaan_30Dec24-signed.pdf · uploaded 31 Jan 2025View
  • 1 OtherAmenities Nirvaan.pdf · uploaded 31 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD_Rera_Nirvaan_30Dec24-signed.pdf · uploaded 31 Jan 2025View
  • 1 OtherAmenities Nirvaan.pdf · uploaded 31 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD_Rera_Nirvaan_30Dec24-signed.pdf · uploaded 31 Jan 2025View
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Nirvaan society name reservation.pdf · uploaded 5 Feb 2025Source
  • 1 Proforma of Agreement for saleNirvaan Draft.pdf · uploaded 5 Feb 2025Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Nirvaan society name reservation.pdf · uploaded 5 Feb 2025Source
  • 1 Proforma of Agreement for saleNirvaan Draft.pdf · uploaded 5 Feb 2025Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Nirvaan society name reservation.pdf · uploaded 5 Feb 2025Source
  • 1 Proforma of Agreement for saleNirvaan Draft.pdf · uploaded 5 Feb 2025Source

Technical

  • DocumentDP Letter.pdf · uploaded 8 Aug 2019Source
  • DocumentLayout Phase 1.pdf · uploaded 8 Aug 2019Source
  • Document001_compressed Layout.pdf · uploaded 13 Aug 2019Source
  • DocumentDP CC - 10 Dec 2020.pdf · uploaded 23 Dec 2021Source
  • DocumentNirvaan - Sanction plan.pdf · uploaded 30 Jan 2025Source
  • DocumentNirvaan - Sanction plan.pdf · uploaded 30 Jan 2025Source
  • DocumentNirvaan - Sanction plan.pdf · uploaded 30 Jan 2025Source

Technical (Architect)

  • DocumentGodrej Nirvaan Architect Certificate June 2024.pdf · uploaded 1 Oct 2024Source
  • DocumentNirvaan Phase 1 Sep 24-signed.pdf · uploaded 22 Oct 2024Source
  • DocumentNirvaan Phase 1 Sep 24-signed.pdf · uploaded 22 Oct 2024Source
  • DocumentNirvaan Phase 1 Sep 24-signed.pdf · uploaded 22 Oct 2024Source

Technical (Engineer)

  • DocumentGodrej Nirvaan Engineer Certificate June 2024.pdf · uploaded 2 Oct 2024Source
  • DocumentGODREJ NIRVAAN PHASE 1_PDL_CERTIFICATE SEPT'24 - Final-signed.pdf · uploaded 22 Oct 2024Source
  • DocumentGODREJ NIRVAAN PHASE 1_PDL_CERTIFICATE SEPT'24 - Final-signed.pdf · uploaded 22 Oct 2024Source
  • DocumentGODREJ NIRVAAN PHASE 1_PDL_CERTIFICATE SEPT'24 - Final-signed.pdf · uploaded 22 Oct 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 40/3 pt, 40/4 pt

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1 premium, 2 premium, 1 premium a, 1 premium b, 1 luxe, 2 luxe1,176 units in all
Address
45/1, 45/3/1 pt, 45/3/2, 45/2/1 pt, 45/2/2, 45/4 pt, 45/5, 45/6, 45/9 pt, 45/12, 40/3 pt, 40/4 pt, 40/7 pt, 40/8 pt, 58/6, 58/7/1 pt, 58/7/2 pt, 58/11, 58/12 pt, 58/14 pt, 58/17 pt, 58/19, 58/20 pt, 58/21 pt, 83/4 pt, 83/7 pt, 128/3 pt, , Kalyan Bhiwandi road, Bhadvad & TembhgarPIN 421302
Village
Bhiwandi (M Corp.), Bhiwandi taluka
Land area for this project
31,635 sq m (3,40,519 sq ft)
Permissible built-up area
65,919 sq m (7,09,547 sq ft)
Sanctioned built-up area
58,646 sq m (6,31,263 sq ft)
Recreational open space
8,324 sq m (89,603 sq ft)
Designated bank account
76
Developed in phases
Yes

Survey, CTS, gat or plot numbers

40/3 pt40/4 pt40/7 pt40/8 pt45/145/1245/2/1 pt45/2/245/3/1 pt45/3/245/4 pt45/545/645/9 pt58/1158/12 pt58/14 pt58/17 pt58/1958/20 pt58/21 pt58/658/7/1 pt58/7/2 pt83/4 pt83/7 pt

Land as published on MahaRERA's project page

45/1,45/3/1 pt,45/3/2, 45/2/1 pt,45/2/2,45/4 pt,45/5, 45/6,45/9 pt,45/12, 40/3 pt,40/4 pt, 40/7 pt,40/8 pt,58/6,58/7/1 pt,58/7/2 pt,58/11, 58/12 pt,58/14 pt, 58/17 pt,58/19, 58/20 pt,58/21 pt, 83/4 pt,83/7 pt,128/3 pt,

Boundaries

North
18 meter wide road and TATA high tension line
South
Survey no 41
East
24 meter wide DP road
West
30 meter wide DP road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking1,176 units

1,047 of 1,176 units booked (89%), as the promoter reported to MahaRERA

1 premium · 196 units2 premium · 196 units1 premium a · 100 units1 premium b · 96 units1 luxe · 300 units2 luxe · 288 units
BuildingTypeCarpet areaUnitsBooked
Tower 11 premium37.84 sq m · 407 sq ft9695
Tower 11 premium38.02 sq m · 409 sq ft10098
Tower 22 premium53.63 sq m · 577 sq ft10088
Tower 22 premium56.62 sq m · 609 sq ft2120
Tower 22 premium56.69 sq m · 610 sq ft7573
Tower 31 premium a38.02 sq m · 409 sq ft100100
Tower 31 premium b37.84 sq m · 407 sq ft9696
Tower 41 luxe39.44 sq m · 425 sq ft10089
Show all 19 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Tower 42 luxe58.25 sq m · 627 sq ft4632
Tower 42 luxe58.7 sq m · 632 sq ft2511
Tower 42 luxe58.89 sq m · 634 sq ft2521
Tower 51 luxe39.44 sq m · 425 sq ft10089
Tower 52 luxe58.25 sq m · 627 sq ft4628
Tower 52 luxe58.7 sq m · 632 sq ft2512
Tower 52 luxe58.89 sq m · 634 sq ft2522
Tower 61 luxe39.44 sq m · 425 sq ft10096
Tower 62 luxe58.25 sq m · 627 sq ft4639
Tower 62 luxe58.7 sq m · 632 sq ft2524
Tower 62 luxe58.89 sq m · 634 sq ft2514

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology