Windsor Tower B
Deedo IDDP-THN-BZ4ACompletion was pushed back 4 months, to Jul 2032; no MahaRERA orders on record; 0% of its units are booked.
Bhayandar, Thane 400101 · by Grandbuild Land Developers Llp
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jul 2032
- This projectRegistered 11 Dec 2025, completion promised 31 Mar 2032, revised to 31 Jul 2032.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700081067
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700081067 | 11 Dec 2025 | 31 Mar 2032 | 31 Jul 2032 | Grandbuild Land Developers LLP | Project page |
Documents174
1 document held by Deedo, 173 filings listed on MahaRERA's project page
Finance
Show all 174 documentsShow fewer documents
Legal
- Other – LegalDeed of Confirmation - 5.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 6.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 7.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 8.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 9.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 10.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 1.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 2.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 3.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 4.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 5.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 6.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 7.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 8.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 9.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Confirmation - 10.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 1.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 2.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 3.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 4.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 5.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 6.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 7.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 8.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 9.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 10.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 1.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 2.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 3.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 4.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 5_11zon.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 6.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 7.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 8.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 9.pdf · uploaded 31 Mar 2025Source
- Other – LegalDeed of Rectification - 10.pdf · uploaded 31 Mar 2025Source
- Other – LegalRelease Deed Radhaswami 1.pdf · uploaded 31 Mar 2025Source
- Other – LegalRelease Deed Radhaswami 2.pdf · uploaded 31 Mar 2025Source
- Other – LegalRelease Deed Radhaswami 3.pdf · uploaded 31 Mar 2025Source
- Other – LegalRelease Deed Radhaswami 4.pdf · uploaded 31 Mar 2025Source
- Other – LegalRelease Deed Radhaswami 1.pdf · uploaded 31 Mar 2025Source
- Other – LegalRelease Deed Radhaswami 2.pdf · uploaded 31 Mar 2025Source
- Other – LegalRelease Deed Radhaswami 3.pdf · uploaded 31 Mar 2025Source
- Other – LegalRelease Deed Radhaswami 4.pdf · uploaded 31 Mar 2025Source
- Declaration Form BGRBLLP Form B Tower B.pdf · uploaded 8 Apr 2025Source
- Other – LegalDeed of Confirmation.pdf · uploaded 6 Oct 2025Source
- Other – LegalPR Card - 1.pdf · uploaded 1 Dec 2025Source
- Other – LegalPR Card - 2.pdf · uploaded 1 Dec 2025Source
- Other – LegalPR Card - 3.pdf · uploaded 1 Dec 2025Source
- Other – LegalPR Card - 4.pdf · uploaded 1 Dec 2025Source
- Other – LegalOther Legal - Document.pdf · uploaded 1 Dec 2025Source
- Other – LegalLegal Documents List.pdf · uploaded 1 Dec 2025Source
- Legal Title reportTitle Report.pdf · uploaded 1 Dec 2025Source
Migrated
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 20 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 20 Mar 2025Source
- 1 PAN Card1 PAN Card (6).pdf · uploaded 31 Mar 2025Source
- 1 a Details of encumbrances concerned to FinanceENCUMBRANCE MERGED.pdf · uploaded 31 Mar 2025Source
- 41 Other – LegalRelease Deed Radhaswami 1.pdf · uploaded 31 Mar 2025Source
- 40 Other – LegalDeed of Rectification - 10.pdf · uploaded 31 Mar 2025Source
- 39 Other – LegalDeed of Rectification - 9.pdf · uploaded 31 Mar 2025Source
- 38 Other – LegalDeed of Rectification - 8.pdf · uploaded 31 Mar 2025Source
- 37 Other – LegalDeed of Rectification - 7.pdf · uploaded 31 Mar 2025Source
- 36 Other – LegalDeed of Rectification - 6.pdf · uploaded 31 Mar 2025Source
- 35 Other – LegalDeed of Rectification - 5_11zon.pdf · uploaded 31 Mar 2025Source
- 34 Other – LegalDeed of Rectification - 4.pdf · uploaded 31 Mar 2025Source
- 33 Other – LegalDeed of Rectification - 3.pdf · uploaded 31 Mar 2025Source
- 32 Other – LegalDeed of Rectification - 2.pdf · uploaded 31 Mar 2025Source
- 31 Other – LegalDeed of Rectification - 1.pdf · uploaded 31 Mar 2025Source
- 30 Other – LegalDeed of Rectification - 10.pdf · uploaded 31 Mar 2025Source
- 29 Other – LegalDeed of Rectification - 9.pdf · uploaded 31 Mar 2025Source
- 28 Other – LegalDeed of Rectification - 8.pdf · uploaded 31 Mar 2025Source
- 42 Other – LegalRelease Deed Radhaswami 2.pdf · uploaded 31 Mar 2025Source
- 43 Other – LegalRelease Deed Radhaswami 3.pdf · uploaded 31 Mar 2025Source
- 44 Other – LegalRelease Deed Radhaswami 4.pdf · uploaded 31 Mar 2025Source
- 45 Other – LegalRelease Deed Radhaswami 1.pdf · uploaded 31 Mar 2025Source
- 46 Other – LegalRelease Deed Radhaswami 2.pdf · uploaded 31 Mar 2025Source
- 47 Other – LegalRelease Deed Radhaswami 3.pdf · uploaded 31 Mar 2025Source
- 48 Other – LegalRelease Deed Radhaswami 4.pdf · uploaded 31 Mar 2025Source
- 26 Other – LegalDeed of Rectification - 6.pdf · uploaded 31 Mar 2025Source
- 1 Other – LegalDeed of Confirmation - 1.pdf · uploaded 31 Mar 2025Source
- 2 Other – LegalDeed of Confirmation - 2.pdf · uploaded 31 Mar 2025Source
- 3 Other – LegalDeed of Confirmation - 3.pdf · uploaded 31 Mar 2025Source
- 4 Other – LegalDeed of Confirmation - 4.pdf · uploaded 31 Mar 2025Source
- 5 Other – LegalDeed of Confirmation - 5.pdf · uploaded 31 Mar 2025Source
- 6 Other – LegalDeed of Confirmation - 6.pdf · uploaded 31 Mar 2025Source
- 7 Other – LegalDeed of Confirmation - 7.pdf · uploaded 31 Mar 2025Source
- 8 Other – LegalDeed of Confirmation - 8.pdf · uploaded 31 Mar 2025Source
- 9 Other – LegalDeed of Confirmation - 9.pdf · uploaded 31 Mar 2025Source
- 10 Other – LegalDeed of Confirmation - 10.pdf · uploaded 31 Mar 2025Source
- 11 Other – LegalDeed of Confirmation - 1.pdf · uploaded 31 Mar 2025Source
- 12 Other – LegalDeed of Confirmation - 2.pdf · uploaded 31 Mar 2025Source
- 13 Other – LegalDeed of Confirmation - 3.pdf · uploaded 31 Mar 2025Source
- 15 Other – LegalDeed of Confirmation - 5.pdf · uploaded 31 Mar 2025Source
- 16 Other – LegalDeed of Confirmation - 6.pdf · uploaded 31 Mar 2025Source
- 17 Other – LegalDeed of Confirmation - 7.pdf · uploaded 31 Mar 2025Source
- 18 Other – LegalDeed of Confirmation - 8.pdf · uploaded 31 Mar 2025Source
- 19 Other – LegalDeed of Confirmation - 9.pdf · uploaded 31 Mar 2025Source
- 20 Other – LegalDeed of Confirmation - 10.pdf · uploaded 31 Mar 2025Source
- 21 Other – LegalDeed of Rectification - 1.pdf · uploaded 31 Mar 2025Source
- 22 Other – LegalDeed of Rectification - 2.pdf · uploaded 31 Mar 2025Source
- 23 Other – LegalDeed of Rectification - 3.pdf · uploaded 31 Mar 2025Source
- 24 Other – LegalDeed of Rectification - 4.pdf · uploaded 31 Mar 2025Source
- 25 Other – LegalDeed of Rectification - 5.pdf · uploaded 31 Mar 2025Source
- 27 Other – LegalDeed of Rectification - 7.pdf · uploaded 31 Mar 2025Source
- 14 Other – LegalDeed of Confirmation - 4.pdf · uploaded 31 Mar 2025Source
- 1 Declaration about Commencement CertificateDECLARATION AOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 31 Mar 2025Source
- 1 CERSAI detailsCERSAI REPORT.pdf · uploaded 31 Mar 2025Source
- 1 Deviation Report with respect to Allotment letterNO DEVIATION IN ALLOTMENT.pdf · uploaded 31 Mar 2025Source
- 1 b Details of encumbrances concerned to LegalENCUMBRANCE MERGED.pdf · uploaded 31 Mar 2025Source
- 1 Deviation Report with respect to model copy of AgreementNO DEVIATION IN AGREEMENT.pdf · uploaded 31 Mar 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectDISCLOSURE OF SECURED UNSECURED LOAN.pdf · uploaded 31 Mar 2025Source
- 1 Proforma of Allotment letterAllotment Letter_Tower B.pdf · uploaded 3 Apr 2025Source
- 1 Copy of Layout Approval (in case of layout)Layout 1st page.pdf · uploaded 8 Apr 2025Source
- 1 Declaration in FORM BGRBLLP Form B Tower B.pdf · uploaded 8 Apr 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentWing B 8_11zon.pdf · uploaded 8 Apr 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentpage 4.pdf · uploaded 8 Apr 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentPage 3.pdf · uploaded 8 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentPage 2.pdf · uploaded 8 Apr 2025Source
- 1 Other – TechnicalORDER NO 50.pdf · uploaded 8 Apr 2025Source
- 1 Proforma of Agreement for saleAgreement for sale.pdf · uploaded 8 Apr 2025Source
- 2 Other – Technicalcc verification screenshot.pdf · uploaded 9 Apr 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A - Promoter - Tower B.pdf · uploaded 12 May 2025Source
- 1 Disclosure of Interest in Other Real Estate Organizations1 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 12 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Tower B - CA Certificate.pdf · uploaded 22 May 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 17 Sep 2025Source
- 1 Other – FinanceBank declaration.pdf · uploaded 4 Oct 2025Source
- 49 Other – LegalDeed of Confirmation.pdf · uploaded 6 Oct 2025Source
- 3 Other – TechnicalDECLARATION OF CC.pdf · uploaded 6 Oct 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentPage 5.pdf · uploaded 7 Nov 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentPage 6.pdf · uploaded 7 Nov 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B.pdf · uploaded 7 Nov 2025Source
- 4 Other – TechnicalOther Technical.pdf · uploaded 10 Nov 2025Source
- 1 Copy of the legal title reportTitle Report.pdf · uploaded 1 Dec 2025Source
- 50 Other – LegalPR Card - 1.pdf · uploaded 1 Dec 2025Source
- 51 Other – LegalPR Card - 2.pdf · uploaded 1 Dec 2025Source
- 52 Other – LegalPR Card - 3.pdf · uploaded 1 Dec 2025Source
- 53 Other – LegalPR Card - 4.pdf · uploaded 1 Dec 2025Source
- 54 Other – LegalOther Legal - Document.pdf · uploaded 1 Dec 2025Source
- 55 Other – LegalLegal Documents List.pdf · uploaded 1 Dec 2025Source
- 2 Other – FinanceBank Decalration - Other finance.pdf · uploaded 1 Dec 2025Source
- Form 1Arch Cert_TOWER B.pdf · uploaded 20 Apr 2026Source
- Form 1WS Arch Cert_Tower B.pdf · uploaded 20 Apr 2026Source
- Form 2Eng Cert_Tower B.pdf · uploaded 20 Apr 2026Source
- Form 2Engg Cert_Tower B.pdf · uploaded 20 Apr 2026Source
- Form 3CA Certificate_Tower_B_V1 - Revised_1.pdf · uploaded 20 Apr 2026Source
- Form 3CA Certificate_Tower_B_V1 - Revised_1.pdf · uploaded 20 Apr 2026Source
- Disclosure of Sold and Booked InventorySoldunsold_Tower B.pdf · uploaded 20 Apr 2026Source
- Disclosure of Sold and Booked InventoryTower B - Sold Unsold.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A_Windsor_Tower_B.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 1Architect Certificate Tower B.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Engineer Cert_Ws_Tower B.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3CA Certificate_Tower_B_.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)WS_Tower B_Form_5_FY_25-26.pdf · uploaded 28 Sep 2026Source
Technical
- DocumentLayout 1st page.pdf · uploaded 8 Apr 2025Source
- DocumentPage 2.pdf · uploaded 8 Apr 2025Source
- DocumentPage 3.pdf · uploaded 8 Apr 2025Source
- Documentpage 4.pdf · uploaded 8 Apr 2025Source
- DocumentWing B 8_11zon.pdf · uploaded 8 Apr 2025Source
- Other – TechnicalORDER NO 50.pdf · uploaded 8 Apr 2025Source
- Other – Technicalcc verification screenshot.pdf · uploaded 9 Apr 2025Source
- Other – TechnicalDECLARATION OF CC.pdf · uploaded 6 Oct 2025Source
- DocumentPage 6.pdf · uploaded 7 Nov 2025Source
- DocumentPage 5.pdf · uploaded 7 Nov 2025Source
- Other – TechnicalOther Technical.pdf · uploaded 10 Nov 2025Source
Technical (Architect)
- DocumentArchitect Certificate Tower B.pdf · uploaded 20 Jul 2026Source
Technical (Engineer)
- DocumentEngineer Cert_Ws_Tower B.pdf · uploaded 20 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 2, 3
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- LANDOWNER 1BHK, LANDOWNER 2BHK, Landowner shop, Sale shop264 units in all
- Address
- S.no. 578 (Old) 246 (New) H.no. 4, S. No. 644 (Old) 223 (New) H. No. 1, 2, 3, S.no. 645 (Old) 244 (New) H. No. 2, 3, 4, S.no. 649 (Old) 243 (New) H. No. 5, Maheshwari Bhavan Road, Bhayander WestPIN 400101
- Village
- Bhayandar, Thane taluka
- Location
- 19.29050, 72.84717
- Land area for this project
- 2,900 sq m (31,215 sq ft)
- Permissible built-up area
- 45,079 sq m (4,85,226 sq ft)
- Sanctioned built-up area
- 23,642 sq m (2,54,475 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 35
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S.NO. 578 (OLD) 246 (NEW) H.NO. 4, S. NO. 644 (OLD) 223 (NEW) H. NO. 1,2,3, S.NO. 645 (OLD) 244 (NEW) H. NO. 2,3,4, S.NO. 649 (OLD) 243 (NEW) H. NO. 5
Boundaries
- North
- Khadi
- South
- 18 Mtr D P Road
- East
- Windermere
- West
- Radhoswami Satasang
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking264 units
0 of 264 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| LANDOWNER 1BHK | 52.92 sq m · 570 sq ft | 59 | 0 |
| LANDOWNER 2BHK | 70.88 sq m · 763 sq ft | 66 | 0 |
| LANDOWNER 2BHK | 70.9 sq m · 763 sq ft | 66 | 0 |
| LANDOWNER 2BHK | 72.72 sq m · 783 sq ft | 66 | 0 |
| Landowner shop | 78.23 sq m · 842 sq ft | 1 | 0 |
| Landowner shop | 90.14 sq m · 970 sq ft | 1 | 0 |
| Landowner shop | 92.38 sq m · 994 sq ft | 1 | 0 |
| Landowner shop | 95.14 sq m · 1,024 sq ft | 1 | 0 |
Show all 11 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Sale shop | 84.14 sq m · 906 sq ft | 1 | 0 |
| Sale shop | 85.26 sq m · 918 sq ft | 1 | 0 |
| Sale shop | 93.55 sq m · 1,007 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Connectfour Design Studio LLP | — |
| Chartered accountant | Archana Parikh | — |
| Engineer | Sachin S Shirke | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Bhayandar
- Prakash Bhavan Co-Operative Housing Society LimitedRERA PM1330002602503
- Salasar SiddharthRERA PM1330002602460
- 711 SkyviewRERA PR1330002602191
- ZenithRERA PR1330002602162
- LotusRERA PR1331012602116
- Shanti Signature By Ashit ShahRERA PC1330002601988
- Salasar Grandeur IIRERA PR1330002601948
- Chandresh TerraceRERA PR1330002601604
All 118 projects in Bhayandar · Compare Windsor Tower B with another project